Summary
PRRES20250690
Building Permit - Residential
Issued
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK.
03/04/2025
03/21/2025
09/03/2025
Locations
Contacts
TRUMARK HOMES, LLC, Address:PO BOX 728, Phone:(816) 564-5613  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
MARK A YANCIK, Address:508 nw manor dr  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
TRUMARKHOMES.KYLE@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 03/21/2025
Water Meter Fee $748.03 $748.03 Paid 03/21/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 03/21/2025
Right of Way Permit Fee $85.00 $85.00 Paid 03/21/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 03/21/2025
Valuation Fee New Single Family $1,604.48 $1,604.48 Paid 03/21/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Erosion Control Inspection Residential Pending
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/25/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain perimeter BMPs -Maintain gravel drive with min 6" lift of min 3/4" gravel
Erosion Control Inspection Residential Failed 6/24/2025 6/24/2025 03/18/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/18/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Install erosion control methods where missing at front of lot -Replace worn out, overgrown gutter buddy
Erosion Control Inspection Residential Failed 03/27/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/18/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Install erosion control methods where missing at front of lot -Replace worn out, overgrown gutter buddy
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/27/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3/27/25 Complete corrections from previous failed inspection -Post address -Clean streets -Complete missing erosion control at perimeter **Stop work will be issued if not corrected in 2 business days
Footing Inspection - Residential Failed 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/27/2025
Approved by David Ainsworth on 3/26/25
Footing Inspection - Residential Passed 03/27/2025
Misc
Informational
03/27/2025
Approved by David Ainsworth on 3/26/25
Erosion Control Inspection Residential Partial 3/28/2025 3/28/2025 03/28/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
03/28/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Install erosion control methods where missing at front of lot -Replace worn out, overgrown gutter buddy
DCM3 ESC REQUIRED 2 DAY
Resolved
03/28/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3/27/25 Complete corrections from previous failed inspection -Post address -Clean streets -Complete missing erosion control at perimeter **Stop work will be issued if not corrected in 2 business days
Erosion Control Inspection Residential Partial 04/16/2025
Underslab Plumbing Inspection - Residential Passed 4/16/2025 4/16/2025 04/16/2025
Sewer Service Inspection - R Passed 4/22/2025 4/22/2025 04/22/2025
Erosion Control Inspection Residential Failed 4/30/2025 04/30/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/30/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN STREET AND RESTORE EROSION CONTROL TO COMPLIANCE
Water Service Inspection - R Passed 4/30/2025 4/30/2025 04/30/2025
All Rough Inspection - Residential Failed 6/25/2025 6/25/2025 06/25/2025
Misc
Corrective Action Required
06/25/2025
6/25/25 Inspection for "Need inspection on garage door portal framing, front porch ceiling and back deck ceiling only" -PFH- seal nail penetrations in moisture barrier -Front ceiling - OK to cover -Back porch ceiling- Already covered -Back CS-PF - Complete nailing pattern at exterior
Erosion Control Inspection Residential Failed 6/25/2025 6/25/2025 06/25/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/30/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain perimeter BMPs -Maintain gravel drive with min 6" lift of min 3/4" gravel
All Rough Inspection - Residential Partial 6/30/2025 6/30/2025 06/30/2025
Misc
Resolved
06/30/2025
6/25/25 Inspection for "Need inspection on garage door portal framing, front porch ceiling and back deck ceiling only" -PFH- seal nail penetrations in moisture barrier -Front ceiling - OK to cover -Back porch ceiling- Already covered -Back CS-PF - Complete nailing pattern at exterior
Misc
Informational
06/30/2025
Portal frame at garage ok Cs-pf ok at rear Back porch ok to cover
All Rough Inspection - Residential Passed 7/11/2025 7/11/2025 07/11/2025
Misc
Resolved
07/11/2025
Portal frame at garage ok Cs-pf ok at rear Back porch ok to cover
Gas Service Inspection - Residential Passed 7/11/2025 7/11/2025 07/11/2025
Electrical Service Inspection Passed 7/11/2025 7/11/2025 07/11/2025
Documents & Images
Date Uploaded File Type Document Name
03/04/2025 WOODSIDE LOT 192 PERMIT APPLICATION
03/07/2025 Permit Codes Residential Plan Review
03/07/2025 Plot Plan APPROVED PLOT PLAN
03/07/2025 Approved Plans APPROVED PLANS
03/07/2025 Permit Codes Residential Plan Review
03/18/2025 Letter INSPECTION SUMMARY
03/21/2025 Permit DS Building Permit
03/21/2025 Receipt Receipt for transaction:2025-001714
03/26/2025 3RD Party Insp Report M L Crose 2237 NW Killarney Ln Ln LSMO Footing Inspection Report Pg 1 3-26-25
03/26/2025 3RD Party Insp Report M L Crose 2237 NW Killarney Ln Ln LSMO Footing Inspection Report Pg 2 3-26-25
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
06/25/2025 Letter INSPECTION SUMMARY
06/25/2025 Letter INSPECTION SUMMARY
06/30/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home