Summary
PRRES20216155
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - ROOF TRUSSES - COVERED DECK
11/30/2021
12/01/2021
09/26/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $390.00 $390.00 Paid 12/01/2021
Right of Way Permit Fee $85.00 $85.00 Paid 12/01/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 12/01/2021
Valuation Fee New Single Family $981.78 $981.78 Paid 12/01/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 12/01/2021
Water Meter Fee $479.24 $479.24 Paid 12/01/2021
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/22/2021 12/22/2021
Misc
Informational
12/22/2021
3rd party inspection ufer ground rod located as indicated in 3rd party inspection report.
Underslab Plumbing Inspection - Residential Passed 1/19/2022 1/19/2022 01/19/2022
Sewer Service Inspection - R Passed 1/24/2022 (9:30) 1/24/2022 01/24/2022
Water Service Inspection - R Passed 1/25/2022 (1:00) 1/25/2022 01/25/2022
Electrical Service Inspection Passed 6/22/2022 6/22/2022 06/22/2022
Corrective Action Required
06/22/2022
Gas Service Inspection - Residential Passed 6/22/2022 6/22/2022 06/22/2022
All Rough Inspection - Residential Failed 6/22/2022 6/22/2022 06/22/2022
Misc
Corrective Action Required
06/22/2022
inspection denied provide complete city stamped plans on site (missing pages) provide truss plans on site
All Rough Inspection - Residential Failed 6/23/2022 6/23/2022 06/23/2022
Misc
Resolved
06/23/2022
inspection denied provide complete city stamped plans on site (missing pages) provide truss plans on site
Misc
Corrective Action Required
06/23/2022
-solid block sheathing breaks in garage -nail top plate to header at garage portal frame -strap top plates to code where lapped less than 24” garage W wall -anchor bolts to be within 12” of plate breaks not closer than 7x the diameter of the bolt -complete hvac chase in laundry -seal bottom plate penetration master closet -provide clearance for electrical from fireplace -fireblock fire place wall to ceiling space -tie fireplace to to other exterior walls -missing nails in hold downs above deck -cspf at rear slider and dining -complete all fireblocking in basement vertical to horizontal every 10’ , furr down ends, furr out walls to ceiling space -seal to plate penetrations in bed 4 -seal penetrations in RA joist space above bed 4 and bath -
All Rough Inspection - Residential Passed 6/28/2022 6/28/2022 06/28/2022
Misc
Resolved
06/28/2022
-solid block sheathing breaks in garage -nail top plate to header at garage portal frame -strap top plates to code where lapped less than 24” garage W wall -anchor bolts to be within 12” of plate breaks not closer than 7x the diameter of the bolt -complete hvac chase in laundry -seal bottom plate penetration master closet -provide clearance for electrical from fireplace -fireblock fire place wall to ceiling space -tie fireplace to to other exterior walls -missing nails in hold downs above deck -cspf at rear slider and dining -complete all fireblocking in basement vertical to horizontal every 10’ , furr down ends, furr out walls to ceiling space -seal to plate penetrations in bed 4 -seal penetrations in RA joist space above bed 4 and bath -
Driveway Inspection Partial 7/12/2022 7/12/2022 07/12/2022
Misc
Informational
07/12/2022
Driveway was framed up with aggregate in and compacted. Curbing was also framed up with aggregate in and compacted and 3 tie in dowels on each end of driveway. 7/12/22 ES
Sidewalk Inspection Partial 7/12/2022 7/12/2022 07/12/2022
Misc
Informational
07/12/2022
Sidewalk was framed up with aggregate in and compacted. 7/12/22 ES
Driveway Inspection Partial 7/18/2022 7/18/2022 07/20/2022
Misc
Informational
07/12/2022
Driveway was framed up with aggregate in and compacted. Curbing was also framed up with aggregate in and compacted and 3 tie in dowels on each end of driveway. 7/12/22 ES Driveway meets LS and ADA spec. Curbing has been poured and looks ok also. 7/20/22 ES
Sidewalk Inspection Partial 7/18/2022 7/18/2022 07/20/2022
Misc
Informational
07/12/2022
Sidewalk was framed up with aggregate in and compacted. 7/12/22 ES Most parts of sidewalk meet LS and ADA spec; however, the southern portion of sidewalk is covered with dirt from grading. Will reinspect once sidewalk is all cleared. 7/20/22 ES
