Summary
PRRES20170757
Building Permit - Residential
Certificate of Occupancy
MONTICELLO HOMES INC
NEW SINGLE FAMILY
NEW HOUSE - COVERED DECK
03/20/2017
03/21/2017
05/23/2018
Locations
Contacts
MONTICELLO HOMES INC, Address:623 NE LONE HILL DR  
MONTICELLO HOMES INC, Address:PO BOX 7005, Phone:(816) 478-4740  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
HATHEWAY ELECTRIC LLC, Address:3125 SW PRYOR RD, Phone:(660) 232-2419  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 03/22/2017 03/21/2017
Jonathon Hilton
Plot Plan Review Approved 03/22/2017 03/21/2017
Nick Lightner
Plot Plan Review (P&D) Approved 03/22/2017 03/21/2017
Christina Stanton
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $806.62 $806.62 Paid 03/21/2017
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 03/21/2017
8331507-Sewer Connection Fee $390.00 $390.00 Paid 03/21/2017
8331401-Water Tap Fee $3,310.00 $3,310.00 Paid 03/21/2017
8350015-Water Meter Fee $405.36 $405.36 Paid 03/21/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/6/2017 (4:30) 4/6/2017 04/06/2017
Underslab Plumbing Inspection - Residential Passed 4/21/2017 4/21/2017 04/21/2017
Erosion Control Inspection Residential Failed 4/21/2017 04/21/2017
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/21/2017
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Passed 4/25/2017 (9:00) 4/25/2017 04/25/2017
Water Service Inspection - R Passed 4/25/2017 (11:30) 4/25/2017 04/25/2017
Piers/Caissons Inspection - Residential Passed 5/17/2017 5/17/2017 05/17/2017
Electrical Service Inspection Failed 6/26/2017 6/26/2017 06/26/2017
Misc
Corrective Action Required
06/26/2017
1. Bond panel. 2. Secure SEC within 12" of panel. 3. Distribution wiring shall not be bundled for more than 24" (throughout basement and at wall adjacent to main entrance.
Gas Service Inspection - Residential Passed 6/26/2017 6/26/2017 06/26/2017
All Rough Inspection - Residential Failed 6/26/2017 6/26/2017 06/26/2017
Misc
Corrective Action Required
06/26/2017
1. Bond elec. panel. 2. Secure SEC within 12" of panel. 3. Distribution wiring shall not be bundled for more than 24" (throughout basement and at wall adjacent to main entrance. 4. Protect wiring that is mounted to under-side of floor joists. 5. Protect wiring that is atop ceiling joists within 6' of attic access. 6. Install elec. nail-guards where needed throughout. 7. Electric receptacles shall be provided within 6' of any point along any wall equal or greater to 2'. (numerous deficiencies observed throughout, particularly in hallways, foyers, and at entrances to bedrooms). 8. Protect plumbing at top of master shower. 9. Support DWV piping every 4' (fixtures do not qualify as supports). *10. Complete installation of mechanical system (line-set and exhaust flue). *To be checked at final.* 11. Strap top-plate of load bearing wall on south side of MstrBR where bored for DWV. 12. Firestop underneath tubs. 13. Nail along bottom of siding on east side of building. 14. Install sill-plate anchors, per code, throughout garage. 15. Nail corner-framing per code. 16. Numerous studs have been spliced - provide full-height studs, from sole-plate to top-plate, of stud-grade material, throughout. 17. Construct / Install purlins, purlin legs, and ridge-braces per plans. 18. Solid-block floor joists at bearing points.
