Permit Application Status

PRPWRW20252095


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRPWRW20252095
Public Works Right of Way Permit
Expired
MISSOURI HWY & TRANSPORTATION COMMISSION
PW ROW Gas
Spire – Mears – Colbern Rd 12” Jesse Flandermeyer (816) 548-0875 Dig 2 10’x10’ holes in the dirt for bore entries on main replacement Work will be from station 48+00 to station 93+00 (Bernard Campbell Middle School to Independence Ave and along Colbern Rd, where we have a 75’x150’ temp workspace) Please refer to pages C-204 through C-207 (some work will be within MODOT right of way; a separate permit will be obtained for those areas) Mears will provide a traffic control Max task 31048669, Project 806531 **Please reach out to Jesse Flandermeyer for any further information**
05/20/2025
05/21/2025
07/21/2025
Locations
Contacts
Spire Energy  
MISSOURI HWY & TRANSPORTATION COMMISSION, Address:600 N COLBERN RD  
Tiffany Hanks, Address:3025 CLOVER DR SE, Phone:(816) 360-5983  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
ROW Length of Excavation $85.00 $85.00 Paid 05/21/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
05/20/2025 31048669
05/21/2025 Certificate/License PW ROW Permit
05/21/2025 Receipt Receipt for transaction:2025-003619
06/04/2025 Letter PW ROW Inspections Report
07/01/2025 Letter PW ROW Inspections Report
07/16/2025 Letter PW ROW Inspections Report
07/28/2025 Letter PW ROW Inspections Report
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home