Driveway Inspection Passed 7/20/2022 07/20/2022
Misc
Informational
07/20/2022
Driveway was framed up with aggregate in and compacted. Curbing was also framed up with aggregate in and compacted and 3 tie in dowels on each end of driveway. 7/12/22 ES Driveway meets LS and ADA spec. Curbing has been poured and looks ok also. 7/20/22 ES
Sidewalk Inspection Partial 7/29/2022 7/29/2022 08/02/2022
Misc
Informational
07/20/2022
Sidewalk was framed up with aggregate in and compacted. 7/12/22 ES Most parts of sidewalk meet LS and ADA spec; however, the southern portion of sidewalk is covered with dirt from grading. Will reinspect once sidewalk is all cleared. 7/20/22 ES Sidewalk still has dirt over it. 8/2/22 ES
Sidewalk Inspection Partial 8/8/2022 8/8/2022 08/10/2022
Misc
Informational
08/02/2022
Sidewalk was framed up with aggregate in and compacted. 7/12/22 ES Most parts of sidewalk meet LS and ADA spec; however, the southern portion of sidewalk is covered with dirt from grading. Will reinspect once sidewalk is all cleared. 7/20/22 ES Sidewalk still has dirt over it. 8/2/22 ES Sidewalk still covered with dirt. 8/10/22 ES
Sidewalk Inspection Partial 8/15/2022 8/15/2022 09/08/2022
Misc
Informational
08/10/2022
Sidewalk was framed up with aggregate in and compacted. 7/12/22 ES Most parts of sidewalk meet LS and ADA spec; however, the southern portion of sidewalk is covered with dirt from grading. Will reinspect once sidewalk is all cleared. 7/20/22 ES Sidewalk still has dirt over it. 8/2/22 ES Sidewalk still covered with dirt. 8/10/22 ES. Sidewalk still covered with dirt. 9/8/22 ES
Occupancy Inspection - Codes Residential Failed 9/12/2022 9/12/2022 09/12/2022
Misc
Corrective Action Required
09/12/2022
-address piers poured without inspection -properly illuminate address -guard rail at front stoop where required -hardware at rear slider -label all non GFCI protected outlets in unfinished spaces -install hardware, ensure latching, provide security screws at basement patio door
Piers/Caissons Inspection - Residential Passed 9/19/2022 09/19/2022
Corrective Action Required
09/19/2022
Erosion Control Inspection Residential Passed 9/19/2022 09/19/2022
Plot Plan Inspection Passed 9/19/2022 09/19/2022
Occupancy Inspection - Codes Residential Failed 9/19/2022 9/19/2022 09/19/2022
Misc
Corrective Action Required
09/12/2022
-properly illuminate address -install hardware, ensure latching, provide security screws at basement patio door
Sidewalk Inspection Passed 9/15/2022 9/26/2022 09/26/2022
Misc
Informational
09/08/2022
Sidewalk was framed up with aggregate in and compacted. 7/12/22 ES Most parts of sidewalk meet LS and ADA spec; however, the southern portion of sidewalk is covered with dirt from grading. Will reinspect once sidewalk is all cleared. 7/20/22 ES Sidewalk still has dirt over it. 8/2/22 ES Sidewalk still covered with dirt. 8/10/22 ES. Sidewalk still covered with dirt. 9/8/22 ES Sidewalk meets LS and ADA spec. 9/26/22 ES
Occupancy Inspection - Codes Residential Full C of O 9/26/2022 9/26/2022 09/26/2022
Misc
Resolved
09/26/2022
Documents & Images
Date Uploaded File Type Document Name
11/30/2021 H3 #14 - PERMIT APP
11/30/2021 Approved Plans APPROVED PLANS
11/30/2021 Approved Plans APPROVED TRUSS LAYOUT
11/30/2021 Approved Plans APPROVED TRUSS PACKAGE
11/30/2021 Plot Plan APPROVED PLOT PLAN
12/01/2021 Permit Codes Residential Plan Review
12/01/2021 Permit DS Building Permit
12/01/2021 Receipt Receipt for transaction:2021-009028
12/17/2021 14 Hawthorne Ridge Subgrade
12/21/2021 14 Hawthorne Ridge FTNG
12/22/2021 Letter INSPECTION SUMMARY
01/19/2022 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
01/25/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter Codes 140 Day Letter
06/22/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter Codes Residential Plan Review
06/23/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
09/16/2022 H3-14 Piers poured
09/16/2022 8024-6 (002)
09/19/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter Codes Final Certificate of Occupancy
09/26/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home