Permit Application Status

PRCOM20251179


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20251179
Building Permit - Commercial
Issued
DOUGLAS STATION PARTNERS LLC
NEW MULTI-FAMILY
SLOAN APARTMENTS - NEW APARTMENT BUILDING
03/31/2025
10/15/2025
04/06/2025
Locations
Contacts
DOUGLAS STATION PARTNERS LLC, Address:8305 NE 89TH ST  
LEVEL BUILDERS LLC, Address:P O BOX 29145, Phone:(816) 541-4204  
Shane Turnbow - Level Builders, Address:3170 NE Carnegie, Suite 400, Phone:(816) 721-2747  
Polar Aire Heating & Cooling Service, Address:400 S. Kansas Ave, Phone:(913) 782-8238  
M & S ELECTRIC, Address:PO BOX 1147, Phone:(816) 427-5913  
PINNACLE PLUMBING COMPANY LLC, Address:P O BOX 2407, Phone:(913) 375-3783  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 10/29/2024 04/16/2025
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
04/16/2025

This review includes all structures on site. Separate permits will be created for each structure at a later date. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
Final Development Plan
Resolved
03/31/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
11/05/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 10/3/2024 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
04/16/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred per request. 10/3/2024 - Acknowledged in letter.
Health Dept Review (aquatic)
Resolved
03/31/2025

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
Health Dept Inspection (aquatic)
Resolved
03/31/2025

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
04/02/2025

Vertical construction will not be permitted until released by the Fire Department. Paved access and live hydrants must be present adjacent to the structure.
Final Development Plan Review Approved 04/14/2025 04/08/2025
Mike Weisenborn
Fire Plan Review Approved 04/14/2025 04/01/2025
Joe Frogge
Fire Plan Review Approved 10/29/2024 10/29/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
03/24/2025

