Summary
PRCOM20233152
Building Permit - Commercial
Certificate of Occupancy
MSE PROPERTY HOLDINGS GROUP, LLC
ALTERATION COMMERCIAL
CRASH CHAMPIONS - ALTERATION TO EXISTING SPACE - INCLUDES NEW RESTROOM AND OFFICE
06/30/2023
08/10/2023
01/14/2024
05/14/2024
Locations
Contacts
MSE PROPERTY HOLDINGS GROUP, LLC, Address:14330 S CICERO AVE  
ROSE CONSTRUCTION CO., INC., Address:15311 W 109TH STREET, Phone:(913) 782-0777  
CHRISB@BUILDWITHROSE.COM  
WATSON MECHANICAL INC, Address:15311 W 109TH ST, Phone:(913) 782-0777  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
ESSARY PLUMBING INC, Address:6238 MERRIAM DR, Phone:(913) 522-6222  
ROSE DESIGN BUILD - CHRIS BELL, Address:15311 WEST 109TH ST, Phone:(913) 782-0777  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 08/09/2023 08/08/2023
Jim Eden
Address numbers required
Corrective Action Required
08/02/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Make sure the address is posted along with a B.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
08/02/2023

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. THe paint booths shall have documentation of a current annual inspection.
Portable fire extinguishers - general
Corrective Action Required
08/02/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
08/02/2023

Correct the occupancy classification from B to S1.
Building Plan Review Approved 08/09/2023 08/04/2023
Joe Frogge
Misc
Resolved
08/04/2023

Where will relocated sheds end up? Where are the foundation designs? How will they be anchored? Action required: Provide designs and/or clarifications. Also, Planning staff is assessing situation as potential Final Development Plan submittal. 8/4/23 - sheds to remain unchanged. legal non-conforming
Misc
Resolved
08/04/2023

Additional information required at new exterior door. Actions required: - Provide header detail - Proved landing at exterior side 8/4/23 - per architect wall is not load bearing and exterior is asphalt
Planning - Screening of ground mounted equipment
Resolved
08/04/2023

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (ref: condensing unit CU-1) 8/4/23- per architect there are no new ground mounted equipment
Planning - Screening of rooftop equipment
Resolved
08/04/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (ref: exhaust fan EF-1) 8/4/23- per architect this is just a replacement
Miscellaneous Correction
Resolved
08/04/2023

More information required for plumbing services. Action required: Specify location and type of connection of new water and sewer services. Detail indicates new water meter? This may trigger Engineering Review and/of Final Development Plan. 8/4/23- per architect this is all private on site
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
08/04/2023

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles within 25' of new condensing unit and roof mounted ventilation fan. 8/4/23- per architect there is no new equipment
Licensed Contractors Approved 08/09/2023 08/04/2023
Joe Frogge
Zoning Review Approved 08/09/2023 08/02/2023
Joe Frogge
sheds are legal non-conforming so may stay in place. If relocated they must be approved and be on footings or similar approved foundations.
Fire Plan Review Approved with Conditions 07/13/2023 07/18/2023
Jim Eden
Address numbers required
Corrective Action Required
07/18/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Make sure the address is posted along with a B.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
07/18/2023

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. THe paint booths shall have documentation of a current annual inspection.
Portable fire extinguishers - general
Corrective Action Required
07/18/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
07/18/2023

Correct the occupancy classification from B to S1.
Building Plan Review Rejected 07/13/2023 07/10/2023
Joe Frogge
Misc
Corrective Action Required
07/10/2023

Where will relocated sheds end up? Where are the foundation designs? How will they be anchored? Action required: Provide designs and/or clarifications. Also, Planning staff is assessing situation as potential Final Development Plan submittal.
Misc
Corrective Action Required
07/10/2023

Additional information required at new exterior door. Actions required: - Provide header detail - Proved landing at exterior side
Planning - Screening of ground mounted equipment
Corrective Action Required
07/10/2023

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (ref: condensing unit CU-1)
Planning - Screening of rooftop equipment
Corrective Action Required
07/10/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (ref: exhaust fan EF-1)
Miscellaneous Correction
Corrective Action Required
07/10/2023

