Permit Application Status

PRCOM20246112


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20246112
Building Permit - Commercial
In Plan Review
DPLS P1 LLC
NEW MULTI-FAMILY
THE VILLAGE AT DISCOVERY PARK LOT 9 - NEW APARTMENT BUILDING WITH COMMERCIAL WHITE BOX SPACE ON MAIN LEVEL Apartments - VA Pkg Garage - IIA
11/21/2024
06/07/2025
Locations
Contacts
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Earl Peterson - Intrinsic Development, Phone:(573) 970-8867  
  
  
  
ROSEMANN & ASSOCIATES, Address:1526 GRAND BLVD, Phone:(816) 472-1448  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
DPLS P1 LLC, Address:4220 PHILIPS FARM RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 02/21/2025
Joe Frogge
Fire Plan Review Approved 01/23/2025 01/22/2025
Craig Hill
Building Plan Review Rejected 01/23/2025 01/17/2025
Joe Frogge
Final Development Plan
Corrective Action Required
01/15/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. (PL2024211) Action required: Comment is informational. 1/17/2025 - Acknowledged in letter.
IBC 502.1 - Address Identification
Resolved
01/17/2025

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Comment is informational. This building is on Lot 9 and has been assigned the address of xxx NE Alura Way.
License Tax - Payment
Corrective Action Required
01/15/2025

A one-time impact fee in the form of a license tax must be collected before permit can be issued. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $24,186.24 1/17/2025 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
02/19/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 1/17/2025 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
01/15/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 1/17/2025 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
01/15/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 1/17/2025 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
01/15/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 1/17/2025 - Acknowledged in letter.
IBC 1803.1 General - geotech
Resolved
01/17/2025

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Clarify discrepancy. Design criteria on S001 indicate use of piers with allowable subgrade pressure of 6,000psf. Geotech report indicates standard footings with 2,500psf bearing soil.
Miscellaneous Correction
Resolved
01/17/2025

Engineered truss package
Corrective Action Required
01/15/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Trusses deferred per request. 1/17/2025 - Acknowledged in letter.
IBC 1107.6.1.1 Accessible units - accessibility
Resolved
01/17/2025

2018 IBC 1107.6.1.1 Accessible units. Accessible dwelling units and sleeping units shall be provided in accordance with Table 1107.6.1.1. On a multiple-building site, where structures contain more than 50 dwelling units or sleeping units, the number of Accessible units shall be determined per structure. On a multiple-building site, where structures contain 50 or fewer dwelling units or sleeping units, all dwelling units and sleeping units on a site shall be considered to determine the total number of accessible units. Accessible units shall be dispersed among the various classes of units. Action required: Provide additional Type A unit. 57*.02=1.14. We have to round up.
Project cost
Corrective Action Required
01/15/2025

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational. 1/17/2025 - Acknowledged in letter.
Licensed Contractors Rejected 01/23/2025 01/17/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/15/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/17/2025 - Acknowledged in letter.
Final Development Plan Review Approved 12/18/2024 12/18/2024
Daniel Fernandez
Fire Plan Review Rejected 12/09/2024 12/09/2024
Craig Hill
Misc
Corrective Action Required
12/05/2024

Provide 3'-0 clear egress path out of garage on each side of barrier arm out of the parking garage.
Construction documents for fire alarm systems
Corrective Action Required
12/05/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/05/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Miscellaneous Correction
Corrective Action Required
12/05/2024

907.2.10.2 Groups R-2, R-3, R-4 and I-1. Single or multiple-station smoke alarms shall be installed and maintained in Groups R-2, R-3, R-4 and I-1 regardless of occupant load at all of the following locations: 1. On the ceiling or wall outside of each separate sleeping area in the immediate vicinity of bedrooms. 2. In each room used for sleeping purposes. 3. In each story within a dwelling unit, including basements but not including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level. Action Required: Provide smoke alarms in the "Conway" apartments. Smokes are shown in only one room used for sleeping purposes on that floorplan.
Building Plan Review Rejected 12/09/2024 12/06/2024
Joe Frogge
Final Development Plan
Corrective Action Required
12/05/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. (PL2024211) Action required: Comment is informational.
IBC 502.1 - Address Identification
Corrective Action Required
12/05/2024

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Comment is informational. This building is on Lot 9 and has been assigned the address of xxx NE Alura Way.
License Tax - Payment
Corrective Action Required
12/05/2024

A one-time impact fee in the form of a license tax must be collected before permit can be issued. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $24,186.24
IBC 1704.2 Special Inspections
Corrective Action Required
12/05/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
12/05/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
12/05/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
12/05/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
IBC 1803.1 General - geotech
Corrective Action Required
12/05/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Clarify discrepancy. Design criteria on S001 indicate use of piers with allowable subgrade pressure of 6,000psf. Geotech report indicates standard footings with 2,500psf bearing soil.
Miscellaneous Correction
Corrective Action Required
12/05/2024

Engineered truss package
Corrective Action Required
12/05/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Trusses deferred per request.
IBC 1107.6.1.1 Accessible units - accessibility
Corrective Action Required
12/05/2024

2018 IBC 1107.6.1.1 Accessible units. Accessible dwelling units and sleeping units shall be provided in accordance with Table 1107.6.1.1. On a multiple-building site, where structures contain more than 50 dwelling units or sleeping units, the number of Accessible units shall be determined per structure. On a multiple-building site, where structures contain 50 or fewer dwelling units or sleeping units, all dwelling units and sleeping units on a site shall be considered to determine the total number of accessible units. Accessible units shall be dispersed among the various classes of units. Action required: Provide additional Type A unit. 57*.02=1.14. We have to round up.
IMC 306.5 Equipment on roofs
Resolved
12/12/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent ladder at roof hatch. 12/12/24 - not required
Project cost
Corrective Action Required
12/05/2024

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational.
Licensed Contractors Rejected 12/09/2024 12/05/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/05/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
11/27/2024 Specifications 24-1127 Village at Discovery Lot 9B Spec Vol 1
11/27/2024 Specifications 24-1127 Village at Discovery Lot 9B Spec Vol 2
11/27/2024 Plans 24-1127_DPLS-Lot 9B_CITY SUBMITTAL_COMBINED
12/02/2024 Letter License Tax Bill
12/05/2024 Application Form Application
12/09/2024 Letter DS P/R Corrections Document
01/15/2025 Plans 25-0114_DPLS Lot 9B_ADD #1_Combined
01/15/2025 Letter DPLS_Lot9B_narrative_Add #1
01/15/2025 Letter DPLS_Lot 9B_Round 1 Response
02/04/2025 Plans 25-0204_DPLS_Lot9B_Combined Drawings
02/04/2025 Approved Plans Approved Construction Plans
02/19/2025 Letter Initial SI Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home