Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Plan Review
|
Rejected
|
10/27/2023
|
10/25/2023
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
10/24/23 - not addressed.
|
|
Code analysis required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Provide detailed code analysis that includes use of accessibility exception to avoid elevator. 2018 IBC 1104.4?
|
|
Miscellaneous Correction
Inadequate information to complete review.
Provide the following:
- Complete design of guards and handrails
- Specify anchoring method where columns meet piers.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
10/27/2023
|
10/24/2023
|
|
Jim Eden
|
|
Miscellaneous Correction
Provide a Code Analysis for the project.
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Verified at inspection.
|
|
Illumination required
2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied.
Including emergency illumination of the stairs.
Provide a lighting plan.
|
|
|
Licensed Contractors
|
Approved
|
10/27/2023
|
10/20/2023
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Rejected
|
08/28/2023
|
08/29/2023
|
|
Jim Eden
|
|
Miscellaneous Correction
Corrective Action Required
Provide a Code Analysis for the project.
|
|
Illumination required
Corrective Action Required
2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied.
Including emergency illumination of the stairs.
Provide a lighting plan.
|
|
|
Building Plan Review
|
Rejected
|
08/28/2023
|
08/23/2023
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
|
|
Code analysis required
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Provide detailed code analysis that includes use of accessibility exception to avoid elevator. 2018 IBC 1104.4?
|
|
Miscellaneous Correction
Corrective Action Required
Inadequate information to complete review.
Provide the following:
- Complete design of guards and handrails
- Specify anchoring method where columns meet piers.
|
|
|
Licensed Contractors
|
Approved
|
08/30/2023
|
08/23/2023
|
|
Joe Frogge
|
|
|
Final Development Plan Review
|
Pending
|
|
|
|
Grant White
|
|
Smitty's Oasis - New Outdoor Dining Area.
|