Summary
PRRES20210293
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT 0 COVERED DECK DEFERRED ROOF TRUSSES
01/21/2021
02/05/2021
07/21/2022
08/16/2022
Locations
Contacts
ROESER HOMES LLC, Address:11415 STRANG LINE RD, Phone:(913) 220-7477  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
ELECTRICAL INVESTMENTS, Address:8014 REEDER ST, Phone:(816) 210-1597  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
MATT@ROESERHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/09/2021 02/05/2021
Kim Brennan
Lot elevations
Corrective Action Required
02/05/2021

Existing and finish elevations at all property corners must be provided on the plot plan. Not shown for the front/west side
Basement opening elevations
Corrective Action Required
02/05/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan.
Drainage swales/berms
Corrective Action Required
02/05/2021

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP. There appears to be a swale in the NW rear of this lot that is not shown on the plot plan.
Residential Plan Review Approved 02/09/2021 02/05/2021
Kim Brennan
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
02/05/2021

Identify roof covering material (IRC Section R905)
33 Identify braced wall locations and length of braced wall panel(s).
Corrective Action Required
02/05/2021

Identify braced wall locations and length of braced wall panel(s). (IRC Section R602.10)
Plot Plan Review Rejected 01/25/2021 01/22/2021
Kim Brennan
Lot elevations
Corrective Action Required
01/22/2021

Existing and finish elevations at all property corners must be provided on the plot plan. Not shown for the front/west side
Basement opening elevations
Corrective Action Required
01/22/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan.
Drainage swales/berms
Corrective Action Required
01/22/2021

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP. There appears to be a swale in the NW rear of this lot that is not shown on the plot plan.
Residential Plan Review Rejected 01/25/2021 01/21/2021
Kim Brennan
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
01/21/2021

Identify roof covering material (IRC Section R905)
33 Identify braced wall locations and length of braced wall panel(s).
Corrective Action Required
01/21/2021

