Summary
PRRES20221051
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFISHED BASEMENT - COVERED DECK
03/21/2022
06/07/2022
09/18/2022
10/04/2023
Locations
Contacts
SPELLERBERG ENTERPRISES LLC, Address:613 NE VIEWPARK DR, Phone:(816) 550-5535  
Billy Spellerberg, Address:613 ne viewpark dr  
SPELLERBERGENTERPRISES@GMAIL.COM  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
NEW HEIGHTS ELECTRIC LLC, Address:P O BOX 163, Phone:(816) 625-9504  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $510.00 $510.00 Paid 06/07/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/07/2022
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/07/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 06/07/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 06/07/2022
9110078-Valuation Fee New Single Family $1,164.81 $1,164.81 Paid 06/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/8/2022 (2:30) 6/8/2022 06/08/2022
Underslab Plumbing Inspection - Residential Failed 7/15/2022 7/15/2022 07/15/2022
Misc
Corrective Action Required
07/15/2022
install erosion control correct interior drain tile and secure. drain tile is above the plumbing and floor.
Erosion Control Inspection Residential Failed 7/15/2022 07/15/2022
DCM5 ESC INSP DENIED
Corrective Action Required
07/15/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Sewer Service Inspection - R Passed 7/18/2022 (8:30) 7/18/2022 07/18/2022
Water Service Inspection - R Passed 7/20/2022 07/20/2022
Underslab Plumbing Inspection - Residential Failed 7/22/2022 7/22/2022 07/22/2022
Misc
Corrective Action Required
07/15/2022
INSPECTION DENIED EROSION CONTROL NOT IN COMPLIANCE. Mitchell Schwarz 07/22/2022 7:58 AM install erosion control correct interior drain tile and secure. drain tile is above the plumbing and floor.
Erosion Control Inspection Residential Failed 7/22/2022 07/22/2022
DCM5 ESC INSP DENIED
Corrective Action Required
07/15/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/22/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Underslab Plumbing Inspection - Residential Passed 8/3/2022 8/3/2022 08/03/2022
Misc
Resolved
08/03/2022
INSPECTION DENIED EROSION CONTROL NOT IN COMPLIANCE. Mitchell Schwarz 07/22/2022 7:58 AM install erosion control correct interior drain tile and secure. drain tile is above the plumbing and floor.
Piers/Caissons Inspection - Residential Passed 9/19/2022 (11:15) 9/19/2022 09/19/2022
Electrical Service Inspection Failed 3/1/2023 3/1/2023 03/01/2023
Misc
Corrective Action Required
03/01/2023
Label /identify ufer ground at both ends
Gas Service Inspection - Residential Passed 3/1/2023 3/1/2023 03/01/2023
All Rough Inspection - Residential Failed 3/1/2023 3/1/2023 03/01/2023
Misc
Corrective Action Required
03/01/2023
-address rear slider wall not framed to plans Plans call for windows -address bored through successive studs in master bath load bearing wall -provide support for furr down to floor joists above -anchor bolts to be in the middle 1/3 of sill plate In basement -fire block vertically to horizontally every 10’ in basement -SW basement window to be cspf -fire block NW basement bed wall to ceiling space -fire block all furr down ends in basement -complete cspf exterior nailing throughout
Electrical Service Inspection Passed 3/10/2023 3/10/2023 03/10/2023
Misc
Resolved
03/10/2023
Label /identify ufer ground at both ends
All Rough Inspection - Residential Passed 3/10/2023 3/10/2023 03/10/2023
Misc
Resolved
03/10/2023
-address rear slider wall not framed to plans Plans call for windows -address bored through successive studs in master bath load bearing wall -provide support for furr down to floor joists above -anchor bolts to be in the middle 1/3 of sill plate In basement -fire block vertically to horizontally every 10’ in basement -SW basement window to be cspf -fire block NW basement bed wall to ceiling space -fire block all furr down ends in basement -complete cspf exterior nailing throughout
Driveway Inspection Partial 5/22/2023 5/22/2023 05/22/2023
Misc
Informational
05/22/2023
5-22-23 RH. Driveway has been formed up and aggregate is placed and compacted. Approved to pour.
Driveway Inspection Passed 5/29/2023 5/29/2023 05/30/2023
Misc
Informational
05/22/2023
5-22-23 RH. Driveway has been formed up and aggregate is placed and compacted. Approved to pour. 5-30-23 RH. Driveway meets LS and ADA specification.
Sidewalk Inspection Passed 7/27/2023 7/27/2023 08/21/2023
Misc
Informational
07/27/2023
7-27-23 BR Sidewalk is framed and ready for concrete. 8-21-23 BR Sidewalk is constructed to LS specification
Sidewalk Inspection Partial 9/5/2023 09/05/2023
Misc
Informational
07/27/2023
7-27-23 BR Sidewalk is framed and ready for concrete. 9-5-23 A.A Sidewalk on south side of property is framed . Aggregate is compacted. Slopes are in compliance. Conditions can change, Approved to pour ,
Sidewalk Inspection Partial 9/12/2023 9/12/2023 09/11/2023
Misc
Informational
09/05/2023
7-27-23 BR Sidewalk is framed and ready for concrete. 9-5-23 A.A Sidewalk on south side of property is framed . Aggregate is compacted. Slopes are in compliance. Conditions can change, Approved to pour , 9-11-23 A.A Conditions have not changed. Not poured yet
Sidewalk Inspection Passed 9/18/2023 9/18/2023 09/18/2023
Misc
Informational
09/11/2023
7-27-23 BR Sidewalk is framed and ready for concrete. 9-5-23 A.A Sidewalk on south side of property is framed . Aggregate is compacted. Slopes are in compliance. Conditions can change, Approved to pour , 9-11-23 A.A Conditions have not changed. Not poured yet 9-18-23 A.A sidewalk poured. Slopes are in compliance . Passed
Plot Plan Inspection Passed 09/27/2023
Erosion Control Inspection Residential Passed 09/27/2023
DCM5 ESC INSP DENIED
Resolved
09/27/2023
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
DCM3 ESC REQUIRED 2 DAY
Resolved
09/27/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Occupancy Inspection - Codes Residential Failed 9/27/2023 9/27/2023 09/27/2023
Misc
Corrective Action Required
09/27/2023
GFCI protection for outlets under kitchen island sink -lock out for breaker for all hardwired appliances in kitchen -address post to beam connection at deck. Beams resting on posts not connected
Occupancy Inspection - Codes Residential Failed 10/3/2023 10/3/2023 10/03/2023
Misc
Corrective Action Required
09/27/2023
-address post to beam connection at deck. Beams resting on posts not connected (Beams still not connected to post at deck) engineer letter does not address this.
Occupancy Inspection - Codes Residential Full C of O 10/04/2023
Misc
Resolved
10/04/2023
-address post to beam connection at deck. Beams resting on posts not connected (Beams still not connected to post at deck) engineer letter does not address this.
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home