All Rough Inspection - Residential Passed 7/5/2017 7/5/2017 07/05/2017
Misc
Resolved
07/05/2017
1. Bond elec. panel. 2. Secure SEC within 12" of panel. 3. Distribution wiring shall not be bundled for more than 24" (throughout basement and at wall adjacent to main entrance. 4. Protect wiring that is mounted to under-side of floor joists. 5. Protect wiring that is atop ceiling joists within 6' of attic access. 6. Install elec. nail-guards where needed throughout. 7. Electric receptacles shall be provided within 6' of any point along any wall equal or greater to 2'. (numerous deficiencies observed throughout, particularly in hallways, foyers, and at entrances to bedrooms). 8. Protect plumbing at top of master shower. 9. Support DWV piping every 4' (fixtures do not qualify as supports). 10. Complete installation of mechanical system (line-set and exhaust flue). 11. Strap top-plate of load bearing wall on south side of MstrBR where bored for DWV. 12. Firestop underneath tubs. 13. Nail along bottom of siding on east side of building. 14. Install sill-plate anchors, per code, throughout garage. 15. Nail corner-framing per code. 16. Numerous studs have been spliced - provide full-height studs, from sole-plate to top-plate, of stud-grade material, throughout. 17. Construct / Install purlins, purlin legs, and ridge-braces per plans. 18. Solid-block floor joists at bearing points.
Electrical Service Inspection Passed 7/5/2017 7/5/2017 07/05/2017
Misc
Resolved
07/05/2017
1. Bond panel. 2. Secure SEC within 12" of panel. 3. Distribution wiring shall not be bundled for more than 24" (throughout basement and at wall adjacent to main entrance.
Driveway Inspection Partial 8/23/2017 8/23/2017 08/23/2017
Driveway Inspection Passed 8/28/2017 08/28/2017
Erosion Control Inspection Residential Passed 04/17/2018
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/17/2018
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Failed 4/17/2018 4/17/2018 at 8:00 AM 04/17/2018
Misc
Corrective Action Required
04/17/2018
-SHALL INSTALL EROSION CONTROL ALONG THE BACK SIDE OF THE LOT. SEE MUD PILE ON CHAPEL MANOR DR -OBTAIN LAWN IRRIGATION PERMIT AND SUBMIT TO CITY THE BACKFLOW TEST REPORT -FINAL GRADE, SOD, SPLASHBLOCKS -INSTALL RECEPTACLE FOR THE KITCHEN ISLAND -THE WALL RECEPTACLE SPACING AT THE KITCHEN COUNTERTOP IS NOT COMPLIANT
Occupancy Inspection - Codes Residential Temporary C of O 4/20/2018 4/20/2018 at 9:00 AM 04/20/2018
Misc
Corrective Action Required
04/17/2018
-FINAL GRADE, SOD, SPLASHBLOCKS -INSTALL RECEPTACLE FOR THE KITCHEN ISLAND **THE RECEPTACLE AT THE KITCHEN ISLAND SHALL BE GFCI-PROTECTED
Occupancy Inspection - Codes Residential Temporary C of O 4/23/2018 4/23/2018 at 8:25 AM 04/23/2018
Misc
Corrective Action Required
04/20/2018
-FINAL GRADE, SOD, SPLASHBLOCKS
Occupancy Inspection - Codes Residential Full C of O 05/23/2018
Misc
Resolved
05/23/2018
-FINAL GRADE, SOD, SPLASHBLOCKS
Documents & Images
Date Uploaded File Type Document Name
03/21/2017 Receipt Receipt for transaction: 2017-001008
03/21/2017 Letter Codes Building Permit
03/21/2017 Plot Plan DOC032117-006
04/06/2017 Letter Inspection Summary
04/21/2017 Letter Inspection Summary
04/25/2017 Letter Inspection Summary
04/25/2017 Letter Inspection Summary
05/17/2017 Letter Inspection Summary
06/26/2017 Letter Inspection Summary
07/05/2017 Letter Inspection Summary
07/06/2017 Engineer Report/Study DOC070617-018
04/17/2018 Letter Inspection Summary
04/19/2018 Code Mod Request IMG_0092
04/19/2018 Code Mod Request IMG_0093
04/19/2018 Code Mod Request IMG_0094
04/19/2018 Code Mod Request IMG_0095
04/19/2018 Code Mod Request code modfication
04/20/2018 Letter Codes Temporary Certificate of Occupancy
04/23/2018 Letter Codes Temporary Certificate of Occupancy
05/23/2018 Letter Field Certificate of Occupancy
05/24/2018 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home