Summary
PRRES20180728
Building Permit - Residential
Certificate of Occupancy
MAR INVESTMENTS INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
03/20/2018
03/28/2018
04/10/2019
Locations
Contacts
MAR INVESTMENTS INC, Address:PO BOX 847  
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
LUCAS ELECTRIC , Address:517 MARGARET LN, Phone:(816) 807-4432  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 03/22/2018 03/27/2018
Kim Brennan
02 One (1) complete license tax application
Corrective Action Required
03/20/2018

One (1) complete license tax application
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
03/20/2018

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315) in bedroom #6
10 Combustion air
Corrective Action Required
03/20/2018

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
03/20/2018

Identify roof covering material (IRC Section R905)
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
03/20/2018

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1) does not specify uninterrupted height
Plot Plan Review Approved 03/22/2018 03/21/2018
Troy Thompson
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,077.76 $1,077.76 Paid 03/28/2018
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 03/28/2018
8331504-EFHB Middle Big Creek, Full $770.04 $770.04 Paid 03/28/2018
8331507-Sewer Connection Fee $690.00 $690.00 Paid 03/28/2018
8331401-Water Tap Fee $3,343.00 $3,343.00 Paid 03/28/2018
8350015-Water Meter Fee $431.83 $431.83 Paid 03/28/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Not Ready 4/19/2018 (3:00) 4/19/2018 at 1:06 PM 04/19/2018
Misc
Corrective Action Required
04/19/2018
DENIED DUE TO NO EROSION CONTROL
Footing Inspection - Residential Partial 4/20/2018 (1:00) 4/20/2018 at 12:35 PM 04/20/2018
Misc
Partial Correction
04/20/2018
FOOTING SPREAD 32" FEET WITH 4 #4 BARS CONTINUOUS. READ ENGINEER REPORT ON SITE AND IN ACCORDANCE WITH THE LETTER. OKAY TO POUR AT OWN RISK PENDING SUBMITTLE OF ENGINEER APPROVAL.
Underslab Plumbing Inspection - Residential Passed 5/14/2018 5/14/2018 at 1:00 PM 05/14/2018
Sewer Service Inspection - R Passed 5/14/2018 5/14/2018 at 1:16 PM 05/14/2018
Water Service Inspection - R Passed 5/15/2018 5/15/2018 at 10:45 AM 05/15/2018
Gas Piping Inspection - Residential Failed 7/6/2018 7/6/2018 at 8:30 AM 07/06/2018
Misc
Corrective Action Required
07/06/2018
1. NO AIR PRESSURE ON LINE
Electrical Service Inspection Passed 8/1/2018 8/1/2018 at 1:00 PM 08/01/2018
Gas Service Inspection - Residential Failed 8/1/2018 8/1/2018 at 1:10 PM 08/01/2018
Misc
Corrective Action Required
08/01/2018
-NO PSI IN GAS LINE
Gas Piping Inspection - Residential Failed 8/1/2018 8/1/2018 at 1:20 PM 08/01/2018
Misc
Corrective Action Required
08/01/2018
- NO PSI IN GAS LINE - GAS LINE NOT CONNECTED AT FIRE PLACE
All Rough Inspection - Residential Failed 8/1/2018 8/1/2018 at 1:25 PM 08/01/2018
Misc
Corrective Action Required
08/01/2018
- nails sticking out of sill plate at stairs - ledger lock or lag ledger board at deck per code - reframe south wall at office per plans for no door - missing stud in closet side of guest bathtub - need anchors 12” from butt ends of sill plate in garage tighten 2 anchors down - cut studs at southwest bed in basement center of windows - complete hVAC duct work in southwest bedroom in basement -
Piers/Caissons Inspection - Residential Passed 8/3/2018 8/3/2018 08/03/2018
Gas Piping Inspection - Residential Passed 8/6/2018 8/6/2018 at 11:10 AM 08/06/2018
Misc
Resolved
08/06/2018
- NO PSI IN GAS LINE - GAS LINE NOT CONNECTED AT FIRE PLACE
Gas Service Inspection - Residential Passed 8/6/2018 at 11:21 AM 08/06/2018
Misc
Resolved
08/06/2018
-NO PSI IN GAS LINE
All Rough Inspection - Residential Passed 8/8/2018 8/8/2018 at 11:30 AM 08/08/2018
Misc
Resolved
08/08/2018
- nails sticking out of sill plate at stairs - ledger lock or lag ledger board at deck per code - reframe south wall at office per plans for no door - missing stud in closet side of guest bathtub - need anchors 12” from butt ends of sill plate in garage tighten 2 anchors down - cut studs at southwest bed in basement center of windows - complete hVAC duct work in southwest bedroom in basement -
Driveway Inspection Partial 8/30/2018 8/31/2018 at 10:45 AM 08/31/2018
Informational
08/31/2018
Ronald Paynter 08/31/2018 12:05 PM Met with Dan, had him repack aggregate, everything else met specs
Driveway Inspection Passed 9/12/2018 at 1:30 PM 09/12/2018
Informational
09/12/2018
Ronald Paynter 09/12/2018 3:52 PM Finished driveway is in compliance of LS specs
Occupancy Inspection - Codes Residential Failed 11/27/2018 11/27/2018 11/27/2018
Misc
Corrective Action Required
11/27/2018
Floor company there with sign do not enter. Call when ready.
Occupancy Inspection - Codes Residential Failed 11/28/2018 11/28/2018 at 9:00 AM 11/29/2018
Misc
Resolved
11/28/2018
Floor company there with sign do not enter. Call when ready.
Misc
Corrective Action Required
11/28/2018
• Final grade • Sodh
Occupancy Inspection - Codes Residential Temporary C of O 11/29/2018 11/29/2018 at 1:25 PM 11/29/2018
Misc
Resolved
11/29/2018
Floor company there with sign do not enter. Call when ready.
Misc
Corrective Action Required
11/29/2018
• Final grade • Sod
Plot Plan Inspection Passed 4/10/2019 04/10/2019
Occupancy Inspection - Codes Residential Full C of O 4/10/2019 4/10/2019 at 7:45 AM 04/10/2019
Misc
Resolved
04/10/2019
• Final grade • Sod
Documents & Images
Date Uploaded File Type Document Name
03/20/2018 Letter Codes Residential Plan Review
03/28/2018 Receipt Receipt for transaction: 2018-001133
03/28/2018 Letter Codes Building Permit
03/28/2018 Plot Plan DOC032818-010
04/19/2018 Letter Inspection Summary
04/20/2018 Letter Inspection Summary
05/14/2018 Letter Inspection Summary
05/15/2018 Letter Inspection Summary
07/06/2018 Letter Inspection Summary
08/01/2018 Letter Inspection Summary
08/03/2018 Letter DE-Daily Inspection Summary
08/06/2018 Letter Inspection Summary
08/08/2018 Letter Inspection Summary
08/31/2018 Letter DE-Daily Inspection Summary
09/12/2018 Letter DE-Daily Inspection Summary
11/27/2018 Letter INSPECTION SUMMARY
11/28/2018 Letter INSPECTION SUMMARY
11/29/2018 Letter Codes Temporary Certificate of Occupancy
04/10/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home