Permit Application Status

PRCOM20242620


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20242620
Building Permit - Commercial
Final Completion
GALE COMMUNITIES INC
CHANGE OF TENANT
FOUNDATIONAL CONCEPTS - FOUNDATIONAL CONCEPTS - CHANGE OF TENANT FOR PHYSICAL THERAPY - NO CONSTRUCTION
05/22/2024
06/14/2024
12/01/2024
02/20/2025
Locations
Contacts
Foundational Concepts, Address:601 E 63rd St Ste 230, Phone:(816) 569-2802  
Sarah Dominguez, Address:601 E 63rd St, Phone:(816) 569-2802  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
GALE COMMUNITIES INC, Address:400 SW LONGVIEW BLVD STE 105  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 06/13/2024 06/06/2024
Joe Frogge
Portable fire extinguishers - general
Corrective Action Required
06/06/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum 2A,10B,C fire extinguisher. Verified at inspection.
Building Plan Review Approved 06/13/2024 06/06/2024
Joe Frogge
NEC Article 517.13 Grounding of receptacles patient care
Resolved
06/06/2024

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system. (are offices patient care areas?)
Licensed Contractors Approved 06/06/2024 06/06/2024
Joe Frogge
LC - MEP Subs
Resolved
06/06/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 06/04/2024 06/04/2024
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
06/03/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum 2A,10B,C fire extinguisher. Verified at inspection.
Building Plan Review Rejected 06/04/2024 05/30/2024
Joe Frogge
Misc
Resolved
06/05/2024

At least one restroom is required. Is that the room next to front door?
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
05/30/2024

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system. (are offices patient care areas?)
Project cost
Resolved
06/05/2024

The project cost, which is used to establish the permit fee, has not been provided. We need this cost valuation to determine permit fee. FYI - Minimum fee of $50.00 will apply as long as your valuation does not exceed $12,500.00.
Licensed Contractors Rejected 06/04/2024 05/30/2024
Joe Frogge
LC - General Contractor
Resolved
06/05/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: We must sell permit to an entity with a Lee's Summit business license. In this case we can issue the permit to Foundational Concepts, but they must first complete the business license process.
LC - MEP Subs
Corrective Action Required
05/30/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $116.00 $116.00 Paid 06/06/2024
7232302-Commercial License Tax Fee $3,852.75 $3,852.75 Paid 06/04/2024
$3,852.75
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Verify Final Inspection (Final) Complete 11/27/2024 11/27/2024
Occupancy Inspection - Fire Failed 12/10/2024 12/10/2024 12/17/2024
Final Inspection - Commercial Passed 12/10/2024 12/18/2024 02/20/2025
Documents & Images
Date Uploaded File Type Document Name
05/22/2024 Application Form Commercial Permit Application Foundational Concepts
05/22/2024 Drawing Suite 210
06/04/2024 Letter License Tax Bill
06/04/2024 Letter DS P/R Corrections Document
06/06/2024 Approved Plans Approved floor plan
06/06/2024 Receipt Receipt for transaction:2024-004441
11/01/2024 Letter Codes 140 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home