More information required for plumbing services. Action required: Specify location and type of connection of new water and sewer services. Detail indicates new water meter? This may trigger Engineering Review and/of Final Development Plan.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
07/10/2023

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles within 25' of new condensing unit and roof mounted ventilation fan.
Licensed Contractors Approved 07/13/2023 06/30/2023
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $500.00 $500.00 Paid 08/09/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 9/25/2023 9/25/2023 09/25/2023
In-wall Inspection Partial 11/10/2023 11/10/2023
Misc
Informational
11/10/2023
*The following areas approved: -Bathroom ok to cover
Above Ceiling Inspection Partial 11/10/2023 11/10/2023 11/10/2023
Misc
Corrective Action Required
11/10/2023
The following areas approved: **Bathroom lid ok to cover-Connect exhaust to exterior (will check from outside of space)
Sanitary Sewer Construction Inspection Partial 1/31/2024 1/31/2024 01/31/2024
Misc
Informational
01/31/2024
1-31-24 PS Inspected line from sewage injector pump at building B to cleanout at building A per plans. Approved to backfill line. Recall for inspection of pump after placement and connection of oil/grease interceptor to pump
Sanitary Sewer Construction Inspection Passed 1/31/2024 1/31/2024 01/31/2024
Misc
Informational
01/31/2024
1-31-24 PS Inspected line from sewage injector pump at building B to cleanout at building A per plans. Approved to backfill line. Recall for inspection of pump after placement and connection of oil/grease interceptor to pump PM. Inspected oil/grease interceptor connection to pump, ok to backfill
All Rough Inspection - Commercial Passed 4/2/2024 4/2/2024 04/02/2024
Above Ceiling Inspection Passed 04/02/2024
Misc
Resolved
04/02/2024
The following areas approved: **Bathroom lid ok to cover-Connect exhaust to exterior (will check from outside of space)
In-wall Inspection Passed 04/02/2024
Misc
Resolved
04/02/2024
*The following areas approved: -Bathroom ok to cover
Gas Service Inspection - Commercial Passed 4/2/2024 4/2/2024 04/02/2024
Occupancy Inspection - Codes Commercial Failed 5/9/2024 5/9/2024 05/09/2024
Misc
Corrective Action Required
05/09/2024
-Complete all corrections for LSFD -Provide accessible restroom signage -Secure whip at mini split -Label electrical panel -Provide cover and working GFCI at south exterior *Ok to move into office space
Occupancy Inspection - Codes Commercial Full C of O 5/14/2024 5/14/2024 05/14/2024
Misc
Resolved
05/14/2024
-Complete all corrections for LSFD -Provide accessible restroom signage -Secure whip at mini split -Label electrical panel -Provide cover and working GFCI at south exterior *Ok to move into office space
Occupancy Inspection - Fire Passed 5/14/2024 5/14/2024 05/14/2024
Documents & Images
Date Uploaded File Type Document Name
06/30/2023 Application Form APPLICATION
06/30/2023 Plans Crash Building B interior remodel
07/18/2023 Letter DS P/R Corrections Document
08/02/2023 Plans Crash Building B interior remodel
08/02/2023 Letter City comment response letter
08/02/2023 Engineer Report/Study fan specs
08/09/2023 Receipt Receipt for transaction:2023-006157
08/10/2023 Letter DS Building Permit
08/10/2023 Approved Plans approved - Crash Building B interior remodel0
09/25/2023 Letter INSPECTION SUMMARY
11/01/2023 Drawing 2023 1101 Crash Champions Building B - P-rev - SIGNED
11/01/2023 Approved Plans approved P1-P2
11/10/2023 Letter INSPECTION SUMMARY
11/10/2023 Letter INSPECTION SUMMARY
01/31/2024 Letter INSPECTION SUMMARY
01/31/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter Fire Building Plan Review
04/02/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter INSPECTION SUMMARY
04/02/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter Codes Final Certificate of Occupancy
05/14/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents