Summary
PRPWFC20131058
Public Works Infrastructure Permit - Commercial
Final Acceptance
DACUR INVESTMENT COMPANY INC
DEVELOPMENT COMPLETE
Freddy's Frozen Custard and Steakburgers
05/29/2013
06/11/2014
Locations
Contacts
ACCEL CONSTRUCTION LLC, Address:4015 N. WOODLAWN CT, SUITE 1, Phone:(316) 866-2885  
BRR ARCHITECTURE, Address:6700 ANTIOCH PLAZA SUITE 300, Phone:(913) 236-3385  
PHELPS ENGINEERING, INC, Address:1270 N WINCHESTER RD, Phone:(913) 393-1155  
DACUR INVESTMENT COMPANY INC, Address:2700 KENDALLWOOD PKWY # 208  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $126.00 $126.00 Paid 05/29/2013
$126.00
9110068-Storm Fee $234.00 $234.00 Paid 05/29/2013
$234.00
9110081-Paved Surface Inspection Fee $4,248.45 $4,248.45 Paid 05/29/2013
$4,248.45
9110071-Site Grading Fee $784.65 $784.65 Paid 05/29/2013
$784.65
9110072-Water Test Fee $100.00 $100.00 Paid 05/29/2013
$100.00
9110067-Engineering Plan Review & Inspection fee $183.00 $183.00 Paid 10/04/2013
$1.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Passed 11/13/2013 at 1:00 AM 12/13/2013
Sanitary Sewer - Air Test Passed 12/11/2013 at 12:00 AM 12/13/2013
Sanitary Sewer - Mandrel Passed 12/11/2013 at 12:00 AM 12/13/2013
Sanitary Sewer - Vacuum Passed 12/11/2013 at 12:00 AM 12/13/2013
Sanitary Sewer - Invert Passed 12/3/2013 at 12:00 AM 12/13/2013
Fire Line - Flush Passed 12/3/2013 at 12:00 AM 12/13/2013
Water Line - Construction Inspection Passed 11/29/2013 at 12:00 AM 12/13/2013
Fire Line - Hydrostatic Test Passed 12/3/2013 at 12:00 AM 12/13/2013
Storm Sewer Construction Inspection Passed 11/20/2013 at 12:00 AM 12/13/2013
Erosion Control Inspection Passed 01/13/2014
PW-Erosion and Sediment Control
Corrective Action Required
01/08/2014
EROSION looks good no issues Bart Reese 01/08/2014 8:11 AM Enforcement of Erosion and Sediment Control: 1. The Department of Public Works and the Department of Codes Administration shall handle erosion control enforcement through the normal routine activities that include inspecting the site, communicating with the contractor, developer, or owner, and issuing written warnings to the contractor, developer, or owner to resolve issues of non-compliance. If erosion control measures are determined to be deficient, Director of the Department of Public Works or the Director of Codes Administration (hereafter "Director") or his designee may immediately discontinue all inspections for the site. 2. In addition to immediately discontinuing all inspections for the site, upon the Directors or his designees determination that erosion control measures are deficient, but not hazardous, the Director shall notify the contractor, developer, or owner to take remedial action to correct the deficiencies within two regular business days, the Director or his designee may: a. issue a Stop Work Order for the site; b. Suspend the Land Disturbance Permit(s); c. Remedy the deficiencies and bill the contractor, developer, or owner for the actual and administrative costs. If the contractor, developer, or owner fails to reimburse the City for correcting the deficiencies, the Director or his designee may withhold certificate(s) of occupancy, including temporary certificate(s) of occupancy, for all contractor, developer, or owners properties; and/or d. Refer the case to the Law Department for prosecution 3. If erosion attributable to deficient erosion control measures poses an immediate danger to life or property, or substantial flood or fire hazards, the Director or his designee shall cause the City to immediately abate the hazardous condition. The contractor, developer, or owner shall pay all actual and administrative cost incurred by the City in correcting the hazardous condition within ten days. If the contractor, developer, or owner fails to pay the City for correcting the hazardous condition, the Director may take any or all of the actions listed above. 4. Conviction of any violation enumerated in this section shall be punished by a fine as set forth in the following minimum punishment schedule, but not more than $500, or imprisonment of not more than 90 days, or by both such fine and imprisonment. a. First conviction: a fine of not less than $100 and more than $500; imprisonment for not more than 90 days may also be adjudged. b. Second conviction: a fine of not less than $250 and not more than $500; imprisonment for not more than 90 days may also be adjudged. c. Third conviction: a fine of $500; imprisonment for not more than 90 days may also be adjudged. d. Fourth and subsequent convictions: a fine of $500 and imprisonment for not less than ten days and not more than 90 days. For purposes of this section, only convictions within the prior three years before the date of the offense shall be considered.
Grading/Excavation/Fill Inspection Passed 01/13/2014
Backflow Preventer and Vault Passed 01/13/2014
Storm - Inlets Clean Passed 01/13/2014
Storm - Pipe Passed 01/13/2014
Storm - Outlet Structure Passed 01/13/2014
Pavement-Proof Roll Passed 01/13/2014
Curb - Proof Roll Passed 01/13/2014
Street - Surface Course Passed 01/13/2014
Curb - Compression Strength Passed 01/13/2014
ESC - (Vegetation/Ground Cover) Passed/Re-Inspect 01/13/2014
ESC - (Vegetation/Ground Cover) Passed 04/02/2014
Documents & Images
Date Uploaded File Type Document Name
05/29/2013 Letter PW-Permit
04/02/2014 Letter PW-Punch List
04/21/2014 Letter PW- Substantial
06/11/2014 Letter PW-Final Acceptance Commercial
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home