PRRES20201235
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
05/15/2020
05/18/2020
11/06/2020
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
RYAN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 05/19/2020 05/18/2020
Kim Brennan
Residential Plan Review Approved 05/19/2020 05/18/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,267.14 $1,267.14 Paid 05/18/2020
Right of Way Permit Fee $80.00 $80.00 Paid 05/18/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 05/18/2020
8331507-Sewer Connection Fee $540.00 $540.00 Paid 05/18/2020
Water Tap Fee $3,477.00 $3,477.00 Paid 05/18/2020
Water Meter Fee $425.02 $425.02 Paid 05/18/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 6/10/2020 6/10/2020 06/10/2020
Electrical Service Inspection Passed 8/13/2020 8/13/2020 08/13/2020
Gas Piping Inspection - Residential Passed 8/13/2020 8/13/2020 08/13/2020
Gas Service Inspection - Residential Passed 8/13/2020 8/13/2020 08/13/2020
All Rough Inspection - Residential Failed 8/13/2020 8/13/2020 08/13/2020
Misc
Corrective Action Required
08/13/2020
- Post address - Remove siding front garage to allow inspection of foundation portal straps - Security blocking at back door - Secure all DWV 2” or less at mid point - Fireblock deadspace front bedroom #5 - Remove front porch lid to allow inspection of all truss hangers - EC#2 per plans - Install structural plate straps on all plates bored more than 50%.
All Rough Inspection - Residential Failed 8/18/2020 8/18/2020 08/18/2020
Misc
Corrective Action Required
08/18/2020
- EC#2 per plans - Install structural plate straps on all plates bored more than 50% - see 1st floor bath DWV at bearing wall, kitchen DWV
Footing Inspection - Residential Passed 08/19/2020
All Rough Inspection - Residential Passed 8/19/2020 8/19/2020 08/19/2020
Misc
Resolved
08/19/2020
Sewer Service Inspection - R Passed 8/24/2020 (11:00) 8/24/2020 08/24/2020
Water Service Inspection - R Passed 8/26/2020 (1:00) 8/26/2020 08/26/2020
Occupancy Inspection - Codes Residential Failed 10/13/2020 10/13/2020 10/13/2020
Corrective Action Required
10/13/2020
-Complete final grade and sod -Final driveway inspection -Light fixtures at garage exterior below 8’ must be sealed type fixture -Splash blocks at all downspout and sump pump discharge locations, minimum 36” distance from foundation -Seal all penetrations in siding, seal along top of meter can and AC disconnect -Complete AC compressor install or remove electrical for compressor from exterior of house Install handle/lock on sliding patio door, two locking devices required on sliding patio doors -secure low volt data cable off of b vent flue at water heater in basement
Driveway Inspection Passed 9/2/2020 (Ready Now) 9/2/2020 10/22/2020
Misc
Informational
10/22/2020
A visual inspection was performed on this driveway and it passes inspection on 10-22-2020.
Occupancy Inspection - Codes Residential Failed 10/23/2020 10/23/2020 10/23/2020
Misc
Corrective Action Required
10/23/2020
-Complete final grade and sod - -Splash blocks at all downspout and sump pump discharge locations, minimum 36” distance from foundation -secure low volt data cable off of b vent flue at water heater in basement ( 1" CLEARANCE ) - SUBMIT BACKFLOW CERTIFICATION LAWN IRRIGATION PERMIT PRRES20203273 - - PROVIDE 6" CLEARANCE WOOD SIDING TO SOD - - NO COVERED PATIO PIER INSPECTION ON RECORD -
Occupancy Inspection - Codes Residential Temporary C of O 10/27/2020 10/27/2020 10/27/2020
Misc
Corrective Action Required
10/23/2020
-Complete final grade and sod - -Splash blocks at all downspout and sump pump discharge locations, minimum 36” distance from foundation OK FOR TCO - EXPIRES 11/10/20
Piers/Caissons Inspection - Residential Passed 11/06/2020
Occupancy Inspection - Codes Residential Full C of O 11/6/2020 11/6/2020 11/06/2020
Misc
Resolved
11/06/2020
Plot Plan Inspection Passed 11/06/2020
Documents & Images
Date Uploaded File Type Document Name
05/15/2020 Letter Permit Application and license tax
05/18/2020 Plans Approved Drawings
05/18/2020 Plot Plan Approved Plot Plan
05/18/2020 Plans Approved Truss Package
05/18/2020 Plans Approved Truss Layout
05/18/2020 Receipt Receipt for transaction:2020-002203
05/18/2020 Letter DS Building Permit
05/22/2020 Engineer Report/Study Lot 66 Hawthorne Ridge Footing Inspection
05/27/2020 Letter Lot 66 Hawthorne Ridge- Wall Inspection
06/10/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/13/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter INSPECTION SUMMARY
08/19/2020 Letter INSPECTION SUMMARY
08/19/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/27/2020 Letter Codes Temporary Certificate of Occupancy
11/06/2020 Letter INSPECTION SUMMARY
11/06/2020 Letter Field Certificate of Occupancy
11/06/2020 Letter Codes Final Certificate of Occupancy
11/06/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home