Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
Footing Inspection - Residential
|
Passed
|
12/7/2023
|
12/7/2023
|
12/07/2023
|
Sewer Service Inspection - R
|
Passed
|
1/23/2024
|
1/23/2024
|
01/23/2024
|
Water Service Inspection - R
|
Partial
|
1/23/2024
|
1/23/2024
|
01/23/2024
|
Water Service Inspection - R
|
Passed
|
1/29/2024
|
1/29/2024
|
01/29/2024
|
Underslab Plumbing Inspection - Residential
|
Passed
|
2/8/2024
|
2/8/2024
|
02/08/2024
|
Suspended Slab Inspection
|
Passed
|
2/14/2024
|
2/14/2024
|
02/14/2024
|
Suspended Slab Inspection
|
Passed
|
|
3/6/2024
|
03/06/2024
|
Gas Service Inspection - Residential
|
Passed
|
4/24/2024
|
4/24/2024
|
04/24/2024
|
All Rough Inspection - Residential
|
Failed
|
4/24/2024
|
4/24/2024
|
04/24/2024
|
|
Misc
Corrective Action Required
|
Electrical Service Inspection
|
Failed
|
4/24/2024
|
4/24/2024
|
04/24/2024
|
|
Misc
Corrective Action Required
|
Electrical Service Inspection
|
Passed
|
4/26/2024
|
4/26/2024
|
04/26/2024
|
|
Misc
|
All Rough Inspection - Residential
|
Passed
|
4/26/2024
|
4/26/2024
|
04/26/2024
|
|
Misc
|
Driveway Inspection
|
Partial
|
|
5/24/2024
|
05/24/2024
|
|
Misc
|
Sidewalk Inspection
|
Partial
|
|
5/24/2024
|
05/24/2024
|
|
Misc
|
Erosion Control Inspection Residential
|
Partial
|
|
|
06/03/2024
|
|
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
|
Erosion Control Inspection Residential
|
Passed
|
6/5/2024
|
6/5/2024
|
06/05/2024
|
|
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
|
Driveway Inspection
|
Passed
|
6/5/2024
|
6/13/2024
|
06/13/2024
|
|
Misc
|
Sidewalk Inspection
|
Passed
|
6/5/2024
|
6/13/2024
|
06/13/2024
|
|
Misc
|
Erosion Control Inspection Residential
|
Passed
|
|
6/14/2024
|
06/14/2024
|
|
DCM3 ESC REQUIRED 2 DAY
|
Occupancy Inspection - Codes Residential
|
Failed
|
6/25/2024
|
6/25/2024
|
06/25/2024
|
|
Misc
Corrective Action Required
|
Plot Plan Inspection
|
Passed
|
|
6/26/2024
|
06/26/2024
|
Occupancy Inspection - Codes Residential
|
Full C of O
|
6/26/2024
|
6/26/2024
|
06/26/2024
|
|
Misc
|