Permit Application Status

PRCOM20236289


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20236289
Building Permit - Commercial
Final Completion
JR COLLEGE DISTRICT OF METROPOLITAN KCMO
ALTERATION COMMERCIAL
Chemistry lab renovation
11/29/2023
04/09/2024
06/09/2024
03/06/2025
Locations
Contacts
JR COLLEGE DISTRICT OF METROPOLITAN KCMO, Address:3200 BROADWAY  
Infinity Group, LLC, Address:3814 S. Outer Belt Rd  
WEBBER BENNETT, Phone:(816) 308-8944  
TEMP-CON LLC, Address:15670 S KEELER ST, Phone:(913) 768-4888  
Core Electric, Address:3050 S 44th St, Phone:(816) 985-3763  
HOLLIS & MILLER ARCHITECTS, Address:1828 Walnut, Ste. 920, Phone:(816) 442-7700  
PMI Services, LLC, Address:PO Box 726  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 02/07/2024 02/07/2024
Jim Eden
Construction documents - Fire protection systems
Informational
02/07/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide "as built" plans for any sprinkler coverage modifications.
Miscellaneous Correction
Informational
02/07/2024

3803.1.1 Chemical safety reviews. Operating and emergency procedures planning and documentation shall be provided in accordance with Sections 5001.3.3.11 through5001.3.3.17. Such documentation shall be prepared by laboratory safety personnel or special experts, and shall bemade available in the workplace for reference and review by employees. Copies of such documentation shall be made available to the fire code official for review upon request. 3803.1.2 Chemical handling. Receiving, transporting on site, unpacking and dispensing of hazardous materials shall be carried out by persons trained in proper handling of such materials and shall be performed in accordance with Chapters 50 through 67, as applicable. Verified at inspection.
Miscellaneous Correction
Informational
02/07/2024

3803.2 Hazardous materials storage and use. Hazardous materials storage, handling and use in laboratories and laboratory suites complying with Chapter 38 shall be in accordance with this chapter and Chapters 50 through 67. 3803.2.1 Container size. The maximum container size for all hazardous materials shall be 5.3 gallons (20 L) for liquids, 50 pounds (22.7 kg) for solids, 100 cubic feet (2.83 m3) for health-hazard gases per Table 5003.1.1(2) and 500 cubic feet (14.15 m3) for all other gases in accordance with Table 5003.1.1(1). Verified at inspection.
Building Plan Review Approved 02/07/2024 01/31/2024
Joe Frogge
IBC 1103.1 Where required - accessibility
Resolved
01/31/2024

2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: - Provide turning space in front of lockers. - At least 1 fume hood to be accessible (max. 34" high at work space)
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Resolved
01/31/2024

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Provide some accessible surfaces at cabinetry represented in elevations E1 and N1 on sheet A621.
IMC 602.2.1 Materials within plenums
Resolved
01/31/2024

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: Provide verification that acid waste pvfd meets flame spread and smoke develop indexes.
IPC 916.3 Island vent installation below flood level rim
Resolved
01/31/2024

2018 IPC 916.3 Vent installation below the fixture flood level rim. The vent located below the flood level rim of the fixture being vented shall be installed as required for drainage piping in accordance with Chapter 7, except for sizing. The vent shall be sized in accordance with Section 906.2. The lowest point of the island fixture vent shall connect full size to the drainage system. The connection shall be to a vertical drain pipe or to the top half of a horizontal drain pipe. Cleanouts shall be provided in the island fixture vent to permit rodding of all vent piping located below the flood level rim of the fixtures. Rodding in both directions shall be permitted through a cleanout. Action required: Modify island fixture vent venting detail. Cleanout on vent side to either be above flood rim level or be bi-directional.
Licensed Contractors Rejected 02/07/2024 01/31/2024
Joe Frogge
LC - General Contractor
Resolved
01/31/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
02/27/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Infinity Group is not licensed to do plumbing work) 1/31/24 - PMI Service is not licensed with us.
Fire Plan Review Approved with Conditions 12/11/2023 12/11/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
12/11/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide "as built" plans for any sprinkler coverage modifications.
Miscellaneous Correction
Corrective Action Required
12/11/2023

3803.1.1 Chemical safety reviews. Operating and emergency procedures planning and documentation shall be provided in accordance with Sections 5001.3.3.11 through5001.3.3.17. Such documentation shall be prepared by laboratory safety personnel or special experts, and shall bemade available in the workplace for reference and review by employees. Copies of such documentation shall be made available to the fire code official for review upon request. 3803.1.2 Chemical handling. Receiving, transporting on site, unpacking and dispensing of hazardous materials shall be carried out by persons trained in proper handling of such materials and shall be performed in accordance with Chapters 50 through 67, as applicable. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
12/11/2023

