Permit Application Status

PRRES20200933


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20200933
Building Permit - Residential
Final Completion
ALTERATION SINGLE FAMILY
FINISHED BASEMENT
04/14/2020
04/14/2020
07/01/2020
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/14/2020 04/14/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Add/Alter Single Family $72.78 $72.78 Paid 04/14/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Residential Failed 5/1/2020 5/1/2020 05/01/2020
Misc
Corrective Action Required
05/01/2020
- Seal all upward penetrations at top plate -
All Rough Inspection - Residential Passed 5/5/2020 5/5/2020 05/05/2020
Misc
Resolved
05/05/2020
Final Inspection - Residential Passed 6/30/2020 (7:00AM to 4:00PM) 6/30/2020 06/30/2020
Documents & Images
Date Uploaded File Type Document Name
04/14/2020 Scope of Work Scope of Work
04/14/2020 Plans Approved Drawings
04/14/2020 Receipt Receipt for transaction:2020-001519
04/14/2020 Letter DS Building Permit
05/01/2020 Letter INSPECTION SUMMARY
05/05/2020 Letter INSPECTION SUMMARY
06/30/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home