Permit Application Status

PRCOM20252929


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20252929
Building Permit - Commercial
In Plan Review
SMITH ANTHONY E & JENNIFER E
NEW COMMERCIAL
HERITAGE ASSET MANAGEMENT - NEW INVESTMENT COMPANY - RESIDENTIAL OCCUPANCY BECOMES COMMERCIAL - INCLUDES EXTERIOR DECK AND SOME SITE WORK
07/09/2025
01/18/2026
Locations
Contacts
SMITH ANTHONY E & JENNIFER E, Address:100 NE DOUGLAS ST  
  
Kevin Hardee - Kevin Hardee Homes, Address:705 SW Admiral Byrd Ct, Phone:(816) 718-7300  
  
  
  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 07/21/2025 07/22/2025
Craig Hill
Building Plan Review Rejected 07/21/2025 07/21/2025
Joe Frogge
Final Development Plan
Corrective Action Required
07/21/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
07/21/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. After credit for previous residence the fee will be $1,914.28
Project cost
Resolved
10/23/2025

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational.
ICC A117.1 604.3.1 Water closet width
Resolved
08/15/2025

ICC A117.1 Section 604.3.1 Clearance Width. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. Action require: Provide minimum 60" behind new water closet.
Licensed Contractors Rejected 07/21/2025 07/21/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
07/21/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
07/21/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Final Development Plan Review Pending 11/07/2025
Grant White
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
07/09/2025 Application Form APPLICATION
07/09/2025 Plans 250709_Heritage Asset Management_Overall Permit Set
07/09/2025 Waiver/Modification Document 241114_Heritage Asset Management_Commercial Code Modification Request_Approved
07/13/2025 Letter License Tax Bill
07/22/2025 Letter DS P/R Corrections Document
08/15/2025 Waiver/Modification Document 250731_100 NE Douglas_Commercial Code Modification Request[1]
08/15/2025 Approved Plans Approved construction plans
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home