Summary


PRPWFC20160642
Public Works Infrastructure Permit - Commercial
Final Acceptance
REORGANIZED SCHOOL DISTRICT NO 7
DEVELOPMENT COMPLETE
Full site permit for new commercial development
03/29/2016
03/31/2016
10/27/2017
Locations
Contacts
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
GEORGE J SHAW CONSTRUCTION CO INC, Address:1601 BELLEFONTAINE, Phone:(816) 231-8200  
THORNE & SON ASPHALT PAVING CO, Address:PO BOX 9308, Phone:(816) 358-4608  
  
REORGANIZED SCHOOL DISTRICT NO 7, Address:301 NE TUDOR RD  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $1,027.95 $1,027.95 Paid 03/29/2016
Water Insp Fee $2,663.25 $2,663.25 Paid 03/29/2016
Storm Sewer Inspection Fee $8,198.10 $8,198.10 Paid 03/29/2016
Paved Surface Inspection Fee $13,988.43 $13,988.43 Paid 03/29/2016
Site Grading Fee $1,203.54 $1,203.54 Paid 03/29/2016
Water Test Fee $400.00 $400.00 Paid 03/29/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Passed 3/31/2016 04/20/2016
Informational
04/20/2016
The erosion plan is in place and looks good.
Erosion Control Inspection Partial 5/16/2016 05/16/2016
Erosion Control Inspection Partial 6/14/2016 06/14/2016
PW-Misc
Informational
06/14/2016
Drove by and checked erosion control and talked to Brett and he said probably 3-4 weeks before they can start doing any site work due to the fiber optic lines being in the way.
Erosion Control Inspection Partial 6/21/2016 07/11/2016
PW-Misc
Informational
06/14/2016
Drove by and checked erosion control and talked to Brett and he said probably 3-4 weeks before they can start doing any site work due to the fiber optic lines being in the way.
PW-Misc
Informational
07/11/2016
Checked on erosion control , everything is looking good. They still have not started on any of the site work yet.Steve Robbins 07/11/2016 9:09 AM
Erosion Control Inspection Passed 5/17/2016 07/26/2016
PW-Erosion and Sediment Control
Corrective Action Required
05/17/2016
Drove back by the job site again today and everything looked good.Steve Robbins 05/17/2016 1:47 PM
Erosion Control Inspection Passed 7/15/2016 07/26/2016
PW-Misc
Informational
07/11/2016
Drove by and checked erosion control and talked to Brett and he said probably 3-4 weeks before they can start doing any site work due to the fiber optic lines being in the way.
PW-Misc
Informational
07/26/2016
Made a visit and talked to Brent, He said they are still at least a couple of weeks out before they can begin doing site work because of the fiber optic lines. Steve Robbins 07/26/2016 3:06 PM There was no issues with erosion control.
PW-Misc
Informational
07/11/2016
Checked on erosion control , everything is looking good. They still have not started on any of the site work yet.Steve Robbins 07/11/2016 9:09 AM
Fire Line Construction Inspection Passed 8/10/2016 08/10/2016
PW-Misc
Informational
08/10/2016
Inspected the fire line coming out of the building. All thrust blocks and restraining joints were in place. Glen Martin will now be taking this project over for the remainder of it.Steve Robbins 08/10/2016 1:34 PM
Proof roll parking lot Partial 4/10/2017 04/10/2017
Informational
04/10/2017
Today they were startin to grade out the parking lot, and moving dirt.Steve Robbins 04/10/2017 4:02 PM
Pavement-Stabilized Subgrade Partial 4/24/2017 04/27/2017
PW-Misc
Informational
04/27/2017
They have put down rock for the curbs on the north side of the building.Steve Robbins 04/27/2017 7:59 AM
Driveway Inspection Partial 4/25/2017 04/27/2017
PW-Misc
Informational
04/27/2017
The approach has the curbs installed on the north side. The rock has been installed and has been compacted.Steve Robbins 04/27/2017 8:18 AM
Driveway Inspection Partial 4/28/2017 04/28/2017
PW-Misc
Informational
04/27/2017
