Permit Application Status

PRCOM20252654


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20252654
Building Permit - Commercial
In Plan Review
NEW MULTI-FAMILY
ALURA APARTMENTS - BUILDING 3 - NEW APARTMENT BUILDING
06/26/2025
11/30/2025
Locations
Contacts
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Brian Maenner - Intrinsic Development, Address:3622 Endeavor Ave., Ste. 101, Phone:(573) 881-0280  
LGHVAC Mechanical, Address:3616 Utica Square Dr., Phone:(405) 823-6513  
Reks Contractors Inc, Address:2660 Springbluff Ct  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
Wallace Architects LLC, Address:302 Campusview Drive, Suite 208, Phone:(573) 256-7200  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/24/2025 06/23/2025
Joe Frogge
Building Plan Review Rejected 06/24/2025 06/23/2025
Joe Frogge
Misc
Corrective Action Required
06/16/2025

This review covers all permitted structures on site. Individual permits for each structure will be created after plans are approved. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Final Development Plan
Corrective Action Required
06/16/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Misc
Corrective Action Required
06/16/2025

FAA approval required. Action required: Provide verification of FAA 7460 approval. 5/30/2025 - Pending
Health Dept Review (aquatic)
Corrective Action Required
06/16/2025

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 5/30/2025 - Deferred to pool permit.
Health Dept Inspection (aquatic)
Corrective Action Required
06/16/2025

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 5/30/2025 - Deferred to pool permit.
Elevator Equipment Permit
Corrective Action Required
06/16/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
06/16/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
06/16/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 5/30/2025 - Acknowledged in letter.
Project cost
Resolved
06/23/2025

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide cost estimates for each apartment, garage, pool, and pool house. 5/30/2025 - Clarification: We need individual costs for each structure. A spreadsheet can be provided if that helps.
Engineered truss package
Corrective Action Required
06/16/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred. 5/30/2025 - Deferred per request.
Planning - Screening of ground mounted equipment
Corrective Action Required
06/16/2025

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 5/30/2025 - Deferred to FDP. To be field verified.
Misc
Resolved
06/23/2025

2018 IBC 718.4 Draftstopping in attics. Draftstopping shall be installed to subdivide attic spaces where required by Section 708.4.2. In other than Group R, draftstopping shall be installed to subdivide combustible attic spaces and combustible concealed roof spaces such that any horizontal area does not exceed 3,000 square feet (279 m2). Ventilation of concealed roof spaces shall be maintained in accordance with Section 1202.2.1. Exception: Buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1. Action required: Provide draftstopping in attic of Garage 9, Type D. (and adjust attic access accordingly) 6/3/2025 - Garage plans not found in submittal.
IPC 403.1 Minimum number of fixtures
Resolved
06/23/2025

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink and drinking fountain (or approved alternate) in Pool House. 5/30/2025 - Not addressed.
IBC 1209.2 Finish materials
Resolved
06/23/2025

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials in restrooms and at mop sink. If paint is used it must be epoxy based. 5/30/2025 - Restrooms now compliant, but mop sink not found.
Fire Plan Review Approved with Conditions 06/24/2025 06/17/2025
Craig Hill
Construction documents for fire alarm systems
Informational
06/16/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Informational
06/16/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Knox box required
Corrective Action Required
06/16/2025

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action Required: Knox box needed at or near the FDC of all buildings. Confirm on final
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
06/16/2025

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action Required: Elevator Knox Box is required in all buildings near the elevator that will include keys to operate the elevator and an emergency elevator door key. Confirm on final
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
06/26/2025 Approved Plans Approved Bldg 3 construction plans
06/26/2025 Letter 2025-ACE-2303-OE - Alura Building 3 FAA Permit
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home