Identify braced wall locations and length of braced wall panel(s). (IRC Section R602.10)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,725.72 $1,725.72 Paid 02/05/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 02/05/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 02/05/2021
8331507-Sewer Connection Fee $660.00 $660.00 Paid 02/05/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 02/05/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 02/05/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/23/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 05/23/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/23/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 07/21/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/18/2021 (3:00) 3/18/2021 03/18/2021
Underslab Plumbing Inspection - Residential Passed 4/14/2021 4/14/2021 04/14/2021
Water Service Inspection - R Passed 4/23/2021 (1:45) 4/23/2021 04/23/2021
Sewer Service Inspection - R Partial 4/23/2021 (1:45) 4/23/2021 04/23/2021
Misc
Informational
04/23/2021
Partial approval from connection at sanitary to riser at structure approved -Info- grinder pump installation
Sewer Service Inspection - R Passed 4/26/2021 (10:00) 4/26/2021 04/26/2021
Misc
Resolved
04/26/2021
Partial approval from connection at sanitary to riser at structure approved -Info- grinder pump installation
Erosion Control Inspection Residential Failed 5/18/2021 05/18/2021
Misc
Corrective Action Required
05/18/2021
-Erosion control methods require continuous maintenance. Repair damaged sections within 48 hours -Immediate street cleanup required -remove debris from stormwater inlet no further inspections until issues are resolved
All Rough Inspection - Residential Failed 7/2/2021 7/2/2021 07/02/2021
Misc
Corrective Action Required
07/02/2021
garage Portal ok- covered deck rafters and post framing covered , no inspection.
All Rough Inspection - Residential Failed 7/27/2021 07/27/2021
Misc
Corrective Action Required
07/02/2021
garage Portal ok- covered deck rafters and post framing covered , no inspection. Post visible address, address erosion control. cut over grown vegetation to max 10" in height , contain all trash and debris. Provide report from truss manufacture on screws holding down truss on covered deck. Screws are through the siding and not at the correct height and location through both tope plates.
All Rough Inspection - Residential Not Ready 8/6/2021 8/6/2021 08/06/2021
Misc
Corrective Action Required
07/27/2021
garage Portal ok- covered deck rafters and post framing covered , no inspection. Post visible address, address erosion control. cut over grown vegetation to max 10" in height , contain all trash and debris. Provide report from truss manufacture on screws holding down truss on covered deck. Screws are through the siding and not at the correct height and location through both tope plates.
Misc
Corrective Action Required
08/06/2021
denied - erosion control trash and debris was not addressed. storm sewer in the front not protected. comply within 2 business days.
Erosion Control Inspection Residential Failed 8/6/2021 08/06/2021
Misc
Corrective Action Required
05/18/2021
-Erosion control methods require continuous maintenance. Repair damaged sections within 48 hours -Immediate street cleanup required -remove debris from stormwater inlet no further inspections until issues are resolved
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Partial 8/25/2021 8/25/2021 08/25/2021
Misc
Corrective Action Required
08/06/2021
garage Portal ok- - TRUSS LOCK SCREWS RAN THROUGH DOUBLE TOP PLATE, TRUSSES ABOVE FIREPLACE HAVE H2.5s IN PLACE OK TO COVER DECK - : ONLY THE ABOVE HAVE BEEN INSPECTED :
Misc
Resolved
08/25/2021
All Rough Inspection - Residential Failed 10/1/2021 10/1/2021 10/01/2021
Misc
Corrective Action Required
08/25/2021
**PROVIDE PLAN AND TRUSS PACKAGE AND TRUSS LAYOUT ON SITE. TRUSS LAYOUT MUST SHOW TWO FLOORS -Provide 2 lag screws or bolts at each deck beam-post connection -Expose covered deck framing -Provide flashings at all horizontal trims or wall extrusion -Staple exterior sheathing 4” oc along edge and 8” oc in field -Support with hangers M3-M8 trusses above garage -Sister a new stud next to the bottom-cut stud near 3rd car garage door -Fb garage duct chase from soffit -Nail hangers at connections to header joist above garage, near bathroom -Toe nail all joists to wall top plates per code -Strap exterior and interior bearing wall top plates where bored more than 50% throughout house -Provide full bearing under rear dining window jack studs -Support lvl beam at dining cabinet. Lvl beam below not aligned with this wall -Have engineer address 2x6 studs at great room exterior wall not continuous full height; engineer to address longer span than shown on the plan for the 14” lvl beam -Support GR1&2 girder trusses with 3(2x6) at bearing points shown on truss layout -Security blocking for master bedroom exterior door -Protect wiring within 6 ft of attic access above laundry -Fb b-vent/duct chase from joist space ; fb stair stringer space from ceiling space/soffit -Nail truss hangers above guest bedroom -Tie down all trusses to interior bearing wall as well; for girder trusses, install straps that can handle the uplift force at each end of girder truss. See girder page for detail. Example, C8 GT has over 1000 lbs of uplift at both ends, use proper device to tie it down and not screws -Provide combustion air openings per code -Toe nail all joists to basement foundation wall sill plates -Header off cut joist below half bathroom -Install double wall interconnecting fitting at common vent -Fb stair wall from soffit; fb all basement wall space from soffit/ceiling space; -Provide full support for lvl beam at entertainment room exterior wall; install double lvl beam per plan to the I beam above storage. Have engineer address this lvl beam that is misplaced. It should be underneath the bearing dining cabinet wall above -Have engineer address I beam above basement slide door not shown on plan -Have engineer address support of GR1 girder truss bearing point (as shown on the truss page, the bear point is right next to the washer stand pipe). There’s nothing below to carry this load -Anchor basement sill plates no more than six ft apart **DO NOT INSULATE
Electrical Service Inspection Failed 10/1/2021 10/1/2021 10/01/2021
