Permit Application Status

PRRES20220353


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220353
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. ROOF TRUSSES. UNFINISHED BASEMENT. COVERED PATIO.
01/27/2022
02/01/2022
07/30/2022
12/15/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 02/01/2022
Water Tap Fee $3,655.00 $3,655.00 Paid 02/01/2022
Water Meter Fee $479.24 $479.24 Paid 02/01/2022
Right of Way Permit Fee $85.00 $85.00 Paid 02/01/2022
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 02/01/2022
Valuation Fee New Single Family $1,593.22 $1,593.22 Paid 02/01/2022
Not Ready Inspection Fee $75.00 $75.00 Paid 11/17/2022
Not Ready Inspection Fee $75.00 $75.00 Paid 11/17/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 3/7/2022 3/7/2022 03/07/2022
Misc
Corrective Action Required
03/07/2022
INSPECTION DENIED NO ADDRESS POSTED
Erosion Control Inspection Residential Failed 3/7/2022 03/07/2022
Misc
Corrective Action Required
03/07/2022
MAINTAIN GRAVEL FILTER AND SILT FENCE
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/07/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Passed 3/17/2022 (11:00) 3/17/2022 03/17/2022
Water Service Inspection - R Partial 3/21/2022 (11:00) 3/21/2022 03/21/2022
Water Service Inspection - R Passed 3/22/2022 (9:30) 3/22/2022 03/22/2022
Underslab Plumbing Inspection - Residential Passed 3/29/2022 3/29/2022 03/29/2022
Misc
Resolved
03/29/2022
Gas Service Inspection - Residential Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/12/2022
complete gas line install could not inspect water in basement
Electrical Service Inspection Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/12/2022
could not inspect ufer ground connection, basement full of water
Erosion Control Inspection Residential Failed 7/12/2022 07/12/2022
Misc
Resolved
07/12/2022
MAINTAIN GRAVEL FILTER AND SILT FENCE
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
07/12/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/12/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter maintain silt fence/straw wattles maintain vegetation
All Rough Inspection - Residential Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/12/2022
No further inspections until erosion control in compliance -fire block into garage furr down -support and secure NM in furrdowns and joist spaces to code -hanger above fridge installed incorrectly -framing above flex room not to plans details -fire block hvac chases into furr down and joist spaces -complete gas line install at fireplaces -cs-pf at dining room -address front entry 2nd level frame to detail -cs-pf bed 2 -gt bearing points bath 1 -address missing stud bed 1/sitting room -seal gap in fireblocking above 2nd floor fireplace -protect NM within 6’ of attic access 2nd floor -missing tjc37 above stairway -missing hold downs and hangers nailed at front stoop Install all windows and doors -vent roof to code -basement full of water will inspect at time of Reinspection complete all items before calling for re inspection. List subject to change
Electrical Service Inspection Passed 7/27/2022 7/27/2022 07/27/2022
Misc
Resolved
07/27/2022
could not inspect ufer ground connection, basement full of water
Gas Service Inspection - Residential Failed 7/27/2022 7/27/2022 07/27/2022
Misc
Resolved
07/27/2022
complete gas line install could not inspect water in basement
Misc
Corrective Action Required
07/27/2022
no pressure at gauge
All Rough Inspection - Residential Failed 7/27/2022 7/27/2022 07/27/2022
Misc
Corrective Action Required
07/12/2022
No further inspections until erosion control in compliance -fire block into garage furr down see furr outs -address front entry 2nd level frame to detail -seal gap in fireblocking above 2nd floor fireplace -protect NM within 6’ of attic access 2nd floor -provide minimum 10psi at gas pressure gauge for inspection
All Rough Inspection - Residential Failed 8/10/2022 8/10/2022 08/10/2022
Misc
Corrective Action Required
07/27/2022
No further inspections until erosion control in compliance -fire block into garage furr down see furr outs -address front entry 2nd level frame to detail -seal gap in fireblocking above 2nd floor fireplace -protect NM within 6’ of attic access 2nd floor -provide minimum 10psi at gas pressure gauge for inspection
Misc
Corrective Action Required
08/10/2022
inspection denied erosion control not in compliance Mitchell Schwarz 08/10/2022 8:40 AM
Erosion Control Inspection Residential Failed 8/10/2022 08/10/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/12/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. maintain gravel filter still not in compliance Mitchell Schwarz 08/10/2022 8:41 AM
Footing Inspection - Residential Passed 8/11/2022 08/11/2022
All Rough Inspection - Residential Not Ready 8/11/2022 8/11/2022 08/11/2022
Misc
Corrective Action Required
08/10/2022
No further inspections until erosion control in compliance -fire block into garage furr down see furr outs -address front entry 2nd level frame to detail -seal gap in fireblocking above 2nd floor fireplace -protect NM within 6’ of attic access 2nd floor -provide minimum 10psi at gas pressure gauge for inspection
