Permit Application Status

PRRES20210753


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20210753
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ENGINEERED FLOOR - FINISHED AND UNFINISHED BASEMENT - COVERED DECK - suspended slab for garage
02/24/2021
02/25/2021
08/23/2021
04/15/2022
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
GINA@JFECONSTRUCTION.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/01/2021 02/25/2021
Brandon Kalwei
Residential Plan Review Approved 03/01/2021 02/25/2021
Brandon Kalwei
07 Identify emergency escape openings from bedrooms
Corrective Action Required
02/25/2021

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance) top floor bedrooms need egress labeled
10 Combustion air
Corrective Action Required
02/25/2021

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
Plot Plan Review Approved 02/26/2021 02/24/2021
Brandon Kalwei
Residential Plan Review Rejected 02/26/2021 02/24/2021
Brandon Kalwei
07 Identify emergency escape openings from bedrooms
Corrective Action Required
02/24/2021

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance) top floor bedrooms need egress labeled
10 Combustion air
Corrective Action Required
02/24/2021

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,064.84 $1,064.84 Paid 02/25/2021
8331507-Sewer Connection Fee $420.00 $420.00 Paid 02/25/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 02/25/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 02/25/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 02/25/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 02/25/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/5/2021 05/05/2021
Misc
Informational
05/05/2021
UFER LOCATED SOUTH FOUNDATION WALL BASEMENT BEHIND GARAGE
Underslab Plumbing Inspection - Residential Passed 5/14/2021 5/14/2021 05/14/2021
Underslab Electrical Inspection - Residential Passed 5/20/2021 05/20/2021
Misc
Informational
05/20/2021
UNDERSLAB CONDUIT BETWEEN BEAM POCKETS REAR GARAGE FOUNDATION WALL
Sewer Service Inspection - R Passed 5/25/2021 (8:15) 5/25/2021 05/25/2021
Water Service Inspection - R Passed 5/26/2021 (9:00) 5/26/2021 05/26/2021
Piers/Caissons Inspection - Residential Passed 6/7/2021 06/07/2021
Misc
Informational
06/07/2021
(3) DECK PIERS & BASEMENT SLAB 3RD PARTY BY BOB ROWE AT VAN DEURZEN & ASSOCIATES SIGNED & SEALED BY CHAD STREETER
All Rough Inspection - Residential Failed 7/12/2021 7/12/2021 07/12/2021
Misc
Corrective Action Required
07/12/2021
GARAGE PORTAL FRAME-exterior only ok
Electrical Service Inspection Passed 9/15/2021 9/15/2021 09/15/2021
Gas Service Inspection - Residential Passed 9/15/2021 9/15/2021 09/15/2021
All Rough Inspection - Residential Failed 9/15/2021 9/15/2021 09/15/2021
Misc
Corrective Action Required
07/12/2021
GARAGE PORTAL FRAME-exterior only ok
Misc
Corrective Action Required
09/15/2021
- ADDRESS COVERED DECK NOT PER PLAN OR PLOT PLAN - GAS & ELECTRIC SERVICE ONLY NO ROUGH INSPECTION
All Rough Inspection - Residential Failed 9/17/2021 9/17/2021 09/17/2021
Misc
Informational
09/17/2021
GARAGE PORTAL FRAME-exterior only ok
Misc
Resolved
09/17/2021
- ADDRESS COVERED DECK NOT PER PLAN OR PLOT PLAN - GAS & ELECTRIC SERVICE ONLY NO ROUGH INSPECTION
Miscellaneous Correction
Corrective Action Required
09/17/2021
3rd party inspection suspended slab ? Secure fireplace Nail joist hanger dining area Seal pan off at dead space master closet Provide BP 1 blocking per joist layout Fire Block dead spaces family room basement Anchor bolts middle 1/3 the width of plate basement Seal gas line above window bed # 4 Fire block ( insulate) DWV in dead space bed #4 near furnace Seal fire block dead space at shower basement
