Summary


PRPWFC20171401
Public Works Infrastructure Permit - Commercial
Final Acceptance
TOWNSEND SUMMIT LLC
DEVELOPMENT COMPLETE
Widen Ward Rd from Chipman to Tudor with taper north of Tudor Rd. Project includes some storm water work.
05/03/2017
05/09/2017
01/30/2018
Locations
Contacts
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/03/2017 05/03/2017
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Storm Sewer Inspection Fee $1,029.30 $1,029.30 Paid 05/09/2017
Paved Surface Inspection Fee $17,400.97 $17,400.97 Paid 05/09/2017
Site Grading Fee $2,170.17 $2,170.17 Paid 05/09/2017
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm Sewer Construction Inspection Partial 8/15/2017 at 12:12 PM 08/15/2017
PW-Storm Sewer Inspection
Informational
08/15/2017
When I received this project all the storm sewer had already been installed. This project has been on hold for several weeks because the gas line was too low and in the way of the new pavement, the gas company has been out relocating the gas line. While they were working they hit some storm pipe. I took a picture and talked to Jonathan Meyers, he is aware of the situation and so is the gas company.Steve Robbins 08/15/2017 12:30 PM
Storm Sewer Construction Inspection Partial 8/21/2017 at 9:30 AM 08/21/2017
PW-Storm Sewer Inspection
Informational
08/15/2017
When I received this project all the storm sewer had already been installed. This project has been on hold for several weeks because the gas line was too low and in the way of the new pavement, the gas company has been out relocating the gas line. While they were working they hit some storm pipe. I took a picture and talked to Jonathan Meyers, he is aware of the situation and so is the gas company.Steve Robbins 08/15/2017 12:30 PM
PW-Storm Sewer Inspection
Informational
08/21/2017
Jerry Smith is going to be in charge of this project now. I will be shadowing Jerry and doing documentation and learning all I can from him. Today there is nothing going on at this project. It has rained most of the morning.
Storm Sewer Construction Inspection Partial 8/22/2017 at 2:45 PM 08/22/2017
PW-Storm Sewer Inspection
Informational
08/21/2017
When I received this project all the storm sewer had already been installed. This project has been on hold for several weeks because the gas line was too low and in the way of the new pavement, the gas company has been out relocating the gas line. While they were working they hit some storm pipe. I took a picture and talked to Jonathan Meyers, he is aware of the situation and so is the gas company.Steve Robbins 08/15/2017 12:30 PM
PW-Storm Sewer Inspection
Informational
08/21/2017
Jerry Smith is going to be in charge of this project now. I will be shadowing Jerry and doing documentation and learning all I can from him. Today there is nothing going on at this project. It has rained most of the morning.
PW-Storm Sewer Inspection
Informational
08/22/2017
They are still working on the gas line.
Storm Sewer Construction Inspection Passed 8/23/2017 at 2:15 PM 08/24/2017
PW-Storm Sewer Inspection
Informational
08/22/2017
When I received this project all the storm sewer had already been installed. This project has been on hold for several weeks because the gas line was too low and in the way of the new pavement, the gas company has been out relocating the gas line. While they were working they hit some storm pipe. I took a picture and talked to Jonathan Meyers, he is aware of the situation and so is the gas company.Steve Robbins 08/15/2017 12:30 PM
PW-Storm Sewer Inspection
Informational
08/22/2017
Jerry Smith is going to be in charge of this project now. I will be shadowing Jerry and doing documentation and learning all I can from him. Today there is nothing going on at this project. It has rained most of the morning.
PW-Storm Sewer Inspection
Informational
08/22/2017
They are still working on the gas line.
PW-Storm Sewer Inspection
Informational
08/24/2017
The gas company has repaired the storm pipe that they hit, I checked it so they could backfill it.
Site Visit Partial 8/28/2017 at 9:30 AM 08/28/2017
PW-Misc
Informational
08/28/2017
Contractor wanted to know if they needed a proofroll for the fly-ash. I called Jerry and he said yes, and they needed the compaction test results of 95%. He called Jerry and he is going to come watch the proofroll when they get a truck in.
Site Visit Partial 9/5/2017 at 9:00 AM 09/06/2017
PW-Misc
Informational
08/28/2017
Contractor wanted to know if they needed a proofroll for the fly-ash. I called Jerry and he said yes, and they needed the compaction test results of 95%. He called Jerry and he is going to come watch the proofroll when they get a truck in.
PW-Misc
Informational
09/06/2017
Yesterday while Jerry Smith was out they were installing the mo-type 5 and compacting it in.