The approach has the curbs installed on the north side. The rock has been installed and has been compacted.Steve Robbins 04/27/2017 8:18 AM
PW-Misc
Informational
04/28/2017
The approach on the north side has been poured with 8" of kcmmb mix and has passed. I will wait to give a pass until the south side has been completed.Steve Robbins 04/28/2017 2:47 PM
Pavement-Stabilized Subgrade Partial 5/2/2017 05/02/2017
PW-Misc
Informational
04/27/2017
They have put down rock for the curbs on the north side of the building.Steve Robbins 04/27/2017 7:59 AM
PW-Misc
Informational
05/02/2017
The subgrade is still very wet from the rain, so they are not working in the parking lot today.Steve Robbins 05/02/2017 12:33 PM
Pavement-Stabilized Subgrade Partial 5/10/2017 05/10/2017
PW-Misc
Informational
05/02/2017
They have put down rock for the curbs on the north side of the building.Steve Robbins 04/27/2017 7:59 AM
PW-Misc
Informational
05/02/2017
The subgrade is still very wet from the rain, so they are not working in the parking lot today.Steve Robbins 05/02/2017 12:33 PM
PW-Misc
Informational
05/10/2017
Today they installed geo-grid and type 3 rock on the west side of the parking lot.Steve Robbins 05/10/2017 4:01 PM
Proof roll parking lot Partial 5/12/2017 05/15/2017
Informational
05/15/2017
On friday we did a proofroll on the north side of the parking lot. The special inspector was also there and it passed. We had a truck with 18 tons .Steve Robbins 05/15/2017 7:41 AM
Pavement-Surface Partial 5/15/2017 05/15/2017
PW-Misc
Informational
05/15/2017
The 4" of base rock was installed today on the north end of the parking lot. They will start on the base and curbs soon.Steve Robbins 05/15/2017 12:07 PM
Street - Surface Course Partial 5/16/2017 05/16/2017
PW-Misc
Informational
05/16/2017
The surface was laid this morning over the base that was installed yesterday. The main road going around the building did not have surface installed, just the parking spaces on the north side of the building.Steve Robbins 05/16/2017 4:00 PM
Commercial Curb Inspection Partial 5/24/2017 05/24/2017
Informational
05/24/2017
The curbs have all been installed on the south side of the building and now they have them installed on the back side coming around to the north side. Today they were grading and putting in rock getting ready for more curbs to be installed.Steve Robbins 05/24/2017 2:01 PM
Commercial Curb Inspection Partial 5/25/2017 05/25/2017
Informational
05/25/2017
They are getting ready to put more curb in, we are allowing them to put it on rock, and then geo-grid after the curbs. They just did grading today.Steve Robbins 05/25/2017 3:33 PM
Commercial Curb Inspection Partial 5/31/2017 06/02/2017
Informational
06/02/2017
The curbs have been installed on both sides of the building, they still have curbs to install for the front of the building and the other approach.Steve Robbins 06/02/2017 2:37 PM
Commercial Curb Inspection Partial 6/8/2017 06/08/2017
Informational
06/08/2017
All the curbs on the east side of the building has been installed and now they are working on installing the rock and geo-grid.Steve Robbins 06/08/2017 3:57 PM
Pavement-Stabilized Subgrade Partial 6/7/2017 06/12/2017
PW-Misc
Informational
05/10/2017
They have put down rock for the curbs on the north side of the building.Steve Robbins 04/27/2017 7:59 AM
PW-Misc
Informational
05/10/2017
The subgrade is still very wet from the rain, so they are not working in the parking lot today.Steve Robbins 05/02/2017 12:33 PM
PW-Misc
Informational
05/10/2017
Today they installed geo-grid and type 3 rock on the west side of the parking lot.Steve Robbins 05/10/2017 4:01 PM
Informational
06/12/2017
Steve Robbins 06/12/2017 3:59 PMThe geo-grid and rock has been installed the east side of the parking lot and they are getting ready for ashphalt and proofroll.
