Permit Application Status

PRCOM20260909


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20260909
Building Permit - Commercial
In Plan Review
BANK OF AMERICA
NEW COMMERCIAL
BANK OF AMERICA - NEW BANK WITH 2 DRIVE UP ATMS REPLACING OLDER BANK
03/05/2026
09/20/2026
Locations
Contacts
BANK OF AMERICA, Address:PO BOX 32547  
  
  
  
  
  
Interior Architects, Address:401 Union Street, Suite 300, Phone:(206) 773-2718  
Milrose Consultants, Address:222 S. Riverside Plaza, 15th Floor, Phone:(213) 999-1637  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Rejected 03/24/2026 03/23/2026
Craig Hill
Misc
Corrective Action Required
03/23/2026

1008.3.2 Buildings. In the event of power supply failure, in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge Action Required: Provide emergency exterior illumination at all marked EXITs
Building Plan Review Rejected 03/24/2026 03/23/2026
Joe Frogge
Final Development Plan
Corrective Action Required
03/23/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
03/23/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. Fee will be $23,743.50.
IBC 1209.2 Finish materials
Corrective Action Required
03/23/2026

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish material at mop sink. If paint is used it must be epoxy based.
IBC 1809.5 Frost protection - foundation
Corrective Action Required
03/23/2026

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Minimum frost depth is 36". Update Foundations note #3 on sheet S00.01.
IPC 604.8 Water pressure reducing valve
Corrective Action Required
03/23/2026

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
IPC 608.1 Backflow
Corrective Action Required
03/23/2026

2018 IPC 608.1 General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonpotable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.17.10. Action required: Provide backflow device at water entry.
IBC 1008.3 Emergency power for illumination - at exit discharge
Corrective Action Required
03/23/2026

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior landing of both exits.
Licensed Contractors Rejected 03/24/2026 03/23/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
03/23/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
03/23/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Final Development Plan Review Pending 04/07/2026
Scott Ready
Bank of America
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
03/05/2026 Application Form APPLICATION
03/06/2026 Plans 2026_03_04_MO8-306_Chipman_Permit Set
03/06/2026 Engineer Report/Study 2026_03_02_MO8-306_Chipman Road_GU_Struct Calcs
03/06/2026 Specifications 2026_03_04_MO8-306 Chipman_Proj Manual
03/06/2026 Engineer Report/Study 02255206_BoA Chipman Road (MO8-306)_Geotechnical Engineering Report
03/23/2026 Letter License Tax Bill
03/24/2026 Letter DS P/R Corrections Document
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home