Permit Application Status

PRCOM20255585


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20255585
Building Permit - Commercial
In Plan Review
NEW COMMERCIAL
VALVOLINE - NEW BUILDING FOR AUTO SERVICE AND TWO-BAY GARAGE
12/23/2025
08/02/2026
Locations
Contacts
BCCM Construction Group, Inc., Address:100 E. 7th St. Suite 201, Phone:(816) 659-9115 Ext:210  
HFA-AE, LTD, Address:1705 S WALTON BLVD, SUITE 3, Phone:(479) 360-6284  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
BENCHMARK MECHANICAL LLC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
Guthrie Gerstner - BCCM Construction, Phone:(417) 291-3598  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 02/19/2026 03/18/2026
Joe Frogge
Final Development Plan
Resolved
03/18/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 1/29/2026 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
02/11/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,649.50 1/29/2026 - Acknowledged in letter.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
02/11/2026

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected. See restroom and drinking fountain. 1/29/2026 - Unable to determine at drinking fountain. To be field verified.
Final Development Plan Review Approved 03/09/2026 03/09/2026
Daniel Fernandez
Licensed Contractors Rejected 02/19/2026 02/18/2026
Joe Frogge
LC - General Contractor
Resolved
03/18/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 1/29/2026 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
02/11/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/29/2026 - Acknowledged in letter.
Fire Plan Review Approved 02/19/2026 02/18/2026
Craig Hill
Misc
Corrective Action Required
02/11/2026

2311.4.3 Ventilation. Where Class I liquids or LP-gas are stored or used within a building having a basement or pit wherein flammable vapors could accumulate, the basement or pit shall be provided with mechanical ventilation in accordance with the International Mechanical Code, at a minimum rate of 1 1/2 cubic feet per minute per square foot (cfm/ft2) [0.008 m3/(s  m2)] to prevent the accumulation of flammable vapors. Action Required: With the storage of a class IA liquid provide ventelation for the building.
Fire Plan Review Rejected 02/02/2026 02/02/2026
Craig Hill
Misc
Corrective Action Required
01/26/2026

2311.4.3 Ventilation. Where Class I liquids or LP-gas are stored or used within a building having a basement or pit wherein flammable vapors could accumulate, the basement or pit shall be provided with mechanical ventilation in accordance with the International Mechanical Code, at a minimum rate of 1 1/2 cubic feet per minute per square foot (cfm/ft2) [0.008 m3/(s  m2)] to prevent the accumulation of flammable vapors. Action Required: With the storage of a class IA liquid provide ventelation for the building.
Building Plan Review Rejected 02/02/2026 01/29/2026
Joe Frogge
Final Development Plan
Corrective Action Required
01/26/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 1/29/2026 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
01/26/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,649.50 1/29/2026 - Acknowledged in letter.
Misc
Resolved
01/29/2026

Application incomplete. Action required: Fill out and submit 2nd half of application form.
IBC 1209.2 Finish materials
Resolved
01/29/2026

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material in restroom. If paint is used it must be epoxy based.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
01/26/2026

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected. See restroom and drinking fountain. 1/29/2026 - Unable to determine at drinking fountain. To be field verified.
Licensed Contractors Rejected 02/02/2026 01/29/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
01/26/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 1/29/2026 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
01/26/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/29/2026 - Acknowledged in letter.
Fire Plan Review Rejected 01/09/2026 01/13/2026
Craig Hill
Misc
Corrective Action Required
01/13/2026

2311.4.3 Ventilation. Where Class I liquids or LP-gas are stored or used within a building having a basement or pit wherein flammable vapors could accumulate, the basement or pit shall be provided with mechanical ventilation in accordance with the International Mechanical Code, at a minimum rate of 1 1/2 cubic feet per minute per square foot (cfm/ft2) [0.008 m3/(s  m2)] to prevent the accumulation of flammable vapors. Action Required: Provide verification on types of liquids being used and stored in the pit.
Building Plan Review Rejected 01/09/2026 01/09/2026
Joe Frogge
Final Development Plan
Corrective Action Required
01/09/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
01/09/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,649.50
Misc
Corrective Action Required
01/09/2026

Application incomplete. Action required: Fill out and submit 2nd half of application form.
IBC 1209.2 Finish materials
Corrective Action Required
01/09/2026

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material in restroom. If paint is used it must be epoxy based.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
01/09/2026

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected. See restroom and drinking fountain.
Licensed Contractors Rejected 01/09/2026 01/09/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
01/09/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
01/09/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $300.30 $300.30 Paid 03/19/2026
Water Insp Fee $189.00 $189.00 Paid 03/19/2026
Storm Sewer Inspection Fee $439.47 $439.47 Paid 03/19/2026
Paved Surface Inspection Fee $3,887.01 $3,887.01 Paid 03/19/2026
Site Grading Fee $9,250.29 $9,250.29 Paid 03/19/2026
Water Tap Fee $21,760.00 $21,760.00 Paid 03/19/2026
Water Meter Fee $2,225.00 $2,225.00 Paid 03/19/2026
Sanitary Sewer Development Fee $6,403.00 $6,403.00 Paid 03/19/2026
Right of Way Permit Fee $85.00 $85.00 Paid 03/19/2026
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home