Pavement-Surface Partial 6/12/2017 06/13/2017
PW-Misc
Informational
05/15/2017
The 4" of base rock was installed today on the north end of the parking lot. They will start on the base and curbs soon.Steve Robbins 05/15/2017 12:07 PM
PW-Misc
Informational
06/13/2017
They have installed base asphalt around the back side of the building and part of the other side of the parking lot. They will continue today.Steve Robbins 06/13/2017 7:10 AM
Proof roll parking lot Partial 6/12/2017 06/13/2017
Informational
06/13/2017
We did a proofroll on the back side of the building and on the other parking lot on 6/12/17.Steve Robbins 06/13/2017 7:13 AM
Commercial Curb Inspection Partial 6/12/2017 06/14/2017
Informational
06/14/2017
They are preparing to install more curbs in the remaining portion of the parking lot.Steve Robbins 06/14/2017 3:32 PM
Commercial Curb Inspection Passed 6/16/2017 06/16/2017
Informational
06/16/2017
The curbs in front of the building have been installed, this now completes all the curbs for this parking lot.Steve Robbins 06/16/2017 2:16 PM
Pavement-Surface Partial 6/14/2017 06/16/2017
PW-Misc
Informational
06/13/2017
The 4" of base rock was installed today on the north end of the parking lot. They will start on the base and curbs soon.Steve Robbins 05/15/2017 12:07 PM
PW-Misc
Informational
06/13/2017
They have installed base asphalt around the back side of the building and part of the other side of the parking lot. They will continue today.Steve Robbins 06/13/2017 7:10 AM
PW-Misc
Informational
06/16/2017
The base asphalt has been installed on both sides of the parking lot. We still have base to install on the front side.Steve Robbins 06/16/2017 2:40 PM
Driveway Inspection Passed 6/21/2017 06/22/2017
PW-Misc
Informational
04/28/2017
The approach has the curbs installed on the north side. The rock has been installed and has been compacted.Steve Robbins 04/27/2017 8:18 AM
PW-Misc
Informational
04/28/2017
The approach on the north side has been poured with 8" of kcmmb mix and has passed. I will wait to give a pass until the south side has been completed.Steve Robbins 04/28/2017 2:47 PM
PW-Misc
Informational
06/22/2017
The two approaches for this project has been installed, the rock was compacted and it has been formed. 8" of kcmmb granite was poured. The 2 % slope for the sidewalk going through the approach has also been met.Steve Robbins 06/22/2017 11:47 AM
Pavement-Stabilized Subgrade Passed 6/20/2017 06/22/2017
PW-Misc
Informational
06/12/2017
They have put down rock for the curbs on the north side of the building.Steve Robbins 04/27/2017 7:59 AM
PW-Misc
Informational
06/12/2017
The subgrade is still very wet from the rain, so they are not working in the parking lot today.Steve Robbins 05/02/2017 12:33 PM
PW-Misc
Informational
06/22/2017
Today and yesterday they have installed the geo-grid and rock for the last portion of the parking lot. All the curbs have been installed and we will be doing a proofroll in the morning.Steve Robbins 06/22/2017 2:41 PM
Proof roll parking lot Passed 6/23/2017 06/27/2017
Informational
06/27/2017
We did the final proofroll for the parking lot on the last section, the entire parking lot has now been proof rolled.Steve Robbins 06/27/2017 7:38 AM
Street - Surface Course Partial 6/27/2017 06/27/2017
PW-Misc
Informational
05/16/2017
The surface was laid this morning over the base that was installed yesterday. The main road going around the building did not have surface installed, just the parking spaces on the north side of the building.Steve Robbins 05/16/2017 4:00 PM
PW-Misc
Informational
06/27/2017
Today they are installing surface on the west side of the building in the parking lot and behind the building. They still have base to installed in front of the building.Steve Robbins 06/27/2017 1:34 PM
Pavement-Surface Partial 6/29/2017 07/03/2017
PW-Misc
Informational
06/16/2017
The 4" of base rock was installed today on the north end of the parking lot. They will start on the base and curbs soon.Steve Robbins 05/15/2017 12:07 PM
PW-Misc
Informational
06/16/2017
They have installed base asphalt around the back side of the building and part of the other side of the parking lot. They will continue today.Steve Robbins 06/13/2017 7:10 AM
PW-Misc
Informational
06/16/2017
The base asphalt has been installed on both sides of the parking lot. We still have base to install on the front side.Steve Robbins 06/16/2017 2:40 PM
PW-Misc
Corrective Action Required
07/03/2017
All the base asphalt for this parking lot has been installed except for the portion in front of the building. We have done a proofroll for that portion and are waiting for the aphalt company.Steve Robbins 07/03/2017 10:56 AM
Pavement-Surface Passed 7/7/2017 07/07/2017
PW-Misc
Informational
07/03/2017
The 4" of base rock was installed today on the north end of the parking lot. They will start on the base and curbs soon.Steve Robbins 05/15/2017 12:07 PM