Misc
Corrective Action Required
08/10/2022
inspection denied erosion control not in compliance Mitchell Schwarz 08/10/2022 8:40 AM still not in compliance. Mitchell Schwarz 08/11/2022 2:16 PM
Gas Service Inspection - Residential Failed 8/11/2022 8/11/2022 08/11/2022
Misc
Corrective Action Required
07/27/2022
no pressure at gauge
All Rough Inspection - Residential Not Ready 8/12/2022 8/12/2022 08/12/2022
Misc
Corrective Action Required
08/11/2022
No further inspections until erosion control in compliance -fire block into garage furr down see furr outs -address front entry 2nd level frame to detail -seal gap in fireblocking above 2nd floor fireplace -protect NM within 6’ of attic access 2nd floor -provide minimum 10psi at gas pressure gauge for inspection
Misc
Corrective Action Required
08/11/2022
inspection denied erosion control not in compliance Mitchell Schwarz 08/10/2022 8:40 AM still not in compliance. Mitchell Schwarz 08/11/2022 2:16 PM still not in compliance. Mitchell Schwarz 08/12/2022 10:13 AM
All Rough Inspection - Residential Failed 8/16/2022 8/16/2022 08/16/2022
Misc
Corrective Action Required
08/12/2022
-seal gap in fireblocking above 2nd floor fireplace -provide minimum 10psi at gas pressure gauge for inspection basement full of water could not inspect Okay to insulate do not cover any items still needing inspection
Misc
Resolved
08/16/2022
inspection denied erosion control not in compliance Mitchell Schwarz 08/10/2022 8:40 AM still not in compliance. Mitchell Schwarz 08/11/2022 2:16 PM still not in compliance. Mitchell Schwarz 08/12/2022 10:13 AM
Gas Service Inspection - Residential Failed 8/16/2022 8/16/2022 08/16/2022
Misc
Corrective Action Required
08/11/2022
no pressure at gauge Basement flooded could not inspect
Gas Service Inspection - Residential Passed 8/24/2022 8/24/2022 08/24/2022
Misc
Resolved
08/24/2022
no pressure at gauge Basement flooded could not inspect
All Rough Inspection - Residential Passed 8/24/2022 8/24/2022 08/24/2022
Misc
Resolved
08/24/2022
-seal gap in fireblocking above 2nd floor fireplace -provide minimum 10psi at gas pressure gauge for inspection basement full of water could not inspect Okay to insulate do not cover any items still needing inspection
Driveway Inspection Passed 8/30/2022 08/31/2022
Misc
Informational
08/31/2022
On yesterday 8-30-2022, I performed and passed a driveway for placement of concrete.
Erosion Control Inspection Residential Passed 12/8/2022 12/08/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
12/08/2022
Piers/Caissons Inspection - Residential Passed 12/8/2022 12/08/2022
Misc
Informational
12/08/2022
Third party inspection completed.
Occupancy Inspection - Codes Residential Failed 12/8/2022 12/8/2022 12/08/2022
Misc
Corrective Action Required
12/08/2022
- Address in contrasting colors - Sidewalk inspection pending - Lower water meter lid to grade - Label non gfci outlets garage, basement - Outlet in master bathroom vanity near toilet to be gfci protected - Electrical boxes in ceiling upstairs open - Switch plate missing stairs to basement - Provide anchor bolts steel columns basement
Sidewalk Inspection Passed 12/9/2022 12/9/2022 12/12/2022
Misc
Informational
12/12/2022
On Friday, 12-09-2022. I performed and passed a visual sidewalk inspection for sidewalk placed prior.
Plot Plan Inspection Failed 12/14/2022 12/14/2022
Misc
Corrective Action Required
12/14/2022
provide as graded plot plan
Occupancy Inspection - Codes Residential Failed 12/14/2022 12/14/2022 12/14/2022
Misc
Corrective Action Required
12/08/2022
Provide as graded plot plan
Plot Plan Inspection Passed 12/15/2022 12/15/2022
Misc
Resolved
12/15/2022
provide as graded plot plan
Occupancy Inspection - Codes Residential Full C of O 12/15/2022 12/15/2022 12/15/2022
Misc
Resolved
12/15/2022
Provide as graded plot plan
Documents & Images
Date Uploaded File Type Document Name
01/27/2022 HT #139 - PERMIT APP
01/31/2022 Approved Plans APPROVED DRAWINGS
01/31/2022 Approved Plans APPROVED TRUSS PACKAGE
01/31/2022 Approved Plans APPROVED TRUSS LAYOUT
01/31/2022 Permit Codes Residential Plan Review
02/01/2022 Plot Plan APPROVED PLOT PLAN
02/01/2022 Permit Codes Residential Plan Review
02/01/2022 Permit DS Building Permit
02/01/2022 Receipt Receipt for transaction:2022-000559
02/23/2022 139 Hawthorne Ridge-FTNG
03/07/2022 Letter INSPECTION SUMMARY
03/07/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/16/2022 Letter INSPECTION SUMMARY
08/16/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
11/17/2022 Receipt Receipt for transaction:2022-009011
12/08/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/12/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Plot Plan APPROVED AS BUILT PLOT PLAN
12/15/2022 Letter Codes Final Certificate of Occupancy
12/15/2022 Letter Field Certificate of Occupancy
12/15/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home