Permit Application Status

PRCOM20231805


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20231805
Building Permit - Commercial
Certificate of Occupancy
AHG INC
NEW TENANT FINISH
TENANT FINISH FOR SHOWROOM AND STORAGE OF COUNTERTOP SLABS
04/24/2023
05/26/2023
06/28/2023
Locations
Contacts
AHG INC, Address:3170 NE CARNEGIE DR # 400  
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
D ELECTRIC, LLC, Address:6416 W 194TH ST, Phone:(913) 851-0458  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/30/2023 06/28/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
06/28/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Recieved.
Installation acceptance testing
Corrective Action Required
06/28/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the occupancy inspection.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
06/28/2023

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The existing sprinkler system shall have documentation of a current annual inspection. Verified at inspection.
Licensed Contractors Approved 05/04/2023 05/24/2023
Joe Frogge
LC - MEP Subs
Resolved
05/24/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 05/04/2023 05/03/2023
Joe Frogge
Fire Plan Review Approved with Conditions 05/04/2023 05/02/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
05/02/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Address numbers required
Corrective Action Required
05/02/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Provide address numbers on the front and rear doors of the space. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
05/02/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval for any sprinkler system modifications.
Portable fire extinguishers - general
Corrective Action Required
05/02/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide minimum 2A:10B:C fire extinguishers in the space to maintain a 75 foot travel distance. Verified at inspection.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $640.00 $640.00 Paid 05/25/2023
7232302-Industrial/Warehouse License Tax Fee $1,463.00 $1,463.00 Paid 05/01/2023
$1,463.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 5/26/2023 5/26/2023 05/26/2023
In-wall Inspection Failed 5/26/2023 5/26/2023 05/26/2023
Misc
Corrective Action Required
05/26/2023
-Protect plumbing where within 1.25" of stud/track surface
In-wall Inspection Failed 5/31/2023 5/31/2023 05/31/2023
Misc
Corrective Action Required
05/26/2023
-Protect plumbing where within 1.25" of stud/track surface **also for out-of-wall PVC piping, support horizontal piping at max 4 ft interval and vertical piping at less than 10 ft interval
In-wall Inspection Passed 6/1/2023 6/1/2023 06/01/2023
Misc
Resolved
06/01/2023
-Protect plumbing where within 1.25" of stud/track surface **also for out-of-wall PVC piping, support horizontal piping at max 4 ft interval and vertical piping at less than 10 ft interval
Electrical Service Inspection Passed 6/7/2023 6/7/2023 06/07/2023
Above Ceiling Inspection Passed 6/22/2023 6/22/2023 06/22/2023
Occupancy Inspection - Fire Passed 6/28/2023 6/28/2023 06/28/2023
Occupancy Inspection - Codes Commercial Full C of O 6/28/2023 6/28/2023 06/28/2023
Documents & Images
Date Uploaded File Type Document Name
04/24/2023 Application Form Commercial Permit Application_Rocktops
04/24/2023 Engineer Report/Study 22-0333 - Mett - Sealed Calculations
04/24/2023 Plans 23087_Rocktops TI - Full Set
05/03/2023 Letter License Tax Bill
05/03/2023 Approved Plans approved - 23087_Rocktops TI - Full Set
05/25/2023 Receipt Receipt for transaction:2023-003656
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter DS Building Permit
05/31/2023 Letter INSPECTION SUMMARY
06/01/2023 Letter INSPECTION SUMMARY
06/07/2023 Letter Fire Building Plan Review
06/07/2023 Letter DS Building Permit
06/07/2023 Letter INSPECTION SUMMARY
06/16/2023 Rocktops PE stamp
06/22/2023 Letter INSPECTION SUMMARY
06/28/2023 Letter Field Certificate of Occupancy
06/28/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home