PW-Misc
Informational
07/03/2017
They have installed base asphalt around the back side of the building and part of the other side of the parking lot. They will continue today.Steve Robbins 06/13/2017 7:10 AM
PW-Misc
Informational
07/03/2017
The base asphalt has been installed on both sides of the parking lot. We still have base to install on the front side.Steve Robbins 06/16/2017 2:40 PM
PW-Misc
Corrective Action Required
07/03/2017
All the base asphalt for this parking lot has been installed except for the portion in front of the building. We have done a proofroll for that portion and are waiting for the aphalt company.Steve Robbins 07/03/2017 10:56 AM
PW-Misc
Informational
07/07/2017
Today they are installing the remainding base asphalt in front of the building. They are now finished with all the base asphalt in the parking lot. On Monday they will be finishing the surface.Steve Robbins 07/07/2017 3:58 PM
Street - Surface Course Passed 7/10/2017 07/10/2017
PW-Misc
Informational
06/27/2017
The surface was laid this morning over the base that was installed yesterday. The main road going around the building did not have surface installed, just the parking spaces on the north side of the building.Steve Robbins 05/16/2017 4:00 PM
PW-Misc
Informational
06/27/2017
Today they are installing surface on the west side of the building in the parking lot and behind the building. They still have base to installed in front of the building.Steve Robbins 06/27/2017 1:34 PM
PW-Misc
Informational
07/10/2017
The last section of surface has been installed in the parking lot. This now completeds all the paving in the parking lot. The base and surface asphalt has all been installed.Steve Robbins 07/10/2017 2:27 PM
Sanitary Sewer - Invert Passed 7/8/2017 07/24/2017
Sanitary Sewer Construction Inspection Passed 7/24/2017 07/24/2017
Water Line - Hydrostatic Test Passed 7/24/2017 07/24/2017
PW-Misc
Informational
07/24/2017
These tests were taken by Glenn Martin.Steve Robbins 07/24/2017 1:28 PM
Water Line - Coliform Test 1 Passed 7/24/2017 07/24/2017
Water Line - Coliform Test 2 Passed 7/24/2017 07/24/2017
Water Line - Valve Passed 7/24/2017 07/24/2017
Water Line - Fire Hydrant Passed 7/24/2017 07/24/2017
Water Line - Thrust Restraint Passed 7/24/2017 07/24/2017
Water Line - Construction Taps Removed Passed 7/24/2017 07/24/2017
Water Line - Construction Inspection Passed 7/24/2017 07/24/2017
Storm - Pipe Passed 07/24/2017
Storm - Inlets Clean Passed 07/24/2017
Storm - Swales Passed 07/24/2017
Grading/Excavation/Fill Inspection Passed 7/25/2017 07/25/2017
Erosion Control Inspection Partial 8/7/2017 08/07/2017
PW-Misc
Informational
08/07/2017
After the big rain on saturday night the silt fence is still up and seems to have done its job. On Innovation dr. there is some silt on the the sidewalk that came through the silt fence, I talked with the contractor and they will get the silt cleaned up on the sidewalk.Steve Robbins 08/07/2017 8:26 AM
Erosion Control Inspection Passed 8/9/2017 08/14/2017
PW-Misc
Informational
08/07/2017
After the big rain on saturday night the silt fence is still up and seems to have done its job. On Innovation dr. there is some silt on the the sidewalk that came through the silt fence, I talked with the contractor and they will get the silt cleaned up on the sidewalk.Steve Robbins 08/07/2017 8:26 AM
PW-Misc
Informational
08/14/2017
Steve Robbins 08/14/2017 3:51 PMThe erosion control is in place and functioning properly.
ESC - (Vegetation/Ground Cover) Partial 8/21/2017 at 9:00 AM 08/21/2017
PW-Misc
Informational
08/21/2017
The sod has been installed , but they do not have seed and straw yet for the areas that did not get sod.
ESC - (Vegetation/Ground Cover) Partial 9/6/2017 at 11:30 AM 09/06/2017
PW-Misc
Informational
08/21/2017
The sod has been installed , but they do not have seed and straw yet for the areas that did not get sod.
PW-Misc
Informational
09/06/2017
The contractors are finishing the grading and also installing trees and shrubs today. They still have some more sod to install and then they will install the seed.
ESC - (Vegetation/Ground Cover) Partial 9/20/2017 at 2:00 PM 09/20/2017
PW-Misc
Informational
09/06/2017
The sod has been installed , but they do not have seed and straw yet for the areas that did not get sod.
PW-Misc
Informational
09/06/2017
The contractors are finishing the grading and also installing trees and shrubs today. They still have some more sod to install and then they will install the seed.
PW-Misc
Informational
09/20/2017
All the sod has been installed and all the seed and straw has been installed on the north side and 3/4 of the south side of the building.Steve Robbins 09/20/2017 2:16 PM
ESC - (Vegetation/Ground Cover) Partial 10/3/2017 at 2:00 PM 10/03/2017
PW-Misc
Informational
09/20/2017
The sod has been installed , but they do not have seed and straw yet for the areas that did not get sod.
