Permit Application Status

PRCOM20242078


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20242078
Building Permit - Commercial
Certificate of Occupancy
NEW TENANT FINISH
BEEM LIGHT SAUNA - TENANT FINISH FOR LIGHT THERAPY SPA
04/25/2024
06/10/2024
11/24/2024
09/10/2024
Locations
Contacts
Construction Resources Group, LLC, Address:2700 Jarboe Street  
Tony Billington - Construction Resources Group, Phone:(913) 257-7260  
KDSM, Inc., Address:1101 Guinotte Avenue  
ELECTRICAL ASSOCIATES LLC, Address:308 W ELM ST, Phone:(913) 825-2537  
PLUMBING PLUS INC, Address:13117 S 71 HWY, Phone:(816) 761-5757  
Bluestone Partners, LLC, Address:4708 N. FM. 2528, Phone:(903) 813-1415  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 06/06/2024 06/10/2024
Joe Frogge
License Tax - Payment
Resolved
06/10/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $1,856.25. 5/23/24 - acknowledged in letter
Code analysis required
Resolved
06/05/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Modify Project Data to show that Construction Type is 5B and that the building is not sprinklered. 5/23/24 - Building is not sprinklered. Remove reference.
Fire Plan Review Approved 06/06/2024 06/08/2024
Jim Eden
Miscellaneous Correction
Resolved
06/08/2024

Provide a Code Analysis for the project.
Miscellaneous Correction
Resolved
06/08/2024

Provide emergency lighting at the west end of the corridor. Emergency lighting only, or move the new exit sign/emergency light combo to the east end of the hallway. Verified at inspection.
Licensed Contractors Approved 06/06/2024 06/03/2024
Joe Frogge
LC - General Contractor
Resolved
06/03/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact which is where inspection reports will be sent. 5/23/24 - acknowledged in letter
LC - MEP Subs
Resolved
06/03/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 5/23/24 - acknowledged in letter
Fire Plan Review Rejected 05/30/2024 05/24/2024
Jim Eden
Miscellaneous Correction
Corrective Action Required
05/22/2024

Provide a Code Analysis for the project.
Miscellaneous Correction
Partial Correction
05/24/2024

Provide emergency lighting at the west end of the corridor. Emergency lighting only, or move the new exit sign/emergency light combo to the east end of the hallway. Verified at inspection.
Miscellaneous Correction
Resolved
05/24/2024

Provide a remote annunciator/reset switch for the duct detector.
Building Plan Review Rejected 05/30/2024 05/23/2024
Joe Frogge
License Tax - Payment
Corrective Action Required
05/22/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $1,856.25. 5/23/24 - acknowledged in letter
Code analysis required
Corrective Action Required
05/22/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Modify Project Data to show that Construction Type is 5B and that the building is not sprinklered. 5/23/24 - Building is not sprinklered. Remove reference.
IBC 1209.2 Finish materials
Resolved
05/23/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant material at restroom 111. If painted it must be epoxy based. (side wall within 24" included in regulation)
Miscellaneous Correction
Resolved
05/23/2024

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. The fire-resistance rating of penetrations and fire-resistant joint systems shall be determined in accordance Sections 714 and 715, respectively. 2018 IBC 703.7 Marking and identification. Where there is an accessible concealed floor, floor-ceiling or attic space, fire walls, fire barriers, fire partitions, smoke barriers and smoke partitions or any other wall required to have protected openings or penetrations shall be effectively and permanently identified with signs or stenciling in the concealed space. Such identification shall: 1. Be located within 15 feet of the end of each wall and at intervals not exceeding 30 feet measured horizontally along the wall or partition. 2. Include lettering not less than 3 inches in height with a minimum 3/8 inch stroke in a contrasting color incorporating the suggested working, “FIRE AND/OR SMOKE BARRIER – PROTECT ALL OPENINGS,” or other wording. Action required: Amend penetration details on A-503. Demising walls are 2 hour rated.
IPC 604.8 Water pressure reducing valve
Resolved
05/23/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 05/30/2024 05/23/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
05/22/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact which is where inspection reports will be sent. 5/23/24 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
05/22/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 5/23/24 - acknowledged in letter
Fire Plan Review Rejected 05/07/2024 05/07/2024
Jim Eden
Miscellaneous Correction
Corrective Action Required
05/07/2024

Provide a Code Analysis for the project.
Miscellaneous Correction
Corrective Action Required
05/07/2024

Provide emergency lighting at the west end of the corridor.
Miscellaneous Correction
Corrective Action Required
05/07/2024

Provide a remote annunciator/reset switch for the duct detector.
Building Plan Review Rejected 05/07/2024 05/02/2024
Joe Frogge
License Tax - Payment
Corrective Action Required
05/02/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $1,856.25.
Code analysis required
Corrective Action Required
05/02/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Modify Project Data to show that Construction Type is 5B and that the building is not sprinklered.
IBC 1209.2 Finish materials
Corrective Action Required
05/02/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant material at restroom 111. If painted it must be epoxy based. (side wall within 24" included in regulation)
Miscellaneous Correction
Corrective Action Required
05/02/2024

