Permit Application Status

PRCOM20230456


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20230456
Building Permit - Commercial
Final Completion
MIDWEST DIVISION LSH LLC
ALTERATION COMMERCIAL
CHILLER PLANT RENOVATIONS
02/01/2023
02/23/2023
02/21/2024
Locations
Contacts
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
DAVID.MOORMAN@USENGINEERING.COM  
US ENGINEERING CONSTRUCTION LLC, Address:3433 ROANOKE RD , Phone:(816) 753-6969  
US ENGINEERING CONSTRUCTION LLC, Address:3433 ROANOKE RD , Phone:(816) 753-6969  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
HENDERSON ENGINEERS, Address:8345 LENEXA DR; SUITE 300, Phone:(913) 742-5000  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 02/13/2023 02/15/2023
Jim Eden
Installation acceptance testing
Corrective Action Required
02/15/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. The fire department shall witness testing of all safies, overides and interlocks at time of final inspection.
Building Plan Review Approved 02/13/2023 02/07/2023
Joe Frogge
Licensed Contractors Approved 02/01/2023 02/01/2023
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $1,584.76 $1,584.76 Paid 02/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Mechanical Inspection Passed 2/21/2024 2/21/2024 02/21/2024
Verify Final Inspection (Final) Complete 2/21/2024 02/21/2024
Documents & Images
Date Uploaded File Type Document Name
02/01/2023 Application Form APPLICATION
02/01/2023 Plans Lees Summit MC Chiller Plant - Permit Drawings Combined
02/01/2023 Specifications Lee's Summit MC Chiller Plant Specifications
02/15/2023 Letter Fire Building Plan Review
02/15/2023 Approved Plans approved - Lees Summit MC Chiller Plant - Permit Drawings Combined
02/15/2023 Receipt Receipt for transaction:2023-000894
02/21/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home