NEW HOUSE COVERED DECK UNFINISHED BASEMENT
03/01/2019
03/13/2019
12/03/2019
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
DUSTIN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/05/2019 03/08/2019
Steve Conrick
Drainage swales
Corrective Action Required
03/05/2019

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provided ***Call out the swale in the rear yard***
As-graded plot plan
Corrective Action Required
03/05/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. ***Add note "AS-GRADED PLOT PLAN IS REQUIRED PRIOR TO SODDING"***
Residential Plan Review Approved 03/05/2019 03/01/2019
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $938.57 $938.57 Paid 03/13/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/13/2019
8331504-EFHB Middle Big Creek, Full $468.72 $468.72 Paid 03/13/2019
8331507-Sewer Connection Fee $420.00 $420.00 Paid 03/13/2019
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 03/13/2019
8350015-Water Meter Fee $408.37 $408.37 Paid 03/13/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/28/2019 at 11:30 AM 05/28/2019
Sewer Service Inspection - R Passed 6/13/2019 6/13/2019 06/13/2019
Misc
Corrective Action Required
06/13/2019
Need address posted for any future inspections.
Water Service Inspection - R Partial 06/13/2019
Water Service Inspection - R Passed 6/14/2019 6/14/2019 at 10:00 AM 06/14/2019
Underslab Plumbing Inspection - Residential Passed 6/17/2019 6/17/2019 06/17/2019
Electrical Service Inspection Passed 9/4/2019 9/4/2019 09/04/2019
Gas Piping Inspection - Residential Passed 9/4/2019 9/4/2019 09/04/2019
Gas Service Inspection - Residential Passed 9/4/2019 9/4/2019 09/04/2019
All Rough Inspection - Residential Failed 9/4/2019 9/4/2019 09/04/2019
Misc
Corrective Action Required
09/04/2019
** Three I-beams in basement have been extended anywhere from 3” to 6”. Please supply an engineers approval of this repair method ** ** 3” hole in floor between master bathroom and bathroom by exterior wall needs to be draft stopped ** ** Cleanout in basement by bathroom does not have the required clearance ** ** Wall studs in basement bathroom wall need stud shoes ** ** A stud shoe is needed in wall between bathroom and master bathroom **
All Rough Inspection - Residential Passed 9/6/2019 9/6/2019 09/06/2019
Misc
Resolved
09/06/2019
** Three I-beams in basement have been extended anywhere from 3” to 6”. Please supply an engineers approval of this repair method ** ** 3” hole in floor between master bathroom and bathroom by exterior wall needs to be draft stopped ** ** Cleanout in basement by bathroom does not have the required clearance ** ** Wall studs in basement bathroom wall need stud shoes ** ** A stud shoe is needed in wall between bathroom and master bathroom **
Sidewalk Inspection Partial 9/26/2019 09/26/2019
Misc
Informational
09/26/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Partial 9/26/2019 09/26/2019
Misc
Informational
09/26/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 10/3/2019 10/03/2019
Misc
Informational
09/26/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 10/3/2019 10/03/2019
Misc
Informational
09/26/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Plot Plan Inspection Passed 11/14/2019 11/14/2019
Occupancy Inspection - Codes Residential Failed 11/19/2019 11/19/2019 11/19/2019
Misc
Corrective Action Required
11/19/2019
- install erosion control at front of lot, clean up street and curb - Seal exterior light fixtures - anti-siphon set screw needs to be installed properly - hot water heater discharge pipe is too close to the finished floor, cut back to code - hole in downstairs bathroom ceiling needs to be fixed - hole in north basement bedroom ceiling needs to be fixed - low battery warning CO detector outside of front bedroom on 1st floor - sod, splash blocks, final grade
Occupancy Inspection - Codes Residential Failed 12/2/2019 12/2/2019 12/02/2019
Misc
Corrective Action Required
11/19/2019
- anti-siphon set screw needs to be installed properly, needs to be broken off - receptacle in NW basement bedroom needs faceplate
Occupancy Inspection - Codes Residential Full C of O 12/3/2019 12/3/2019 12/03/2019
Documents & Images
Date Uploaded File Type Document Name
03/05/2019 Receipt Receipt for transaction: 2019-000728
03/05/2019 Letter Codes Residential Plan Review
03/13/2019 Receipt Receipt for transaction: 2019-000848
03/13/2019 Letter Codes Building Permit
03/14/2019 Plot Plan DOC031419-03142019080303
05/28/2019 Letter INSPECTION SUMMARY
06/11/2019 Engineer Report/Study DOC061119-002
06/13/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
06/17/2019 Letter INSPECTION SUMMARY
09/04/2019 Letter INSPECTION SUMMARY
09/04/2019 Letter INSPECTION SUMMARY
09/04/2019 Letter INSPECTION SUMMARY
09/04/2019 Letter INSPECTION SUMMARY
09/06/2019 image engineers letter for I-beams
09/06/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
10/03/2019 Letter INSPECTION SUMMARY
10/03/2019 Letter INSPECTION SUMMARY
11/13/2019 LOT 49 ASBUILT
11/14/2019 Letter INSPECTION SUMMARY
11/19/2019 Letter INSPECTION SUMMARY
12/02/2019 Letter INSPECTION SUMMARY
12/03/2019 Letter Field Certificate of Occupancy
12/03/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home