Permit Application Status

PRRES20180896


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20180896
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE UNFINISHED BASEMENT PATIO
04/02/2018
05/30/2018
05/28/2019
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 04/04/2018 05/29/2018
Brandon Kalwei
Plot Plan Review Approved 05/29/2018 05/29/2018
Troy Thompson
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $882.37 $882.37 Paid 05/30/2018
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 05/30/2018
8331507-Sewer Connection Fee $450.00 $450.00 Paid 05/30/2018
8331401-Water Tap Fee $3,343.00 $3,343.00 Paid 05/30/2018
8350015-Water Meter Fee $431.83 $431.83 Paid 05/30/2018
8331504-EFHB Middle Big Creek, Full $502.20 $502.20 Paid 05/30/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/17/2018 (11:30) 7/17/2018 07/17/2018
Sewer Service Inspection - R Partial 8/10/2018 (3:00) 8/10/2018 at 3:30 PM 08/10/2018
Sewer Service Inspection - R Passed 8/13/2018 (10:30) 8/13/2018 08/13/2018
Water Service Inspection - R Passed 8/13/2018 8/13/2018 08/13/2018
Underslab Plumbing Inspection - Residential Passed 8/16/2018 8/16/2018 at 9:00 AM 08/16/2018
Piers/Caissons Inspection - Residential Passed 8/29/2018 (1:00) 8/29/2018 at 1:45 PM 08/29/2018
Electrical Service Inspection Passed 10/2/2018 10/2/2018 at 2:00 PM 10/02/2018
Gas Piping Inspection - Residential Passed 10/2/2018 10/2/2018 at 2:11 PM 10/02/2018
Gas Service Inspection - Residential Passed 10/2/2018 10/2/2018 at 2:20 PM 10/02/2018
All Rough Inspection - Residential Failed 10/2/2018 10/2/2018 at 2:26 PM 10/02/2018
Misc
Corrective Action Required
10/02/2018
• nail all double joists both sides • Fire stop all horizontal nm electrical penetrations in combustion and return air spaces in kitchen • Fire stop at thermostat wire penetrations in return air space • Fire stop unused penetrations at south bump out in basement • Protect nm electrical and water lines along Joists in basement by heat ac duct • Heat flue within 6” of combustible surface at radon in basement • •
All Rough Inspection - Residential Passed 10/4/2018 10/4/2018 at 9:30 AM 10/04/2018
Misc
Resolved
10/04/2018
• nail all double joists both sides • Fire stop all horizontal nm electrical penetrations in combustion and return air spaces in kitchen • Fire stop at thermostat wire penetrations in return air space • Fire stop unused penetrations at south bump out in basement • Protect nm electrical and water lines along Joists in basement by heat ac duct • Heat flue within 6” of combustible surface at radon in basement • •
Driveway Inspection Partial 10/31/2018 10/31/2018 at 9:15 AM 10/31/2018
Misc
Corrective Action Required
10/31/2018
The driveway has been inspected, aggregate is compacted and forms are set.
Misc
Corrective Action Required
10/31/2018
The driveway has been inspected, aggregate is compacted and forms are set.
Misc
Corrective Action Required
10/31/2018
The driveway has been inspected, aggregate is compacted and forms are set.
Sidewalk Inspection Partial 10/31/2018 10/31/2018 at 9:30 AM 10/31/2018
Misc
Corrective Action Required
10/31/2018
The sidewalk has been inspected, aggregate is compacted and forms are set to spec.
Driveway Inspection Passed 11/5/2018 at 10:00 AM 11/05/2018
Misc
Corrective Action Required
10/31/2018
The driveway has been inspected, aggregate is compacted and forms are set.
Misc
Corrective Action Required
11/05/2018
The driveway has been inspected and meets all specs.
Sidewalk Inspection Passed 11/5/2018 at 10:15 AM 11/05/2018
Misc
Informational
11/05/2018
Joe Starlin 11/05/2018 11:06 AM The sidewalk has been inspected and is in spec.
Occupancy Inspection - Codes Residential Temporary C of O 12/13/2018 12/13/2018 at 11:00 AM 12/13/2018
Misc
Corrective Action Required
12/13/2018
* FINAL GRADING *SOD
Occupancy Inspection - Codes Residential Temporary C of O 2/13/2019 at 7:30 AM 02/13/2019
Misc
Corrective Action Required
12/13/2018
* FINAL GRADING *SOD
Plot Plan Inspection Passed 5/28/2019 05/28/2019
Occupancy Inspection - Codes Residential Full C of O 5/28/2019 5/28/2019 at 8:15 AM 05/28/2019
Misc
Corrective Action Required
02/13/2019
* FINAL GRADING *SOD
Documents & Images
Date Uploaded File Type Document Name
05/30/2018 Receipt Receipt for transaction: 2018-003289
05/30/2018 Letter Codes Building Permit
06/01/2018 Plot Plan DOC060118-007
07/05/2018 Engineer Report/Study 2018.06.27_1617 SW MD Lot 44_The Manor
07/17/2018 Letter Inspection Summary
08/10/2018 Letter Inspection Summary
08/13/2018 Letter Inspection Summary
08/16/2018 Letter Inspection Summary
08/29/2018 Letter Inspection Summary
10/02/2018 Letter Inspection Summary
10/04/2018 Letter Inspection Summary
10/31/2018 Letter Inspection Summary
10/31/2018 DF20FE27-EF28-488C-A8E6-90A460EF3429
10/31/2018 Letter Inspection Summary
11/05/2018 Letter Inspection Summary
11/05/2018 Letter Inspection Summary
11/05/2018 Letter DE-Daily Inspection Summary
12/13/2018 Letter Codes Temporary Certificate of Occupancy
02/13/2019 Letter Codes Temporary Certificate of Occupancy
05/28/2019 Letter INSPECTION SUMMARY
05/28/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home