Summary


PRPWFC20161633
Public Works Infrastructure Permit - Commercial
Final Acceptance
THE CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
Lee's Summit Honda Parking Addition (301 NE Colbern Rd)
07/06/2016
11/09/2016
11/01/2017
Locations
Contacts
THE CITY OF LEES SUMMIT, Address:207 SW MARKET  
MEYER BROTHERS BUILDING COMPANY, Address:800 E 101ST TER STE 120, Phone:(816) 246-4800  
LEE'S SUMMIT HONDA, Address:401 NE COLBERN RD, Phone:(816) 251-8700  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/06/2016 10/31/2016
Bob Burns
Fees
Paid Fees Amount Paid Owing Date Paid
9110068-Storm Fee $280.80 $280.80 Paid 10/26/2016
$280.80
9110081-Paved Surface Inspection Fee $9,885.96 $9,885.96 Paid 10/26/2016
9110071-Site Grading Fee $301.26 $301.26 Paid 10/26/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Pipe Partial 11/15/2016
PW-Misc
Corrective Action Required
11/15/2016
The storm water structures A-1, A-2, also the storm pipe has been tied into storm structure B-2. they are also building the retaining wall aroud the storm basin.Steve Robbins 11/15/2016 4:12 PM
Commercial Curb Inspection Passed 11/18/2016 11/18/2016
PW-Misc
Informational
11/16/2016
Proof roll for the curb was done on 11/1/16 . Still need one for the parking lot.Steve Robbins 11/16/2016 2:22 PM
PW-Misc
Informational
11/18/2016
All the curb has been installed, they are finishing putting in the bases for the lights that go in the parking lot. The plans call for 7-8 inches of aphalt on top of the dirt, I discussed this with Kent and Gene and these plans were initiated back in 2015, Gene said he was ok with how the plan are. I tried to convince them to go with geo-grid but they didnt want to. They will be getting compaction tests on the dirt before they put ashpalt in.Steve Robbins 11/18/2016 10:49 AM
Curb - Proof Roll Partial 11/1/2016 11/21/2016
PW-Misc
Informational
11/16/2016
Proof roll for the curb was done on 11/1/16 . Still need one for the parking lot.Steve Robbins 11/16/2016 2:22 PM
PW-Misc
Informational
11/21/2016
Today they are doing grading and they did a stringline to make sure they have at least 7' dept as per the plans. They still need a proofroll and a compaction test on the parking lot.Steve Robbins 11/21/2016 8:52 AM
Curb - Proof Roll Passed 11/22/2016 11/21/2016
PW-Misc
Informational
11/21/2016
Proof roll for the curb was done on 11/1/16 . Still need one for the parking lot.Steve Robbins 11/16/2016 2:22 PM
PW-Misc
Informational
11/21/2016
Today we did a proof roll on the parking lot, The proof roll passed and the compaction tests were taken and they will give thosed to me later.Steve Robbins 11/21/2016 3:57 PM
PW-Misc
Informational
11/21/2016
Today they are doing grading and they did a stringline to make sure they have at least 7' dept as per the plans. They still need a proofroll and a compaction test on the parking lot.Steve Robbins 11/21/2016 8:52 AM
Proof roll parking lot Passed 11/21/2016 11/22/2016
PW-Misc
Informational
11/22/2016
Proofroll has been completed and passedSteve Robbins 11/22/2016 11:44 AM
Pavement-Surface Partial 11/22/2016 11/22/2016
PW-Misc
Informational
11/22/2016
Today 5" of base was put down for about 1/3 of the parking lot , it started to rain so they have stopped for the day. This parking lot is getting 7" of asphalt on dirt per the plans, they were initiated in 2015, I talked to Gene and Kent and it has been approved.Steve Robbins 11/22/2016 11:51 AM
Pavement-Surface Partial 11/23/2016 11/23/2016
PW-Misc
Informational
11/22/2016
Today 5" of base was put down for about 1/3 of the parking lot , it started to rain so they have stopped for the day. This parking lot is getting 7" of asphalt on dirt per the plans, they were initiated in 2015, I talked to Gene and Kent and it has been approved.Steve Robbins 11/22/2016 11:51 AM
PW-Misc
Informational
11/23/2016
Today they are continuing to base the parking lot, they have about 3/4 of it completed. They should finish it up this afternoon and they said they will probably be back to due surface on tuesdayl.Steve Robbins 11/23/2016 11:02 AM
Pavement-Surface Passed 11/28/2016 11/28/2016
PW-Misc
Informational
11/23/2016
Today 5" of base was put down for about 1/3 of the parking lot , it started to rain so they have stopped for the day. This parking lot is getting 7" of asphalt on dirt per the plans, they were initiated in 2015, I talked to Gene and Kent and it has been approved.Steve Robbins 11/22/2016 11:51 AM
PW-Misc
Informational
11/28/2016
On wednesday the 23rd of november they finished the base lift for the parking. They are planning on coming back tomorrow on the 29 to finish the surface.Steve Robbins 11/28/2016 7:58 AM
PW-Misc
Informational
11/23/2016
Today they are continuing to base the parking lot, they have about 3/4 of it completed. They should finish it up this afternoon and they said they will probably be back to due surface on tuesdayl.Steve Robbins 11/23/2016 11:02 AM
Street - Surface Course Passed 11/29/2016 11/30/2016
PW-Misc
Informational
11/30/2016
Yesterday the surface asphalt was put in on the base. The asphalt for the parking lot is now complete.Steve Robbins 11/30/2016 8:58 AM