Suspended Slab Inspection Passed 9/22/2021 09/22/2021
Misc
Informational
09/22/2021
SUSPENDED GARAGE SLAB 3RD PARTY BY BOB ROWE @ VAN DEURZEN
All Rough Inspection - Residential Not Ready 9/22/2021 9/22/2021 09/22/2021
Misc
Informational
09/17/2021
GARAGE PORTAL FRAME-exterior only ok
Miscellaneous Correction
Corrective Action Required
09/17/2021
Secure fireplace Nail joist hanger dining area Fire Block dead spaces family room basement Seal gas line above window bed # 4 Seal fire block dead space at shower basement
All Rough Inspection - Residential Passed 9/24/2021 9/24/2021 09/24/2021
Misc
Informational
09/22/2021
GARAGE PORTAL FRAME-exterior only ok
Miscellaneous Correction
Resolved
09/24/2021
Driveway Inspection Partial 11/15/2021 11/15/2021 11/15/2021
Misc
Informational
11/15/2021
Driveway is framed up and has aggregate in place and compacted. 11/15 ES
Driveway Inspection Passed 11/19/2021 11/19/2021 11/19/2021
Misc
Informational
11/15/2021
Driveway is framed up and has aggregate in place and compacted. 11/15 ES
Misc
Informational
11/19/2021
Driveway meets LS specs. 11/19 ES
Erosion Control Inspection Residential Failed 2/23/2022 02/23/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/23/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE UNTIL SOD COMPLETE CLEAN STREET & GUTTERS OF MUD & GRAVEL
Plot Plan Inspection Passed 2/23/2022 02/23/2022
Occupancy Inspection - Codes Residential Temporary C of O 2/23/2022 2/23/2022 02/23/2022
Miscellaneous Correction
Corrective Action Required
02/23/2022
PAY NOT READY FEE OBTAIN LAWN IRRIGATION PERMIT & SUBMIT BACKFLOW CERTIFICATION PROVIDE SOD PROVIDE SPLASH BLOCKS SUMP SHALL DISCHARGE 36" FROM FOUNDATION
Occupancy Inspection - Codes Residential Temporary C of O 3/18/2022 03/18/2022
Miscellaneous Correction
Corrective Action Required
02/23/2022
PAY NOT READY FEE OBTAIN LAWN IRRIGATION PERMIT & SUBMIT BACKFLOW CERTIFICATION PROVIDE SOD PROVIDE SPLASH BLOCKS SUMP SHALL DISCHARGE 36" FROM FOUNDATION : SOD NOT DONE EXTEND TCO TO 4/15/22 : Michael Harkins 03/18/2022 10:35 AM
Occupancy Inspection - Codes Residential Full C of O 4/15/2022 4/15/2022 04/15/2022
Miscellaneous Correction
Resolved
04/15/2022
Documents & Images
Date Uploaded File Type Document Name
02/24/2021 Application Form APPLICATION
02/24/2021 Application Form excise tax
02/24/2021 Letter Codes Residential Plan Review
02/25/2021 Receipt Receipt for transaction:2021-000922
02/25/2021 Letter DS Building Permit
04/08/2021 WR-119
04/08/2021 WR 119 - 213 NW AMBERSHAM_PERMIT_4-2-21
04/20/2021 WR 119 - 213 NW AMBERSHAM_PERMIT_4-16-21
05/05/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/26/2021 Letter INSPECTION SUMMARY
06/07/2021 213 NW Ambersham Dr_BAS SLAB & DECK PIER INSP_2021-06-04
06/07/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Approved Plans approved plans
09/17/2021 Letter INSPECTION SUMMARY
09/17/2021 213 NW Ambersham Dr_BAS SLAB & DECK PIER INSP_2021-06-04
09/17/2021 213 NW Ambersham Dr_SUS GAR SLAB INSP_2021-06-16
09/22/2021 Letter INSPECTION SUMMARY
09/22/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
01/11/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter Codes Temporary Certificate of Occupancy
03/18/2022 Letter Codes Temporary Certificate of Occupancy
04/12/2022 Receipt Receipt for transaction:2022-002029
04/15/2022 Letter Codes Final Certificate of Occupancy
04/15/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home