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. The fire-resistance rating of penetrations and fire-resistant joint systems shall be determined in accordance Sections 714 and 715, respectively. 2018 IBC 703.7 Marking and identification. Where there is an accessible concealed floor, floor-ceiling or attic space, fire walls, fire barriers, fire partitions, smoke barriers and smoke partitions or any other wall required to have protected openings or penetrations shall be effectively and permanently identified with signs or stenciling in the concealed space. Such identification shall: 1. Be located within 15 feet of the end of each wall and at intervals not exceeding 30 feet measured horizontally along the wall or partition. 2. Include lettering not less than 3 inches in height with a minimum 3/8 inch stroke in a contrasting color incorporating the suggested working, “FIRE AND/OR SMOKE BARRIER – PROTECT ALL OPENINGS,” or other wording. Action required: Amend penetration details on A-503. Demising walls are 2 hour rated.
IPC 604.8 Water pressure reducing valve
Corrective Action Required
05/02/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 05/07/2024 05/02/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
05/02/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
05/02/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $1,239.20 $1,239.20 Paid 06/10/2024
7232302-Commercial License Tax Fee $1,856.25 $1,856.25 Paid 06/06/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 6/21/2024 6/21/2024 06/21/2024
In-wall Inspection Partial 7/10/2024 07/10/2024
Misc
Informational
07/10/2024
-OK to cover exterior lobby wall for hard lid
Above Ceiling Inspection Failed 7/16/2024 07/16/2024
Misc
Corrective Action Required
07/16/2024
7/16/24 -Not ready for above ceiling at this time -Complete all above ceiling MEPs, framing etc.
In-wall Inspection Partial 7/16/2024 07/16/2024
Misc
Informational
07/10/2024
Walls approved for cover except at washer room wet wall -Complete dryer box and vents
In-wall Inspection Failed 7/22/2024 07/22/2024
Misc
Informational
07/16/2024
Walls approved for cover except at washer room wet wall -Secure dryer vent. -Protect dryer vent 2” below framing member
Above Ceiling Inspection Partial 7/22/2024 07/22/2024
Misc
Corrective Action Required
07/16/2024
Partial only *Hard lids at bathrooms approved -Remove j box and land electrical at lobby hard lid
Above Ceiling Inspection Partial 7/23/2024 07/23/2024
Misc
Corrective Action Required
07/22/2024
Partial only *Hard lids approved -REMOVE SCREWS AND SEAL PENETRATIONS IN DRYER DUCT
In-wall Inspection Passed 7/23/2024 07/23/2024
Misc
Resolved
07/23/2024
Walls approved for cover except at washer room wet wall -Secure dryer vent. -Protect dryer vent 2” below framing member
Above Ceiling Inspection Partial 07/23/2024
Misc
Corrective Action Required
07/23/2024
Partial only *Hard lids approved -REMOVE SCREWS AND SEAL PENETRATIONS IN DRYER DUCT -SEAL FIREWALL PENETRATION AT LOBBY
Rated Assembly Inspection Partial 07/29/2024
Misc
Corrective Action Required
07/29/2024
1st layer at walls below ceilng ok for second layer **ABOVE CEILING IN LOBBY NOT COMPLETE, ENSURE ACCESS FOR INSPECTION
Above Ceiling Inspection Partial 07/29/2024
Misc
Corrective Action Required
07/23/2024
Partial only *Hard lids approved -REMOVE SCREWS AND SEAL PENETRATIONS IN DRYER DUCT -SEAL FIREWALL PENETRATION AT LOBBY, PATCH HOLES ABOVE HARD LID IN LOBBY
In-wall Inspection Passed 7/29/2024 07/29/2024
Above Ceiling Inspection Failed 8/30/2024 08/30/2024
Misc
Corrective Action Required
07/29/2024
Partial only *Hard lids approved -REMOVE SCREWS AND SEAL PENETRATIONS IN DRYER DUCT -SEAL FIREWALL PENETRATION AT LOBBY, PATCH HOLES ABOVE HARD LID IN LOBBY 8/30/24 -Complete all MEPs at ACT ceilings
Above Ceiling Inspection Passed 9/4/2024 9/4/2024 09/04/2024
Misc
Resolved
09/04/2024
Partial only *Hard lids approved -REMOVE SCREWS AND SEAL PENETRATIONS IN DRYER DUCT -SEAL FIREWALL PENETRATION AT LOBBY, PATCH HOLES ABOVE HARD LID IN LOBBY 8/30/24 -Complete all MEPs at ACT ceilings
Rated Assembly Inspection Passed 9/10/2024 9/10/2024 09/10/2024
Misc
Resolved
09/10/2024
1st layer at walls below ceilng ok for second layer **ABOVE CEILING IN LOBBY NOT COMPLETE, ENSURE ACCESS FOR INSPECTION
Occupancy Inspection - Fire Passed 9/10/2024 9/10/2024 09/10/2024
Occupancy Inspection - Codes Commercial Full C of O 9/10/2024 9/10/2024 09/10/2024
Documents & Images
Date Uploaded File Type Document Name
04/25/2024 Application Form APPLICATION
04/25/2024 Engineer Report/Study beem - Lees Summit, MO - Signed Comcheck (2024-04-19)
04/25/2024 Plans beem Light Sauna - Lee's Summit, MO_Combined Permit Set_20240424
04/25/2024 Letter License Tax Bill
05/07/2024 Letter DS P/R Corrections Document
05/22/2024 Plans beem Light Sauna - Lee's Summit, MO_Combined Permit Set_20240522
05/28/2024 Letter DS P/R Corrections Document
05/30/2024 Plans beem Light Sauna - Lee's Summit, MO_Arch Permit Set_20240529
06/06/2024 Receipt Receipt for transaction:2024-004447
06/10/2024 Plans beem Light Sauna - Lee's Summit, MO_Combined Permit Set_20240610
06/10/2024 Receipt Receipt for transaction:2024-004534
06/10/2024 Approved Plans Approved construction set
06/10/2024 Letter DS Building Permit
06/21/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/16/2024 Letter INSPECTION SUMMARY
07/16/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter Codes Final Certificate of Occupancy
09/10/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home