Hydrants and the base asphalt for the parking lots shall be in place before any vertical combustible construction.
Licensed Contractors Approved 10/29/2024 10/29/2024
Joe Frogge
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $14,953.81 $14,953.81 Paid 04/15/2025
Residential Excise Tax Fee $10,183.68 $10,183.68 Paid 04/15/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Pending
Erosion Control Inspection Pending
Sewer Service Inspection Pending
Water Service Inspection Pending
Gas Piping Inspection - Commercial Pending
Gas Service Inspection - Commercial Pending
Above Ceiling Inspection Pending
Rated Assembly Inspection Pending
THIRD FLOOR
Corrective Action Required
03/13/2026
Complete
SECOND FLOOR
Corrective Action Required
03/13/2026
-Pre rock screw pattern and tape ok RC approved **Screw pattern approved except as noted: Patch broken rock at; 207 -Tape joints and fire caulk sprinkler penetrations at soffits
FIRST FLOOR
Corrective Action Required
03/13/2026
-Pre rock screw pattern ok - RC approved Units only -1st layer at shear walls ok - Rock Screw pattern of units ok except 106 -106 Not complete, re framing closets in living room for ADA
All Rough Inspection - Commercial Pending
FIRST FLOOR
Corrective Action Required
03/19/2026
Units and corridor approved Exterior riser room: -NOT READY; install H2.5s, seal all penetrations, install anchor bolts, secure ledger board per plans, repair overnotched ledger, complete sprinkler line
SECOND FLOOR
Corrective Action Required
03/19/2026
Approved
THIRD FLOOR
Corrective Action Required
03/19/2026
Approved
Electrical Service Inspection Pending
Misc
Corrective Action Required
03/31/2026
-Land all conductors at disconnect -Remove grounding electrodes from sprinkler line
Underslab Electrical Inspection - Commercial Pending 7/15/2025
Footing Inspection - Commercial Failed 6/11/2025 6/11/2025 06/11/2025
Misc
Corrective Action Required
06/11/2025
-Provide min 3" clearance to earth -Remove all loose soil, debris and trash from footing -Complete all corner bars per plan -Post site address
Footing Inspection - Commercial Partial 6/12/2025 6/12/2025 06/12/2025
Misc
Corrective Action Required
06/11/2025
-Post address
Misc
Informational
06/12/2025
Line 2A to 2F approved
Footing Inspection - Commercial Passed 6/13/2025 6/13/2025 06/13/2025
Misc
Resolved
06/13/2025
-Post address
Misc
Resolved
06/13/2025
Line 2A to 2F approved
Underslab Plumbing Inspection - Commercial Partial 7/8/2025 7/8/2025 07/08/2025
Misc
Informational
07/08/2025
Subgrage main trunk line approved
Underslab Plumbing Inspection - Commercial Passed 7/11/2025 7/11/2025 07/11/2025
Misc
Resolved
07/11/2025
Subgrage main trunk line approved
All Rough Inspection - Commercial Partial 02/05/2026
FIRST FLOOR
Corrective Action Required
02/05/2026
-Pre rock behind tubs and showers ok
SECOND FLOOR
Corrective Action Required
02/05/2026
-Pre rock behind tubs and showers ok
THIRD FLOOR
Corrective Action Required
02/05/2026
-Pre rock behind tubs and showers ok
Rated Assembly Inspection Partial 2/13/2026 2/13/2026 02/13/2026
THIRD FLOOR
Corrective Action Required
02/13/2026
Screw pattern at pre rock behind tubs ok
All Rough Inspection - Commercial Partial 2/13/2026 2/13/2026 02/13/2026
FIRST FLOOR
Corrective Action Required
02/05/2026
-Pre rock behind tubs and showers ok
SECOND FLOOR
Corrective Action Required
02/05/2026
-Pre rock behind tubs and showers ok
THIRD FLOOR
Corrective Action Required
02/05/2026
-Pre rock behind tubs and showers ok -Install H2.5s at breezway beams -Strap top plates lapped less than 4' at end units -Install roof boots -Zip board not approved for fireblocking at 305
All Rough Inspection - Commercial Partial 2/17/2026 2/17/2026 02/17/2026
FIRST FLOOR
Corrective Action Required
02/13/2026
-Pre rock behind tubs and showers ok
SECOND FLOOR
Corrective Action Required
02/13/2026
-Pre rock behind tubs and showers ok
THIRD FLOOR
Corrective Action Required
02/13/2026
Approved
Rated Assembly Inspection Partial 2/17/2026 2/17/2026 02/17/2026
THIRD FLOOR