Miscellaneous PWORKS Inspection Partial 1/30/2018 at 9:50 AM 01/30/2018
PW-Misc
Informational
01/30/2018
The vegetation will be completed and the next phase of this project is started. There was some asphalt and striping that was put in when the temperature was questionable, these items will be monitored and or corrected on the next phase. I talked with Ryan and Mike and they said money was put in escrow for these items so they could get final acceptance. Steve Robbins 01/30/2018 9:56 AM
Erosion Control Inspection Passed 01/30/2018
Curb - Compression Strength Passed 01/30/2018
Curb - Proof Roll Passed 01/30/2018
Grading/Excavation/Fill Inspection Passed 01/30/2018
Pavement-Surface Passed 01/30/2018
Pavement-Proof Roll Passed 01/30/2018
Street - Surface Course Passed 01/30/2018
Street - Striping Passed 01/30/2018
Miscellaneous PWORKS Inspection Partial 3/27/2018 at 11:30 AM 03/27/2018
PW-Misc
Informational
01/30/2018
The vegetation will be completed and the next phase of this project is started. There was some asphalt and striping that was put in when the temperature was questionable, these items will be monitored and or corrected on the next phase. I talked with Ryan and Mike and they said money was put in escrow for these items so they could get final acceptance. Steve Robbins 01/30/2018 9:56 AM
PW-Misc
Informational
03/27/2018
I spoke with Jonathan Meyers from Sapp, we are suppose to meet out on Ward Rd. and go over the striping, vegetation, and a few punch list items that need to be taken care of. We also talked about getting some silt fence up on ward because there was some run-off onto the sidewalk.Steve Robbins 03/27/2018 3:45 PM
Miscellaneous PWORKS Inspection Partial 3/30/2018 at 2:45 PM 03/30/2018
PW-Misc
Informational
03/27/2018
The vegetation will be completed and the next phase of this project is started. There was some asphalt and striping that was put in when the temperature was questionable, these items will be monitored and or corrected on the next phase. I talked with Ryan and Mike and they said money was put in escrow for these items so they could get final acceptance. Steve Robbins 01/30/2018 9:56 AM
PW-Misc
Informational
03/27/2018
I spoke with Jonathan Meyers from Sapp, we are suppose to meet out on Ward Rd. and go over the striping, vegetation, and a few punch list items that need to be taken care of. We also talked about getting some silt fence up on ward because there was some run-off onto the sidewalk.Steve Robbins 03/27/2018 3:45 PM
PW-Misc
Informational
03/30/2018
I spoke with Jonathan about this on the phone, I told him what I thought needed to be done and he was going to go by and check it out and get back with me.Steve Robbins 03/30/2018 3:56 PM
Erosion Control Inspection Partial 4/12/2018 at 9:30 AM 04/12/2018
PW-Misc
Informational
04/12/2018
This morning emery sapp is installing silt fence alon ward rd. in the area's where the silt is running down the hill to the sidewalk up past tudor rd.Steve Robbins 04/12/2018 12:43 PM
ESC - (Vegetation/Ground Cover) Partial 4/13/2018 at 9:00 AM 04/13/2018
PW-Misc
Informational
04/13/2018
Emery Sapp had the contractors out to spray the seed over all the area's that needed to be seeded. The erosion control is also in place.Steve Robbins 04/13/2018 9:46 AM
Erosion Control Inspection Partial 4/16/2018 at 9:45 AM 04/16/2018
PW-Misc
Informational
04/12/2018
This morning emery sapp is installing silt fence alon ward rd. in the area's where the silt is running down the hill to the sidewalk up past tudor rd.Steve Robbins 04/12/2018 12:43 PM
PW-Misc
Informational
04/16/2018
The silt fence has been installed and is in place. They are also working on getting vegetation established. Steve Robbins 04/16/2018 11:57 AM
Miscellaneous PWORKS Inspection Passed 4/30/2018 04/30/2018
PW-Misc
Informational
03/30/2018
The vegetation will be completed and the next phase of this project is started. There was some asphalt and striping that was put in when the temperature was questionable, these items will be monitored and or corrected on the next phase. I talked with Ryan and Mike and they said money was put in escrow for these items so they could get final acceptance. Steve Robbins 01/30/2018 9:56 AM
PW-Misc
Informational
03/30/2018
I spoke with Jonathan Meyers from Sapp, we are suppose to meet out on Ward Rd. and go over the striping, vegetation, and a few punch list items that need to be taken care of. We also talked about getting some silt fence up on ward because there was some run-off onto the sidewalk.Steve Robbins 03/27/2018 3:45 PM
PW-Misc
Informational
03/30/2018
I spoke with Jonathan about this on the phone, I told him what I thought needed to be done and he was going to go by and check it out and get back with me.Steve Robbins 03/30/2018 3:56 PM
ESC - (Vegetation/Ground Cover) Partial 4/30/2018 at 1:15 PM 04/30/2018
PW-Misc
Informational
04/13/2018
Emery Sapp had the contractors out to spray the seed over all the area's that needed to be seeded. The erosion control is also in place.Steve Robbins 04/13/2018 9:46 AM