Misc
Corrective Action Required
10/01/2021
-Provide listed grounding clamp for connection to rebar. Acorn clamp listed only for connection to ground rod -Ground the service to copper water -Connect the grounding electrode conductor to one of the middle grounded bus bar or install #4 cu jumper from the left equipment grounding bus bar where the GEC is connected to to the middle grounded bus bar -Install covers at service entrance conductor connections to power bus bar
Gas Service Inspection - Residential Failed 10/1/2021 10/1/2021 10/01/2021
Misc
Corrective Action Required
10/01/2021
-No pressure
All Rough Inspection - Residential Failed 10/18/2021 10/18/2021 10/18/2021
Misc
Corrective Action Required
10/01/2021
**PROVIDE PLAN AND TRUSS PACKAGE AND TRUSS LAYOUT ON SITE. TRUSS LAYOUT MUST SHOW TWO FLOORS -Provide 2 lag screws or bolts at each deck beam-post connection -Expose covered deck framing -Provide flashings at all horizontal trims or wall extrusion -Staple exterior sheathing 4” oc along edge and 8” oc in field -Support with hangers M3-M8 trusses above garage **blockings must be properly attached to the joists. There should be no excessive gaps between blockings and joists -Fb garage duct chase from soffit **Fb gap -Strap exterior and interior bearing wall top plates where bored more than 50% throughout house **above kitchen range and at 2nd fl bathroom -Support lvl beam at dining cabinet. Lvl beam below not aligned with this wall **The lvl beam below is misplaced by about 2.5 ft. You must have a proper size beam below to carry both the 2nd fl bedroom floor and roof load -Have engineer address 2x6 studs at great room exterior wall not continuous full height; engineer to address longer span than shown on the plan for the 14” lvl beam -Support GR1&2 girder trusses with 4(2x6) at bearing points shown on truss layout **Install (4)2x6 support at GR2 bearing point adjacent to dryer duct and at GR1 bearing point at angled linen closet wall. Engineer also must address support underneath the GR2 bearing point -Security blocking for master bedroom exterior door **Blocking at strike plate height 3 stud space out -Fb b-vent/duct chase from joist space **Fb hole -Provide combustion air openings per code -Install double wall interconnecting fitting at common vent -Fb stair wall from soffit; fb all basement wall space from soffit/ceiling space -Provide full support for lvl beam at entertainment room exterior wall; install double lvl beam per plan to the I beam above storage. Have engineer address this lvl beam that is misplaced. It should be underneath the bearing dining cabinet wall above **submit correction to plan -Have engineer address I beam above basement slide door not shown on plan **submit correction to plan -Have engineer address support of GR1 girder truss bearing point (as shown on the truss page, the bear point is right next to the washer stand pipe). There’s nothing below to carry this 13K concentrated load **submit correction to plan -Your truss layout does not show all the trusses above 2nd floor. You have roof structural issue here that needs to be addressed. Look at the girder truss support at 2nd fl bathroom wall (above half bathroom). The wall is not intended-or constructed-to carry roof load. Your plan is inadequately designed. Get back to your engineer and submit corrections to the plan -The revised plan calls for a W8x15 I beam underneath the GR1 girder truss point load. Lvl beam is installed instead. Have the engineer address this **OK TO INSULATE
Gas Service Inspection - Residential Failed 10/18/2021 10/18/2021 10/18/2021
Misc
Corrective Action Required
10/01/2021
-Still no pressure
Electrical Service Inspection Failed 10/18/2021 10/18/2021 10/18/2021
Misc
Corrective Action Required
10/01/2021
-Provide listed grounding clamp for connection to rebar. **There are many type of grounding/bonding clamps you can use to ground to rebar, for example Jones Bond clamp or any others designed for rebar grounding/bonding connection. See Greaves or other product catalog. -Connect the grounding electrode conductor to one of the middle grounded bus bar or install #4 cu jumper from the left equipment grounding bus bar where the GEC is connected to to the middle grounded bus bar **Install #4 cu jumper from the left grounding bus bar to the middle grounded bus bar. Read NEC 250.24(B)
All Rough Inspection - Residential Failed 11/2/2021 11/02/2021
Misc
Corrective Action Required
10/18/2021
**PROVIDE PLAN AND TRUSS PACKAGE AND TRUSS LAYOUT ON SITE. TRUSS LAYOUT MUST SHOW TWO FLOORS -Provide 2 lag screws or bolts at each deck beam-post connection -Expose covered deck framing -Provide flashings at all horizontal trims or wall extrusion -Staple exterior sheathing 4” oc along edge and 8” oc in field -Support with hangers M3-M8 trusses above garage **blockings must be properly attached to the joists. There should be no excessive gaps between blockings and joists -Fb garage duct chase from soffit **Fb gap -Strap exterior and interior bearing wall top plates where bored more than 50% throughout house **above kitchen range and at 2nd fl bathroom -Support lvl beam at dining cabinet. Lvl beam below not aligned with this wall **solid block underneath the double 2x4 studs at exterior wall -Have engineer address 2x6 studs at great room exterior wall not continuous full height; engineer to address longer span than shown on the plan for the 14” lvl beam -Support GR1&2 girder trusses with 4(2x6) at bearing points shown on truss layout **Install (4)2x6 support at GR1 bearing point adjacent to dryer duct and at GR2 bearing point at angled linen closet wall. Engineer