Storm - Pipe Passed 11/16/2016 12/15/2016
PW-Misc
Corrective Action Required
11/15/2016
The storm water structures A-1, A-2, also the storm pipe has been tied into storm structure B-2. they are also building the retaining wall aroud the storm basin.Steve Robbins 11/15/2016 4:12 PM
Storm - Rip Rap Passed 12/20/2016
PW-Misc
Informational
12/20/2016
The rip rap has been installed according to the plans.Steve Robbins 12/20/2016 3:59 PM
Erosion Control Inspection Passed 12/21/2016 12/21/2016
Storm - Swales Passed 12/21/2016
Storm - Inlets Clean Passed 12/21/2016
PW-Misc
Informational
12/21/2016
All the storm inlets are clean and pass inspections.Steve Robbins 12/21/2016 2:13 PM
Grading/Excavation/Fill Inspection Partial 12/21/2016
PW-Misc
Informational
12/21/2016
Some grading in the front by colbern rd needs to be graded better, there are also a few items by the storm basin that needs to be smoothed out a little better also.Steve Robbins 12/21/2016 2:19 PM
Storm - Outlet Structure Passed 12/27/2016
Grading/Excavation/Fill Inspection Passed 12/29/2016 01/17/2017
PW-Misc
Informational
12/21/2016
Some grading in the front by colbern rd needs to be graded better, there are also a few items by the storm basin that needs to be smoothed out a little better also.Steve Robbins 12/21/2016 2:19 PM
PW-Misc
Informational
01/17/2017
All the grading has been completed for this job site.Steve Robbins 01/17/2017 2:33 PM
ESC - (Vegetation/Ground Cover) Partial 4/3/2017 04/03/2017
PW-Misc
Corrective Action Required
04/03/2017
They do not have enough vegetation yet to get final completion. The gas is coming up and it is getting close.Steve Robbins 04/03/2017 3:02 PM
ESC - (Vegetation/Ground Cover) Failed 7/6/2017 07/06/2017
PW-Misc
Corrective Action Required
04/03/2017
They do not have enough vegetation yet to get final completion. The gas is coming up and it is getting close.Steve Robbins 04/03/2017 3:02 PM
PW-Misc
Corrective Action Required
07/06/2017
The grass still needs to come up more on the hill on the east side, they will overseed again in august.Steve Robbins 07/06/2017 2:12 PM
ESC - (Vegetation/Ground Cover) Failed 8/18/2017 at 8:31 AM 08/18/2017
PW-Misc
Corrective Action Required
07/06/2017
They do not have enough vegetation yet to get final completion. The gas is coming up and it is getting close.Steve Robbins 04/03/2017 3:02 PM
PW-Misc
Corrective Action Required
07/06/2017
The grass still needs to come up more on the hill on the east side, they will overseed again in august.Steve Robbins 07/06/2017 2:12 PM
Informational
08/18/2017
There is still a lot of bare spots at the top of the hill on the west side of the parking lot. some of it has eroded.Steve Robbins 08/18/2017 8:33 AM
ESC - (Vegetation/Ground Cover) Passed 10/31/2017 at 8:45 AM 10/31/2017
PW-Misc
Corrective Action Required
10/03/2017
They do not have enough vegetation yet to get final completion. The gas is coming up and it is getting close.Steve Robbins 04/03/2017 3:02 PM
PW-Misc
Informational
10/03/2017
The contractors re-graded the top of the hill on the east side and the put more seed down.Steve Robbins 10/03/2017 3:43 PM
PW-Misc
Informational
10/31/2017
The vegetation has been established at 70%.Steve Robbins 10/31/2017 9:04 AM
ESC - (Vegetation/Ground Cover) Passed 10/3/2017 at 3:15 PM 11/01/2017
PW-Misc
Corrective Action Required
08/18/2017
They do not have enough vegetation yet to get final completion. The gas is coming up and it is getting close.Steve Robbins 04/03/2017 3:02 PM
PW-Misc
Informational
10/03/2017
The contractors re-graded the top of the hill on the east side and the put more seed down.Steve Robbins 10/03/2017 3:43 PM
Documents & Images
Date Uploaded File Type Document Name
07/06/2016 Receipt Receipt for transaction: 2016-004573
07/06/2016 Receipt Receipt for transaction: 2016-004590
09/30/2016 Engineer Report/Study Revised Engineers Estimate 8-25-16
10/26/2016 Receipt Receipt for transaction: 2016-006580
10/31/2016 Letter PW-Permit
11/15/2016 Letter PW-Daily Inspection Summary
11/16/2016 Letter PW-Daily Inspection Summary
11/18/2016 Letter PW-Daily Inspection Summary
11/21/2016 Letter PW-Daily Inspection Summary
11/21/2016 Letter PW-Daily Inspection Summary
11/22/2016 Letter PW-Daily Inspection Summary
11/22/2016 Letter PW-Daily Inspection Summary
11/23/2016 Letter PW-Daily Inspection Summary
11/28/2016 Letter PW-Daily Inspection Summary
11/30/2016 Letter PW-Daily Inspection Summary
12/20/2016 Letter PW-Daily Inspection Summary
12/21/2016 Letter PW-Daily Inspection Summary
12/21/2016 Letter PW-Daily Inspection Summary
12/21/2016 Letter PW-Certificate of Substantial Completion Multiple Lot
12/22/2016 Letter PW-Punch List
12/27/2016 Honda Substantial and punch
01/17/2017 Letter PW-Daily Inspection Summary
04/03/2017 Letter PW-Daily Inspection Summary
07/06/2017 Letter PW-Daily Inspection Summary
08/18/2017 Letter PW-Daily Inspection Summary
10/03/2017 Letter DE-Daily Inspection Summary
10/31/2017 Letter DE-Daily Inspection Summary
10/31/2017 Letter DE-Certificate of Final Acceptance (Commercial)
10/31/2017 Honda Parking Lot Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home