PW-Misc
Informational
04/30/2018
The contractors did hydro-seeding over all the areas that needed to be re-seeded. Hopefully we will get some rain and it will will in where it was needed.Steve Robbins 04/30/2018 3:21 PM
Erosion Control Inspection Passed 6/1/2018 at 9:00 AM 06/01/2018
PW-Misc
Informational
04/16/2018
This morning emery sapp is installing silt fence alon ward rd. in the area's where the silt is running down the hill to the sidewalk up past tudor rd.Steve Robbins 04/12/2018 12:43 PM
PW-Misc
Informational
04/16/2018
The silt fence has been installed and is in place. They are also working on getting vegetation established. Steve Robbins 04/16/2018 11:57 AM
PW-Misc
Informational
06/01/2018
The erosion control silt fence is up and in place. The vegetation has been established but I am going to have them leave the silt fence up because another project is close to starting on this site.Steve Robbins 06/01/2018 2:23 PM
ESC - (Vegetation/Ground Cover) Passed 6/1/2018 at 9:15 AM 06/01/2018
PW-Misc
Informational
04/30/2018
Emery Sapp had the contractors out to spray the seed over all the area's that needed to be seeded. The erosion control is also in place.Steve Robbins 04/13/2018 9:46 AM
PW-Misc
Informational
04/30/2018
The contractors did hydro-seeding over all the areas that needed to be re-seeded. Hopefully we will get some rain and it will will in where it was needed.Steve Robbins 04/30/2018 3:21 PM
PW-Misc
Informational
06/01/2018
The vegetation has been established, 70%. Steve Robbins 06/01/2018 2:25 PM
Miscellaneous PWORKS Inspection Partial 6/1/2018 at 9:30 AM 06/01/2018
PW-Misc
Informational
06/01/2018
I spoke with Jonathan Meyers from Sapp and Mike from Streetwise. Streetwise is planning on being in the area in a month or 2 as they are doing work for the city right now and they will touch up the striping that was done out of spec (per Jerry Smiths punch list). There is also a 1 foot wide section of asphalt that is the width of the street on Donovan by the ADA crossing that was put in out of spec, I feel like it has held up well over the winter and would be a bigger problem if we had them do it over. The vegetation has been established and those are all that was on the punch list. I spoke with Ryan about this and we decided to have an e-mail from Sapp saying they will correct any defects when they do the next section of ward rd., which is coming up soon. When we get an e-mail from sapp we can release the money in escrow for the punch list.Steve Robbins 06/01/2018 2:45 PM
Miscellaneous PWORKS Inspection Passed 6/6/2018 at 7:30 AM 06/06/2018
PW-Misc
Informational
06/01/2018
I spoke with Jonathan Meyers from Sapp and Mike from Streetwise. Streetwise is planning on being in the area in a month or 2 as they are doing work for the city right now and they will touch up the striping that was done out of spec (per Jerry Smiths punch list). There is also a 1 foot wide section of asphalt that is the width of the street on Donovan by the ADA crossing that was put in out of spec, I feel like it has held up well over the winter and would be a bigger problem if we had them do it over. The vegetation has been established and those are all that was on the punch list. I spoke with Ryan about this and we decided to have an e-mail from Sapp saying they will correct any defects when they do the next section of ward rd., which is coming up soon. When we get an e-mail from sapp we can release the money in escrow for the punch list.Steve Robbins 06/01/2018 2:45 PM
PW-Misc
Informational
06/06/2018
Emery Sapp has agreed to take care of the touch -up pavement markings for ward rd. They have finished the rest of the punch list.Steve Robbins 06/06/2018 9:33 AM
Documents & Images
Date Uploaded File Type Document Name
05/09/2017 Receipt Receipt for transaction: 2017-001993
08/15/2017 Letter PW-Daily Inspection Summary
08/21/2017 Letter PW-Daily Inspection Summary
08/22/2017 Letter PW-Daily Inspection Summary
08/24/2017 Letter PW-Daily Inspection Summary
08/28/2017 Letter PW-Daily Inspection Summary
08/28/2017 Letter PW-Daily Inspection Summary
09/06/2017 Letter DE-Daily Inspection Summary
11/08/2017 Letter DE-Certificate of Substantial Completion Multiple Lot
11/08/2017 Letter Maintenance Bond
11/09/2017 Letter Ward Road Final Affidavit
01/30/2018 Letter DE-Certificate of Final Acceptance (Commercial)
01/30/2018 Ward Rd. Expansion
01/30/2018 Letter DE-Daily Inspection Summary
03/27/2018 Letter DE-Daily Inspection Summary
03/30/2018 Letter DE-Daily Inspection Summary
04/12/2018 Letter DE-Daily Inspection Summary
04/13/2018 Letter DE-Daily Inspection Summary
04/16/2018 Letter DE-Daily Inspection Summary
04/30/2018 Letter DE-Daily Inspection Summary
06/01/2018 Letter DE-Daily Inspection Summary
06/01/2018 Letter DE-Daily Inspection Summary
06/01/2018 Letter DE-Daily Inspection Summary
06/06/2018 Letter DE-Daily Inspection Summary
06/06/2018 Email ward rd.
07/13/2021 Security Document Bond
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home