Permit Application Status

PRCOM20233292


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20233292
Building Permit - Commercial
Withdrawn
MIDWEST WASH GROUP LLC
NEW COMMERCIAL
NEW DRIVE THRU CAR WASH WITH DOG WASH STATION
07/10/2023
01/02/2024
Locations
Contacts
KADEAN CONSTRUCTION, Address:3668 S GEYER RD STE 100, Phone:(636) 305-0099  
Michael Schneider - Kadean Construction, Phone:(816) 718-5075  
  
  
  
Modernwash, Address:5220 Scottsville Rd, Phone:(270) 842-1652  
MIDWEST WASH GROUP LLC, Address:1362 NE WINDSOR DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 07/24/2023 07/24/2023
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
07/24/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Verified at inspection.
Hydrant required
Corrective Action Required
07/24/2023

2018 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). Provide fire hydrants per the approved Final Development Plan
Building Plan Review Rejected 07/24/2023 07/18/2023
Joe Frogge
Final Development Plan
Corrective Action Required
07/18/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Misc
Corrective Action Required
07/18/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. License tax in this case will be $31,044.75
IPC 403.1 Minimum number of fixtures
Corrective Action Required
07/18/2023

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink. (also - specify compliant wall finishes at sink per IBC 1209.2.2 - if paint is used it must be epoxy based)
Planning - Screening of ground mounted equipment
Corrective Action Required
07/18/2023

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: re: heat pumps. Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (screening on L100 in FDP submittal inadequate)
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
07/18/2023

2017 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic hardware on doors out of equipment room that contains panel MDP.
Licensed Contractors Rejected 07/24/2023 07/18/2023
Joe Frogge
LC - MEP Subs
Corrective Action Required
07/18/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
07/10/2023 Application Form Commercial Permit Application Lees Summit
07/13/2023 Engineer Report/Study 06_Midwest Car Wash GTECH Report_Rev0_2023_05_08
07/13/2023 Plans 230622 - MIDWEST LEE'S SUMMIT CD SET- FOR PERMIT
07/24/2023 Letter DS P/R Corrections Document
07/24/2023 Letter License Tax Bill
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home