also must address support underneath the GR2 bearing point **revised plan calls for W8x15 I beams underneath the GR2 and GR1 bearing points -Security blocking for master bedroom exterior door **Blocking at strike plate height 3 stud space out -Fb b-vent/duct chase from joist space **Fb hole -Provide combustion air openings per code -Install double wall interconnecting fitting at common vent -Fb stair wall from soffit; fb all basement wall space from soffit/ceiling space -Have engineer address support of GR1 girder truss bearing point (as shown on the truss page, the bear point is right next to the washer stand pipe). There’s nothing below to carry this 13K concentrated load **submit correction to plan -Your truss layout does not show all the trusses above 2nd floor. **provide truss layout for 2nd fl. Check if the layout show cantilevered trusses -Addenum: Have the truss engineer address repair for broken truss near the b-vent -The revised plan calls for a W8x15 I beam underneath the GR1 girder truss point load. Lvl beam is installed instead. Have the engineer address this **OK TO INSULATE
All Rough Inspection - Residential Failed 11/19/2021 11/19/2021
Misc
Corrective Action Required
11/02/2021
**PROVIDE PLAN AND TRUSS PACKAGE AND TRUSS LAYOUT ON SITE. TRUSS LAYOUT MUST SHOW TWO FLOORS -Provide 2 lag screws or bolts at each deck beam-post connection -Expose covered deck framing -Have engineer address 2x6 studs at great room exterior wall not continuous full height; engineer to address longer span than shown on the plan for the 14” lvl beam -. Engineer also must address support underneath the GR2 bearing point **revised plan calls for W8x15 I beams underneath the GR2 and GR1 bearing points -Provide combustion air openings per code[placement] -Have engineer address support of GR1 girder truss bearing point (as shown on the truss page, the bear point is right next to the washer stand pipe). There’s nothing below to carry this 13K concentrated load **submit correction to plan -Your truss layout does not show all the trusses above 2nd floor. **provide truss layout for 2nd fl. Check if the layout show cantilevered trusses -Addenum: Have the truss engineer address repair for broken truss near the b-vent -The revised plan calls for a W8x15 I beam underneath the GR1 girder truss point load. Lvl beam is installed instead. Have the engineer address this **OK TO INSULATE
Gas Service Inspection - Residential Failed 11/23/2021 11/23/2021 11/23/2021
Misc
Corrective Action Required
10/18/2021
no pressure on gauge
Electrical Service Inspection Passed 11/23/2021 11/23/2021 11/23/2021
Misc
Resolved
11/23/2021
All Rough Inspection - Residential Failed 11/23/2021 11/23/2021 11/23/2021
Misc
Corrective Action Required
11/19/2021
-Provide 2 lag screws or bolts at each deck beam-post connection -Expose covered deck framing -Provide combustion air openings per code[placement]
Gas Service Inspection - Residential Failed 12/2/2021 12/2/2021 12/02/2021
Misc
Corrective Action Required
11/23/2021
no pressure on gauge
All Rough Inspection - Residential Failed 12/2/2021 12/2/2021 12/02/2021
Misc
Corrective Action Required
11/23/2021
-Provide 2 lag screws or bolts at each deck beam-post connection -Provide combustion air openings per code[placement]
All Rough Inspection - Residential Passed 12/6/2021 12/6/2021 12/06/2021
Misc
Resolved
12/06/2021
Gas Service Inspection - Residential Passed 12/6/2021 12/6/2021 12/06/2021
Misc
Resolved
12/06/2021
Driveway Inspection Partial 12/14/2021 12/14/2021 12/14/2021
Misc
Informational
12/14/2021
Driveway was framed up with aggregate in and compacted. 12/14 ES
Driveway Inspection Passed 12/17/2021 12/17/2021 12/17/2021
Misc
Informational
12/14/2021
Driveway was framed up with aggregate in and compacted. 12/14 ES
Misc
Informational
12/17/2021
Driveway meets LS specs. 12/17/21 ES
Occupancy Inspection - Codes Residential Not Ready 5/10/2022 5/10/2022 05/10/2022
Misc
Corrective Action Required
05/10/2022
Inspection denied no address posted
Occupancy Inspection - Codes Residential Failed 5/19/2022 5/19/2022 05/19/2022
Misc
Resolved
05/19/2022
Inspection denied no address posted
Miscellaneous Correction
Corrective Action Required
05/19/2022
- pay all fees - Final grading and sod - irrigation permit and back flow certification if irrigation is installed - Splash blocks - Label all non GFCI outlets - Spindles missing - Nail hangers on deck - Piers and post on deck stairs - Address down spout by deck stairs - security lights - Security screws in front door
Occupancy Inspection - Codes Residential Temporary C of O 5/24/2022 5/24/2022 05/24/2022
Miscellaneous Correction
Corrective Action Required
05/19/2022
- Final grading and sod - irrigation permit and back flow certification if irrigation is installed - Address down spout by deck stairs
Occupancy Inspection - Codes Residential Ready for Temp CO 7/21/2022 07/21/2022
Miscellaneous Correction
Corrective Action Required
05/24/2022
- Final grading and sod - irrigation permit and back flow certification if irrigation is installed - Address down spout by deck stairs TCO extended to 8/20/22
Occupancy Inspection - Codes Residential Temporary C of O 07/22/2022
Miscellaneous Correction
Corrective Action Required
07/21/2022
- Final grading and sod - irrigation permit and back flow certification if irrigation is installed - Address down spout by deck stairs
Erosion Control Inspection Residential Passed 08/16/2022
Misc
Resolved
08/16/2022
-Erosion control methods require continuous maintenance. Repair damaged sections within 48 hours -Immediate street cleanup required -remove debris from stormwater inlet no further inspections until issues are resolved
DCM3 ESC REQUIRED 2 DAY
Resolved
08/16/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Plot Plan Inspection Passed 6/10/2022 08/16/2022
Occupancy Inspection - Codes Residential Full C of O 8/16/2022 8/16/2022 08/16/2022
Miscellaneous Correction
Resolved
08/16/2022
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home