Corrective Action Required
02/13/2026
Screw pattern at pre rock behind tubs ok RC apporved
Rated Assembly Inspection Partial 2/18/2026 2/18/2026 02/18/2026
THIRD FLOOR
Corrective Action Required
02/17/2026
Screw pattern and tape at pre rock behind tubs ok RC approved
SECOND FLOOR
Corrective Action Required
02/18/2026
-Pre rock screw pattern ok
FIRST FLOOR
Corrective Action Required
02/18/2026
-Pre rock screw pattern ok
All Rough Inspection - Commercial Failed 2/18/2026 2/18/2026 02/18/2026
FIRST FLOOR
Corrective Action Required
02/17/2026
-Pre rock behind tubs and showers ok
SECOND FLOOR
Corrective Action Required
02/17/2026
Throughout: -Install truss bracing at parallel trusses per plan -Install traps for 3rd floor tubs -Seal top plate penetrations at microducts -Seal dead spaces 205-support dryer duct per code 203-Seal vertical draft stop 206-Add stud at overbored stud at party wall 202-Seal draft stop between units 201-Complete electrical, strap top plate at bedroom wall lapped less than 48", protect nm near panel, protect dwv in closet 208-Seal plate penetrations at sprinkler and vent
THIRD FLOOR
Corrective Action Required
02/17/2026
Approved
Rated Assembly Inspection Partial 2/20/2026 2/20/2026 02/20/2026
THIRD FLOOR
Corrective Action Required
02/18/2026
Screw pattern and tape at pre rock behind tubs ok RC approved
SECOND FLOOR
Corrective Action Required
02/18/2026
-Pre rock screw pattern and tape ok
FIRST FLOOR
Corrective Action Required
02/18/2026
-Pre rock screw pattern ok
All Rough Inspection - Commercial Partial 2/20/2026 2/20/2026 02/20/2026
FIRST FLOOR
Corrective Action Required
02/18/2026
-Pre rock behind tubs and showers ok
SECOND FLOOR
Corrective Action Required
02/18/2026
Throughout: -Install traps for 3rd floor tubs
THIRD FLOOR
Corrective Action Required
02/18/2026
Approved
All Rough Inspection - Commercial Failed 2/23/2026 2/23/2026 02/23/2026
FIRST FLOOR
Corrective Action Required
02/20/2026
-Pre rock behind tubs and showers ok 2/23/26-NOT READY. Complete electrical, complete sprinkler, protect DWV
SECOND FLOOR
Corrective Action Required
02/20/2026
Throughout: -Install traps for 3rd floor tubs
THIRD FLOOR
Corrective Action Required
02/20/2026
Approved
Rated Assembly Inspection Partial 2/24/2026 2/24/2026 02/24/2026
THIRD FLOOR
Corrective Action Required
02/20/2026
Screw pattern and tape at pre rock behind tubs ok RC approved
SECOND FLOOR
Corrective Action Required
02/20/2026
-Pre rock screw pattern and tape ok RC approved
FIRST FLOOR
Corrective Action Required
02/20/2026
-Pre rock screw pattern ok
All Rough Inspection - Commercial Failed 2/25/2026 2/25/2026 02/25/2026
FIRST FLOOR
Corrective Action Required
02/23/2026
-Pre rock behind tubs and showers ok **Have engineer provide correction for ladder trusses bored for dwv -Install anchor bolts within 12" of plate breaks 101-strap top plate at sprinkler, seal top plate penetrations and protect pex and dwv 108-Seal top plates and protect dwv 107-Strap top plate at exterior storm line, install bocca plates at dwv 102-Strap top plate at sprinkler 103-Protect dwv, seal draft stop 106-Seal top plate penetrations 104-Add stud at over bore exterior wall
SECOND FLOOR
Corrective Action Required
02/23/2026
Approved
THIRD FLOOR
Corrective Action Required
02/23/2026
Approved
All Rough Inspection - Commercial Partial 2/27/2026 2/27/2026 02/27/2026
FIRST FLOOR
Corrective Action Required
02/25/2026
-Pre rock behind tubs and showers ok **Have engineer provide correction for ladder trusses bored for dwv 101- protect pex and dwv 108-protect dwv 107-Install bocca plates at dwv 103-Protect dwv, seal draft stop
SECOND FLOOR
Corrective Action Required
02/25/2026
Approved
THIRD FLOOR
Corrective Action Required
02/25/2026
Approved
Rated Assembly Inspection Partial 3/4/2026 3/4/2026 03/04/2026
THIRD FLOOR
Corrective Action Required
02/24/2026
Complete
SECOND FLOOR
Corrective Action Required
02/24/2026
-Pre rock screw pattern and tape ok RC approved
FIRST FLOOR
Corrective Action Required
02/24/2026
-Pre rock screw pattern ok
