Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
12/16/2024
|
12/10/2024
|
|
Craig Hill
|
|
Misc
Corrective Action Required
No sprinkler plans were found to be uploaded to the system.
Provide a single sprinkler head in the sauna. Plans are not required if the sauna is the only construction/modification being made to the space. A letter of acknowledgment will suffice.
|
|
|
Alarm Plan Review
|
Released for Construction
|
12/16/2024
|
12/10/2024
|
|
Craig Hill
|
|
Misc
Corrective Action Required
No alarm plans were found to be uploaded to the system.
Provide a single strobe in the sauna. Plans are not required if the sauna is the only construction/modification being made to the space. A letter of acknowledgment will suffice.
|
|
|
Sprinkler Plan Review
|
Rejected
|
11/29/2024
|
11/26/2024
|
|
Craig Hill
|
|
Misc
Corrective Action Required
No sprinkler plans were found to be uploaded to the system.
Provide a single sprinkler head in the sauna. Plans are not required if the sauna is the only construction/modification being made to the space. A letter of acknowledgment will suffice.
|
|
|
Alarm Plan Review
|
Rejected
|
11/29/2024
|
11/26/2024
|
|
Craig Hill
|
|
Misc
Corrective Action Required
No alarm plans were found to be uploaded to the system.
Provide a single strobe in the sauna. Plans are not required if the sauna is the only construction/modification being made to the space. A letter of acknowledgment will suffice.
|
|
|
Building Plan Review
|
Approved
|
09/27/2024
|
09/20/2024
|
|
Joe Frogge
|
|
IBC 1103.1 Where required - accessibility
2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities.
2003 ICC/ANSI A117.1 Turning Space. A turning space complying with Section 304 shall be provided within saunas and steam rooms.
Actions required:
- (turning radius compliant)
- Provide verification that door pull is compliant with ADA regulations.
9/16/2024 - not addressed.
|
|
IMC 306.2 Appliances in rooms
2018 IMC Section 914 Sauna Heaters.
Provide verification of compliance with:
- IMC 914.4 as concerns controls heat and time controls.
9/16/2024 - not addressed (& this heater has 4hr timer)
- IMC 914.5 as concerns minimum ventilation.
9/16/2024 - not addressed.
- IMC 914.5.1 as concerns signage
9/16/2024 - not addressed.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/27/2024
|
09/20/2024
|
|
Joe Frogge
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
The automatic sprinkler system shall be extended into the sauna.Provide as-built plans with a NICET stamp.Verified at inspection.
|
|
|
Licensed Contractors
|
Approved
|
09/20/2024
|
09/20/2024
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Rejected
|
09/18/2024
|
09/16/2024
|
|
Joe Frogge
|
|
IBC 1103.1 Where required - accessibility
Corrective Action Required
2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities.
2003 ICC/ANSI A117.1 Turning Space. A turning space complying with Section 304 shall be provided within saunas and steam rooms.
Actions required:
- (turning radius compliant)
- Provide verification that door pull is compliant with ADA regulations.
9/16/2024 - not addressed.
|
|
IMC 306.2 Appliances in rooms
Corrective Action Required
2018 IMC Section 914 Sauna Heaters.
Provide verification of compliance with:
- IMC 914.4 as concerns controls heat and time controls.
9/16/2024 - not addressed (& this heater has 4hr timer)
- IMC 914.5 as concerns minimum ventilation.
9/16/2024 - not addressed.
- IMC 914.5.1 as concerns signage
9/16/2024 - not addressed.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/18/2024
|
09/16/2024
|
|
Joe Frogge
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
The automatic sprinkler system shall be extended into the sauna.Provide as-built plans with a NICET stamp.Verified at inspection.
|
|
|
Licensed Contractors
|
Approved
|
09/11/2024
|
09/11/2024
|
|
Joe Frogge
|
|
|
Licensed Contractors
|
Approved
|
03/22/2024
|
07/12/2024
|
|
Joe Frogge
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/22/2024
|
03/22/2024
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
The automatic sprinkler system shall be extended into the sauna.Provide as-built plans with a NICET stamp.Verified at inspection.
|
|
|
Building Plan Review
|
Rejected
|
03/22/2024
|
03/20/2024
|
|
Joe Frogge
|
|
IBC 1103.1 Where required - accessibility
Corrective Action Required
2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities.
2003 ICC/ANSI A117.1 Turning Space. A turning space complying with Section 304 shall be provided within saunas and steam rooms.
Actions required:
- Modify designs to comply. (as dimensioned, minimum 60" clear turning space not available)
- Provide verification that door pull is compliant with ADA regulations.
|
|
IMC 306.2 Appliances in rooms
Corrective Action Required
2018 IMC Section 914 Sauna Heaters.
Provide verification of compliance with:
- IMC 914.4 as concerns controls heat and time controls.
- IMC 914.5 as concerns minimum ventilation.
- IMC 914.5.1 as concerns signage
|
|
|