Summary
PRRES20250724
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASMENT. COVERED DECK.
03/06/2025
03/13/2025
09/07/2025
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ELECTRICAL INVESTMENTS, Address:8014 REEDER ST, Phone:(816) 210-1597  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
whitney@newmarkhomeskc.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 03/13/2025
Water Meter Fee $748.03 $748.03 Paid 03/13/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 03/13/2025
Right of Way Permit Fee $85.00 $85.00 Paid 03/13/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 03/13/2025
Valuation Fee New Single Family $1,637.42 $1,637.42 Paid 03/13/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Erosion Control Inspection Residential Pending
Occupancy Inspection - Codes Residential Pending
Driveway Inspection Pending
Misc
Corrective Action Required
09/16/2025
9/16/25 Tyler S. DW is in compliance with city standards. Approve to pour.
Sidewalk Inspection Pending
Misc
Corrective Action Required
09/16/2025
9/16/25 Tyler S. SW is in compliance with city and ADA specs .Approve to pour.
Footing Inspection - Residential Passed 3/20/2025 3/20/2025 03/20/2025
Sewer Service Inspection - R Passed 4/18/2025 4/18/2025 04/18/2025
Water Service Inspection - R Passed 4/18/2025 4/18/2025 04/18/2025
Underslab Plumbing Inspection - Residential Passed 4/28/2025 4/28/2025 04/28/2025
All Rough Inspection - Residential Partial 6/9/2025 6/9/2025 06/09/2025
Misc
Informational
06/09/2025
Portal frame at garage ok Front and back porch ceiling ok to cover
Electrical Service Inspection Passed 8/13/2025 8/13/2025 08/13/2025
Gas Service Inspection - Residential Passed 8/13/2025 8/13/2025 08/13/2025
All Rough Inspection - Residential Failed 8/13/2025 8/13/2025 08/13/2025
Misc
Informational
06/09/2025
Portal frame at garage ok Front and back porch ceiling ok to cover
Misc
Corrective Action Required
08/13/2025
2829 SW Heartland Rd - Add 2 2x4 under LVL in owners closet - Add king stud to doorway owners suite to owners bathroom - Add king stud to each side of window in owners suite -
All Rough Inspection - Residential Passed 8/18/2025 8/18/2025 08/18/2025
Misc
Informational
08/13/2025
Portal frame at garage ok Front and back porch ceiling ok to cover
Misc
Resolved
08/18/2025
-
Driveway Inspection Partial 9/16/2025 9/16/2025 09/16/2025
Misc
Corrective Action Required
09/16/2025
9/16/25 Tyler S. DW is in compliance with city standards. Approve to pour.
Sidewalk Inspection Partial 9/16/2025 9/16/2025 09/16/2025
Misc
Corrective Action Required
09/16/2025
9/16/25 Tyler S. SW is in compliance with city and ADA specs .Approve to pour.
Documents & Images
Date Uploaded File Type Document Name
03/06/2025 HKF179 - Lee's Summit Permit Application Packet
03/11/2025 Permit Codes Residential Plan Review
03/13/2025 Plot Plan APPROVED PLOT PLAN
03/13/2025 Approved Plans APPROVED PLANS
03/13/2025 Permit Codes Residential Plan Review
03/13/2025 Permit DS Building Permit
03/13/2025 Receipt Receipt for transaction:2025-001544
03/20/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/28/2025 Letter INSPECTION SUMMARY
05/02/2025 3RD Party Insp Report 2829 SW Heartland Rd_DECK PIER INSP_2025-05-01
06/09/2025 Letter INSPECTION SUMMARY
08/13/2025 Letter INSPECTION SUMMARY
08/13/2025 Letter INSPECTION SUMMARY
08/13/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
09/16/2025 Letter INSPECTION SUMMARY
09/16/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home