Rated Assembly Inspection Partial 3/5/2026 3/5/2026 03/05/2026
THIRD FLOOR
Corrective Action Required
03/04/2026
Complete
SECOND FLOOR
Corrective Action Required
03/04/2026
-Pre rock screw pattern and tape ok RC approved
FIRST FLOOR
Corrective Action Required
03/04/2026
-Pre rock screw pattern ok - RC approved Units only
Rated Assembly Inspection Partial 3/6/2026 3/6/2026 03/06/2026
THIRD FLOOR
Corrective Action Required
03/05/2026
Complete
SECOND FLOOR
Corrective Action Required
03/05/2026
-Pre rock screw pattern and tape ok RC approved **Screw pattern approved except as noted: Patch broken rock and excessive gaps at; 202, 207, 201, 208
FIRST FLOOR
Corrective Action Required
03/05/2026
-Pre rock screw pattern ok - RC approved Units only
Rated Assembly Inspection Partial 3/9/2026 3/9/2026 03/09/2026
THIRD FLOOR
Corrective Action Required
03/06/2026
Complete
SECOND FLOOR
Corrective Action Required
03/06/2026
-Pre rock screw pattern and tape ok RC approved **Screw pattern approved except as noted: Patch broken rock at; 207 -Tape joints and fire caulk sprinkler penetrations at soffits
FIRST FLOOR
Corrective Action Required
03/06/2026
-Pre rock screw pattern ok - RC approved Units only
Rated Assembly Inspection Partial 3/11/2026 3/11/2026 03/11/2026
THIRD FLOOR
Corrective Action Required
03/09/2026
Complete
SECOND FLOOR
Corrective Action Required
03/09/2026
-Pre rock screw pattern and tape ok RC approved **Screw pattern approved except as noted: Patch broken rock at; 207 -Tape joints and fire caulk sprinkler penetrations at soffits
FIRST FLOOR
Corrective Action Required
03/09/2026
-Pre rock screw pattern ok - RC approved Units only -1st layer at shear walls ok
Rated Assembly Inspection Partial 3/13/2026 3/13/2026 03/13/2026
THIRD FLOOR
Corrective Action Required
03/11/2026
Complete
SECOND FLOOR
Corrective Action Required
03/11/2026
-Pre rock screw pattern and tape ok RC approved **Screw pattern approved except as noted: Patch broken rock at; 207 -Tape joints and fire caulk sprinkler penetrations at soffits
FIRST FLOOR
Corrective Action Required
03/11/2026
-Pre rock screw pattern ok - RC approved Units only -1st layer at shear walls ok - Rock Screw pattern of units ok except 106 -106 Not complete, re framing closets in living room for ADA
All Rough Inspection - Commercial Failed 3/19/2026 3/19/2026 03/19/2026
FIRST FLOOR
Corrective Action Required
02/27/2026
Units and corridor approved Exterior riser room: -NOT READY; install H2.5s, seal all penetrations, install anchor bolts, secure ledger board per plans, repair overnotched ledger, complete sprinkler line
SECOND FLOOR
Corrective Action Required
02/27/2026
Approved
THIRD FLOOR
Corrective Action Required
02/27/2026
Approved
Electrical Service Inspection Failed 3/31/2026 3/31/2026 03/31/2026
Misc
Corrective Action Required
03/31/2026
-Land all conductors at disconnect -Remove grounding electrodes from sprinkler line
Documents & Images
Date Uploaded File Type Document Name
04/15/2025 Receipt Receipt for transaction: 2025-002334
04/16/2025 Letter DS Building Permit
06/11/2025 Letter INSPECTION SUMMARY
10/29/2024 Approved Plans Approved construction plans
06/12/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
07/08/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/13/2026 Letter INSPECTION SUMMARY
02/13/2026 Letter INSPECTION SUMMARY
02/17/2026 Letter INSPECTION SUMMARY
02/17/2026 Letter INSPECTION SUMMARY
02/18/2026 Letter INSPECTION SUMMARY
02/18/2026 Letter INSPECTION SUMMARY
02/20/2026 Letter INSPECTION SUMMARY
02/20/2026 Letter INSPECTION SUMMARY
02/23/2026 Letter INSPECTION SUMMARY
02/24/2026 Letter INSPECTION SUMMARY
02/25/2026 Letter INSPECTION SUMMARY
02/27/2026 Letter INSPECTION SUMMARY
03/04/2026 Letter INSPECTION SUMMARY
03/05/2026 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/09/2026 Letter INSPECTION SUMMARY
03/11/2026 Letter INSPECTION SUMMARY
03/13/2026 Letter INSPECTION SUMMARY
03/13/2026 Letter INSPECTION SUMMARY
03/19/2026 Letter INSPECTION SUMMARY
03/31/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home