PW-Misc
Informational
09/20/2017
The contractors are finishing the grading and also installing trees and shrubs today. They still have some more sod to install and then they will install the seed.
PW-Misc
Informational
09/20/2017
All the sod has been installed and all the seed and straw has been installed on the north side and 3/4 of the south side of the building.Steve Robbins 09/20/2017 2:16 PM
PW-Misc
Informational
10/03/2017
All the tree's and landscaping have been installed. All the sod has been installed and all the seed and straw has been installed. When it all comes in at 70% I can issue Final Completion.Steve Robbins 10/03/2017 2:48 PM
ESC - (Vegetation/Ground Cover) Passed 10/26/2017 at 7:00 AM 10/26/2017
PW-Misc
Informational
10/03/2017
The sod has been installed , but they do not have seed and straw yet for the areas that did not get sod.
PW-Misc
Informational
10/03/2017
The contractors are finishing the grading and also installing trees and shrubs today. They still have some more sod to install and then they will install the seed.
PW-Misc
Informational
10/03/2017
All the sod has been installed and all the seed and straw has been installed on the north side and 3/4 of the south side of the building.Steve Robbins 09/20/2017 2:16 PM
PW-Misc
Informational
10/03/2017
All the tree's and landscaping have been installed. All the sod has been installed and all the seed and straw has been installed. When it all comes in at 70% I can issue Final Completion.Steve Robbins 10/03/2017 2:48 PM
Informational
10/26/2017
Steve Robbins 10/26/2017 7:06 AMThe vegetation has been established.
Documents & Images
Date Uploaded File Type Document Name
03/29/2016 Receipt Receipt for transaction: 2016-000896
03/31/2016 Letter PW-Permit
04/20/2016 Letter PW-Daily Inspection Summary
05/16/2016 Letter PW-Daily Inspection Summary
05/17/2016 Letter PW-Daily Inspection Summary
06/14/2016 Letter PW-Daily Inspection Summary
07/11/2016 Letter PW-Daily Inspection Summary
07/26/2016 Letter PW-Daily Inspection Summary
08/10/2016 Letter PW-Daily Inspection Summary
04/10/2017 Letter PW-Daily Inspection Summary
04/27/2017 Letter PW-Daily Inspection Summary
04/27/2017 Letter PW-Daily Inspection Summary
05/02/2017 Letter PW-Daily Inspection Summary
05/10/2017 Letter PW-Daily Inspection Summary
05/15/2017 Letter PW-Daily Inspection Summary
05/15/2017 Letter PW-Daily Inspection Summary
05/16/2017 Letter PW-Daily Inspection Summary
05/24/2017 Letter PW-Daily Inspection Summary
05/25/2017 Letter PW-Daily Inspection Summary
06/02/2017 Letter PW-Daily Inspection Summary
06/08/2017 Letter PW-Daily Inspection Summary
06/12/2017 Letter PW-Daily Inspection Summary
06/13/2017 Letter PW-Daily Inspection Summary
06/13/2017 Letter PW-Daily Inspection Summary
06/14/2017 Letter PW-Daily Inspection Summary
06/16/2017 Letter PW-Daily Inspection Summary
06/16/2017 Letter PW-Daily Inspection Summary
06/22/2017 Letter PW-Daily Inspection Summary
06/22/2017 Letter PW-Daily Inspection Summary
06/27/2017 Letter PW-Daily Inspection Summary
06/27/2017 Letter PW-Daily Inspection Summary
07/03/2017 Letter PW-Daily Inspection Summary
07/07/2017 Letter PW-Daily Inspection Summary
07/10/2017 Letter PW-Daily Inspection Summary
07/24/2017 Letter PW-Daily Inspection Summary
07/25/2017 Letter PW-Certificate of Substantial Completion Multiple Lot
07/25/2017 Letter PW-Punch List
07/26/2017 Innovation Campus substantial and punch
08/07/2017 Letter PW-Daily Inspection Summary
08/14/2017 Letter PW-Daily Inspection Summary
08/21/2017 Letter PW-Daily Inspection Summary
09/06/2017 Letter DE-Daily Inspection Summary
09/20/2017 Letter DE-Daily Inspection Summary
10/03/2017 Letter DE-Daily Inspection Summary
10/26/2017 Letter DE-Daily Inspection Summary
10/26/2017 Letter DE-Certificate of Final Acceptance (Commercial)
10/26/2017 DOC102617-10262017074042
10/26/2017 Letter DE-Certificate of Final Acceptance (Commercial)
10/26/2017 DOC102617-10262017075956
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home