Permit Application Status

PRRES20220470


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220470
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - FINISHED AND UNFINISHED BASEMENT - COVERED PATIO
02/08/2022
02/15/2022
08/08/2022
12/19/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $450.00 $450.00 Paid 02/15/2022
Right of Way Permit Fee $85.00 $85.00 Paid 02/15/2022
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 02/15/2022
Valuation Fee New Single Family $1,113.38 $1,113.38 Paid 02/15/2022
Water Tap Fee $3,655.00 $3,655.00 Paid 02/15/2022
Water Meter Fee $479.24 $479.24 Paid 02/15/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 12/01/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 3/9/2022 (11:30) 3/9/2022 03/09/2022
Misc
Corrective Action Required
03/09/2022
cold weather protection need be in place to pour do not pour
Sewer Service Inspection - R Passed 3/17/2022 (9:15) 3/17/2022 03/17/2022
Water Service Inspection - R Partial 3/21/2022 (11:00) 3/21/2022 03/21/2022
Water Service Inspection - R Passed 3/22/2022 (9:30) 3/22/2022 03/22/2022
Erosion Control Inspection Residential Failed 3/25/2022 03/25/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/25/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Underslab Plumbing Inspection - Residential Not Ready 3/25/2022 3/25/2022 03/25/2022
Misc
Corrective Action Required
03/25/2022
Inspection denied -no address posted -erosion control not in compliance -backfill required to view plumbing
Underslab Plumbing Inspection - Residential Passed 4/19/2022 4/19/2022 04/19/2022
Misc
Corrective Action Required
03/25/2022
Inspection denied -no address posted -erosion control not in compliance -backfill required to view plumbing
Erosion Control Inspection Residential Failed 5/9/2022 05/09/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/25/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 05/09/2022 2:29 PM
Erosion Control Inspection Residential Failed 5/16/2022 05/16/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/09/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 05/09/2022 2:29 PM
Misc
Corrective Action Required
05/16/2022
Drive way and side walk just recently poured. erosion control to be in compliance within the next 2 days
Erosion Control Inspection Residential Partial 5/18/2022 05/18/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
05/18/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 05/09/2022 2:29 PM
Misc
Resolved
05/18/2022
Drive way and side walk just recently poured. erosion control to be in compliance within the next 2 days
Misc
Informational
05/18/2022
Erosion control back in compliance
All Rough Inspection - Residential Failed 8/4/2022 8/4/2022 08/04/2022
Misc
Corrective Action Required
08/04/2022
inspection denied, address footing poured without approval.
Electrical Service Inspection Passed 8/8/2022 08/08/2022
Footing Inspection - Residential Passed 8/8/2022 08/08/2022
Misc
Resolved
08/08/2022
cold weather protection need be in place to pour do not pour
All Rough Inspection - Residential Failed 8/8/2022 8/8/2022 08/08/2022
Misc
Resolved
08/08/2022
inspection denied, address footing poured without approval.
Misc
Corrective Action Required
08/08/2022
-protect NM with in 6’ of attic access -fireblock through out -solid block plate breaks in garage -provide truss plans for inspection -tie front entry wall to other exterior walls -support ridge beam at front stoop
All Rough Inspection - Residential Failed 8/11/2022 8/11/2022 08/11/2022
Misc
Corrective Action Required
08/08/2022
-fireblock furr downs in basement -okay to insulate do not cover items in need of inspection
Erosion Control Inspection Residential Failed 8/12/2022 08/12/2022
Misc
Informational
05/18/2022
Erosion control back in compliance
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/12/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/12/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter
All Rough Inspection - Residential Passed 8/22/2022 8/22/2022 08/22/2022
Misc
Resolved
08/22/2022
-fireblock furr downs in basement -okay to insulate do not cover items in need of inspection no further inspections until erosion control is in compliance
Gas Service Inspection - Residential Passed 8/22/2022 8/22/2022 08/22/2022
Driveway Inspection Partial 8/25/2022 8/25/2022 08/25/2022
Misc
Informational
08/25/2022
8-25-22 RH. Driveway was formed up and aggregate was placed and compacted.
Piers/Caissons Inspection - Residential Passed 11/29/2022 11/29/2022
Occupancy Inspection - Codes Residential Failed 11/29/2022 11/29/2022 11/29/2022
Misc
Corrective Action Required
11/29/2022
-pay all fees -address pending driveway inspection -spark rings at kitchen outlets to code -handrail at stairs to basement -water heater pressure relief valve pipe to code -sump pump and grinder pump outlets to be dedicated outlets if non GFCI -all hardwired appliances to have a lock out at breaker -seal all exterior penetrations
Plot Plan Inspection Passed 11/29/2022 11/29/2022
Driveway Inspection Passed 12/1/2022 12/1/2022 12/01/2022
Misc
Informational
08/25/2022
8-25-22 RH. Driveway was formed up and aggregate was placed and compacted.
Misc
Informational
12/01/2022
On Thursday, 12-01-2022 I performed a visual driveway inspection and passed the finish for this approach
Erosion Control Inspection Residential Passed 12/19/2022 12/19/2022
Misc
Resolved
12/19/2022
Erosion control back in compliance
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
12/19/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
12/19/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter
Occupancy Inspection - Codes Residential Full C of O 12/19/2022 12/19/2022 12/19/2022
Misc
Resolved
12/19/2022
-spark rings at kitchen outlets to code -handrail at stairs to basement -water heater pressure relief valve pipe to code -sump pump and grinder pump outlets to be dedicated outlets if non GFCI -all hardwired appliances to have a lock out at breaker -seal all exterior penetrations
Documents & Images
Date Uploaded File Type Document Name
02/09/2022 Approved Plans APPROVED TRUSS LAYOUT
02/09/2022 Approved Plans APPROVED TRUSS PACKAGE
02/09/2022 Permit Codes Residential Plan Review
02/10/2022 Application Form APPLICATION
02/10/2022 Approved Plans APPROVED PLANS
02/10/2022 Permit Codes Residential Plan Review
02/10/2022 Plot Plan APPROVED PLOT PLAN
02/10/2022 Permit Codes Residential Plan Review
02/15/2022 Permit DS Building Permit
02/15/2022 Receipt Receipt for transaction:2022-000815
03/09/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
05/09/2022 Letter INSPECTION SUMMARY
05/16/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/05/2022 Lot 114 Hawthorn Ridge footing
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
11/28/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
11/29/2022 Letter INSPECTION SUMMARY
11/29/2022 Letter INSPECTION SUMMARY
11/29/2022 Letter INSPECTION SUMMARY
12/01/2022 Letter INSPECTION SUMMARY
12/01/2022 Receipt Receipt for transaction:2022-009220
12/19/2022 Letter INSPECTION SUMMARY
12/19/2022 Letter Field Certificate of Occupancy
12/19/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: