Permit Application Status

PRCOM20240449


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20240449
Building Permit - Commercial
Withdrawn
TRD REAL ESTATE LLC
ADDITION COMMERCIAL
ADDITION FOR STORAGE OF CAR PARTS
02/02/2024
05/07/2025
Locations
Contacts
CAMM CONSTRUCTION INC, Address:PO BOX 1417, Phone:(816) 607-3602  
TRD REAL ESTATE LLC, Address:607 NW BLUE PARKWAY  
Mike Leardi, Address:344 CAPITAL DR NW, Phone:(816) 564-3918  
  
  
David Eskov Architecture, Address:21466 W 120th St, Phone:(913) 284-3660  
Reviews
Review Type Outcome Est. Completion Date Completed
Zoning Review Approved 02/16/2024 02/14/2024
Ian Trefren
Building Plan Review Approved 02/16/2024 02/14/2024
Joe Frogge
Licensed Contractors Rejected 02/16/2024 02/14/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
02/14/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 02/16/2024 02/13/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/13/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide an as built plan for extending on notification appliance into the space.
Construction documents - Fire protection systems
Corrective Action Required
02/13/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Submit plans for extension of the buildings sprinkler system into the space.
Portable fire extinguishers - general
Corrective Action Required
02/13/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of one 2A,10B,C fire extinguish. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
02/13/2024

The use group is S-1, not M.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
02/02/2024 Application Form Permit Application
02/02/2024 Plans Permit Set
02/02/2024 Letter License Tax Bill
02/15/2024 Approved Plans approved - Permit Set
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home