Permit Application Status

PRRES20171830


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20171830
Building Permit - Residential
Certificate of Occupancy
MAR INVESTMENTS INC
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO
06/05/2017
09/05/2017
06/28/2019
Locations
Contacts
MAR INVESTMENTS INC, Address:PO BOX 847  
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
LUCAS ELECTRIC , Address:517 MARGARET LN, Phone:(816) 807-4432  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/07/2017 08/31/2017
Kim Brennan
Residential Plan Review Approved 06/07/2017 06/05/2017
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $930.95 $930.95 Paid 09/05/2017
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 09/05/2017
8331504-EFHB Middle Big Creek, Full $569.16 $569.16 Paid 09/05/2017
8331507-Sewer Connection Fee $510.00 $510.00 Paid 09/05/2017
8331401-Water Tap Fee $3,310.00 $3,310.00 Paid 09/05/2017
8350015-Water Meter Fee $405.36 $405.36 Paid 09/05/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/22/2017 (11:30) 9/22/2017 at 10:45 AM 09/22/2017
Underslab Plumbing Inspection - Residential Passed 11/6/2017 11/6/2017 at 9:45 AM 11/06/2017
Sewer Service Inspection - R Passed 11/21/2017 at 11:50 AM 11/21/2017
Water Service Inspection - R Passed 11/21/2017 at 12:00 PM 11/21/2017
Piers/Caissons Inspection - Residential Passed 1/25/2018 at 10:45 AM 01/25/2018
Erosion Control Inspection Residential Failed 2/14/2018 02/14/2018
Misc
Corrective Action Required
02/14/2018
RE-ESTABLISH EROSION CONTROL AT FRONT AND CLEAN THE STREET. REQUESTED INSPECTIONS DENIED UNTIL COMPLIANT
Erosion Control Inspection Residential Partial 2/20/2018 at 9:00 AM 02/20/2018
Misc
Partial Correction
02/20/2018
COMPLIANT, PLEASE MAINTAIN
Gas Piping Inspection - Residential Passed 2/14/2018 2/20/2018 at 9:21 AM 02/20/2018
Gas Service Inspection - Residential Passed 2/20/2018 2/20/2018 at 9:06 AM 02/20/2018
All Rough Inspection - Residential Failed 2/27/2018 at 8:20 AM 02/27/2018
Misc
Corrective Action Required
02/27/2018
1. Hoist hanger ceiling joists over garage door. 2. Protect plumbing water master shower, laundry. 3. No listed ground connections in any boxes. 4. Top plate master sink overdrilled. 5. Flash south plumbing vent. 6. Valley rafters need support at the ridge. 7. Vent future basement plumbing. 8. Solid block floor joists over beams. 9. Solid block rear cantilever. 10. Secure fireplace to framing.
Electrical Service Inspection Passed 2/27/2018 at 9:01 AM 02/27/2018
All Rough Inspection - Residential Passed 3/6/2018 at 8:35 AM 03/06/2018
Misc
Resolved
03/06/2018
1. Hoist hanger ceiling joists over garage door. 2. Protect plumbing water master shower, laundry. 3. No listed ground connections in any boxes. 4. Top plate master sink overdrilled. 5. Flash south plumbing vent. 6. Valley rafters need support at the ridge. 7. Vent future basement plumbing. 8. Solid block floor joists over beams. 9. Solid block rear cantilever. 10. Secure fireplace to framing.
Driveway Inspection Partial 3/13/2018 at 11:00 AM 03/13/2018
Informational
03/13/2018
Tom Chandler 03/13/2018 11:03 AM Inspected forms and compacted aggregate only.
Sidewalk Inspection Partial 3/14/2018 3/14/2018 at 10:00 AM 03/14/2018
Informational
03/14/2018
Tom Chandler 03/14/2018 10:15 AM Inspected forms and compacted aggregate only.
Driveway Inspection Passed 3/22/2018 at 11:50 AM 03/22/2018
Informational
03/22/2018
Tom Chandler 03/22/2018 11:53 AM Driveway has been completed and passed final inspection.
Sidewalk Inspection Passed 3/22/2018 at 11:55 AM 03/22/2018
Informational
03/22/2018
Tom Chandler 03/22/2018 11:59 AM Sidewalk has been completed and passed final inspection.
Plot Plan Inspection Passed 06/28/2019
Occupancy Inspection - Codes Residential Full C of O 6/28/2019 6/28/2019 at 7:30 AM 06/28/2019
Documents & Images
Date Uploaded File Type Document Name
09/05/2017 Receipt Receipt for transaction: 2017-006189
09/05/2017 Letter Codes Building Permit
09/05/2017 Plot Plan DOC090517-015
09/22/2017 Activity Document DOC092217
09/22/2017 Letter Inspection Summary
11/06/2017 Letter Inspection Summary
11/21/2017 Letter Inspection Summary
01/25/2018 Letter Inspection Summary
02/14/2018 Letter Inspection Summary
02/27/2018 Letter Inspection Summary
03/06/2018 Letter Inspection Summary
03/13/2018 Letter DE-Daily Inspection Summary
03/14/2018 Letter DE-Daily Inspection Summary
03/22/2018 Letter DE-Daily Inspection Summary
06/28/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home