Permit Application Status

PRRES20250594


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20250594
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - UNCOVERED DECK STOP WORK ORDER generated on 04/23/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 04/24/2025 12:00 AM by username 'Jamie Simerly'.
02/25/2025
03/10/2025
08/31/2025
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
kevin higdon, Address:po box 847  
KEVIN@HIGDONBUILDERS.COM  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
INTERSTATE ELECTRICAL CONSTRUCTION, Address:3710 ROBINSON PIKE RD, Phone:(816) 761-0200  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 03/10/2025
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 03/10/2025
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 03/10/2025
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 03/10/2025
8350015-Water Meter Fee $748.03 $748.03 Paid 03/10/2025
9110078-Valuation Fee New Single Family $1,736.98 $1,736.98 Paid 03/10/2025
$0.00 $0.00 $0.00 N/A
$0.00 $0.00 $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/24/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - CLEAN OUT STORM INLET.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/24/2025
4-21-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 4-23-25 Dustin A, Silt fence is still down in areas. 04-24-25 Jamie S, Erosion control has been put in place.
All Rough Inspection - Residential Pending
Misc
Corrective Action Required
06/13/2025
-GB bracing to be inspected before covering -missing wsp or lib bracing in garage -have an engineer address ceiling joist and rafters to top plate connection through out entire house -ceiling joist above double car garage not landing on top plate -boca plate needed in laundry room on dryer vent -provide proper hangar in foyer for 2x12 -double king stud needed at patio door -fire block at fireplace -ceiling joist to roof rafter in master bedroom need another nail -boca plate on vent need to be 2” below -seal all penetration in return air joist space and complete panning in furnace downs -in basement bathroom bed 3 pex in fur down -bed 3 needs fire blocking on exterior wall -sister sud in bed 3 at over notched for anchor bolts -seal dead space in bed3 shower -anchor bolts in basement need tightened -stud needed in bed 4 exterior corner -have engineer address hole in floor joist less than 2” apart -
Footing Inspection - Residential Passed 3/17/2025 3/17/2025 03/17/2025
Misc
Corrective Action Required
03/17/2025
UFER 1 ft. Back on East wall
Sewer Service Inspection - R Passed 4/1/2025 4/1/2025 04/01/2025
Water Service Inspection - R Partial 4/1/2025 4/1/2025 04/01/2025
Misc
Corrective Action Required
04/01/2025
- Poly 10' out of foundation
Water Service Inspection - R Passed 4/2/2025 4/2/2025 04/02/2025
Misc
Resolved
04/02/2025
- Poly 10' out of foundation
Erosion Control Inspection Residential Failed 4/2/2025 04/02/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/02/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - CLEAN OUT STORM INLET.
Underslab Plumbing Inspection - Residential Passed 4/9/2025 4/9/2025 04/09/2025
Erosion Control Inspection Residential Failed 4/21/2025 4/21/2025 04/21/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/02/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - CLEAN OUT STORM INLET.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/21/2025
4-21-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 4/23/2025 4/23/2025 04/23/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/21/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - CLEAN OUT STORM INLET.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/21/2025
4-21-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 4-23-25 Dustin A, Silt fence is still down in areas.
Erosion Control Inspection Residential Partial 4/24/2025 4/24/2025 04/24/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/23/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - CLEAN OUT STORM INLET.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/23/2025
4-21-25 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 4-23-25 Dustin A, Silt fence is still down in areas. 04-24-25 Jamie S, Erosion control has been put in place.
Piers/Caissons Inspection - Residential Passed 5/30/2025 5/30/2025 05/30/2025
All Rough Inspection - Residential Failed 6/13/2025 6/13/2025 06/13/2025
Misc
Corrective Action Required
06/13/2025
-GB bracing to be inspected before covering -missing wsp or lib bracing in garage -have an engineer address ceiling joist and rafters to top plate connection through out entire house -ceiling joist above double car garage not landing on top plate -boca plate needed in laundry room on dryer vent -provide proper hangar in foyer for 2x12 -double king stud needed at patio door -fire block at fireplace -ceiling joist to roof rafter in master bedroom need another nail -boca plate on vent need to be 2” below -seal all penetration in return air joist space and complete panning in furnace downs -in basement bathroom bed 3 pex in fur down -bed 3 needs fire blocking on exterior wall -sister sud in bed 3 at over notched for anchor bolts -seal dead space in bed3 shower -anchor bolts in basement need tightened -stud needed in bed 4 exterior corner -have engineer address hole in floor joist less than 2” apart -
Documents & Images
Date Uploaded File Type Document Name
02/25/2025 Lees Summit Residental Permit Application 3916 sw flintrock
02/25/2025 exciseapplication 3916 sw flintrock
02/28/2025 Lees Summit Residental Permit Application 3916 sw flintrock
02/28/2025 Permit Codes Residential Plan Review
02/28/2025 Lees Summit Residental Permit Application 3916 sw flintrock1
03/04/2025 Permit Codes Residential Plan Review
03/10/2025 Approved Plans APPROVED PLANS
03/10/2025 Plot Plan APPROVED PLOT PLAN
03/10/2025 Permit Codes Residential Plan Review
03/10/2025 Permit DS Building Permit
03/10/2025 Receipt Receipt for transaction:2025-001398
03/17/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/21/2025 Letter INSPECTION SUMMARY
04/21/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter Stop Work Order
04/24/2025 Letter INSPECTION SUMMARY
05/30/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home