3803.2 Hazardous materials storage and use. Hazardous materials storage, handling and use in laboratories and laboratory suites complying with Chapter 38 shall be in accordance with this chapter and Chapters 50 through 67. 3803.2.1 Container size. The maximum container size for all hazardous materials shall be 5.3 gallons (20 L) for liquids, 50 pounds (22.7 kg) for solids, 100 cubic feet (2.83 m3) for health-hazard gases per Table 5003.1.1(2) and 500 cubic feet (14.15 m3) for all other gases in accordance with Table 5003.1.1(1). Verified at inspection.
Building Plan Review Rejected 12/11/2023 12/06/2023
Joe Frogge
IBC 1103.1 Where required - accessibility
Corrective Action Required
12/06/2023

2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: - Provide turning space in front of lockers. - At least 1 fume hood to be accessible (max. 34" high at work space)
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
12/06/2023

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Provide some accessible surfaces at cabinetry represented in elevations E1 and N1 on sheet A621.
IMC 602.2.1 Materials within plenums
Corrective Action Required
12/06/2023

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: Provide verification that acid waste pvfd meets flame spread and smoke develop indexes.
IPC 916.3 Island vent installation below flood level rim
Corrective Action Required
12/06/2023

2018 IPC 916.3 Vent installation below the fixture flood level rim. The vent located below the flood level rim of the fixture being vented shall be installed as required for drainage piping in accordance with Chapter 7, except for sizing. The vent shall be sized in accordance with Section 906.2. The lowest point of the island fixture vent shall connect full size to the drainage system. The connection shall be to a vertical drain pipe or to the top half of a horizontal drain pipe. Cleanouts shall be provided in the island fixture vent to permit rodding of all vent piping located below the flood level rim of the fixtures. Rodding in both directions shall be permitted through a cleanout. Action required: Modify island fixture vent venting detail. Cleanout on vent side to either be above flood rim level or be bi-directional.
Licensed Contractors Rejected 12/11/2023 12/06/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
12/06/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
12/06/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Infinity Group is not licensed to do plumbing work)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $2,350.00 $2,350.00 Paid 04/09/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/06/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 6/11/2024 6/11/2024 06/11/2024
Misc
Corrective Action Required
06/11/2024
- Complete all MEP's
In-wall Inspection Partial 7/9/2024 7/9/2024 07/09/2024
Misc
Corrective Action Required
06/11/2024
- Inspected south wall , OK
Above Ceiling Inspection Partial 7/24/2024 7/24/2024 07/24/2024
Misc
Corrective Action Required
07/24/2024
Inspected 201A, 201B, 201C Main room not completed
In-wall Inspection Passed 7/24/2024 7/24/2024 07/24/2024
Misc
Informational
07/24/2024
- Inspected south wall , OK
Misc
Informational
07/24/2024
- inspected East wall
Above Ceiling Inspection Passed 8/12/2024 8/12/2024 08/12/2024
Misc
Corrective Action Required
07/24/2024
Inspected 201A, 201B, 201C 201,101
Occupancy Inspection - Codes Commercial Ready for Temp CO 8/16/2024 8/16/2024 08/16/2024
Misc
Corrective Action Required
08/16/2024
- provide back flow preventer to supply of ice maker ASSE 1024 leave ice maker disconnected until inspection - Approval of FD *** OK for TCO
Final Inspection - Commercial Failed 8/16/2024 08/16/2024
Misc
Corrective Action Required
08/16/2024
- provide back flow preventer to supply of ice maker ASSE 1024 leave ice maker disconnected until inspection - Approval of FD
Occupancy Inspection - Fire Temporary C of O 8/16/2024 8/16/2024 08/20/2024
Occupancy Inspection - Codes Commercial Full C of O 3/6/2025 03/06/2025
Misc
Resolved
03/06/2025
Final Inspection - Commercial Passed 3/6/2025 03/06/2025
Misc
Resolved
03/06/2025
- provide back flow preventer to supply of ice maker ASSE 1024 leave ice maker disconnected until inspection - Approval of FD
Verify Final Inspection (Final) Complete 3/6/2025 3/6/2025 03/06/2025
Documents & Images
Date Uploaded File Type Document Name
11/29/2023 Application Form 231129_MCC Labs_Commercial Permit Application_LS
11/29/2023 Plans Dwgs OTB Set_231006
11/29/2023 Specifications Specs Vol 1_231006
11/29/2023 Specifications Specs Vol 2_231006
12/12/2023 Letter DS P/R Corrections Document
01/31/2024 Plans 23011 MCC LV 100 Pct Dwgs CA Set_240130
01/31/2024 Letter 240130_MCCLabs_LSCommentsResponse
02/08/2024 Approved Plans approved - 23011 MCC LV 100 Pct Dwgs CA Set_240130
04/09/2024 Receipt Receipt for transaction: 2024-002247
04/09/2024 Letter DS Building Permit
06/11/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/24/2024 Letter INSPECTION SUMMARY
07/24/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
02/19/2025 Letter Codes 140 Day Letter
03/06/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/06/2025 Receipt Receipt for transaction:2025-001320
03/06/2025 Letter Codes Final Certificate of Occupancy
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home