Permit Application Status

PRCOM20225574


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20225574
Building Permit - Commercial
Final Completion
R&R AESTHETIC INVESTMENTS LLC
ALTERATION COMMERCIAL
Exterior Renovations for Advanced Aesthetic Center
11/04/2022
02/23/2023
05/10/2023
06/19/2023
Locations
Contacts
R&R AESTHETIC INVESTMENTS LLC, Address:100 SW 3RD ST  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
Miller Custom Homes, LLC, Address:17812 Rock Island Rd  
PAUL@BELLAHHOMES.COM  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 12/02/2022 02/16/2023
Joe Frogge
IBC 1208.2 Attic spaces
Resolved
11/23/2022

2018 IBC 1208.2 Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Specify location of access panel (or similar) for newly formed concealed space.
Planning - Exterior renovation permit
Corrective Action Required
11/23/2022

Unified Development Ordinance Section 8.420. Development and Renovation within the Downtown Core Area A) Preliminary and Final Development Plans. Applications for new development or redevelopment of any commercial or mixed use property in the Downtown Core Area shall be reviewed through the preliminary development plan and final development plan application, modification and appeal processes as set forth in Article 5, Applications and Procedures, of this chapter. B) Exterior Renovation Permit. An exterior renovation permit is required for all exterior work in the Downtown Core Area when the design standards of this division apply, but the preliminary and final development plan review processes of Article 5 do not apply, and as otherwise provided herein. The applicability of the design standards is described in detail in Sections 8.440.A. and 8.450.A. of this division. 1) Requirements a) An exterior renovation permit shall be required prior to any: (1) Exterior rehabilitation (returning to an original condition). (2) Exterior remodeling, including façade removal or replacement, window and door replacement. (3) Replacement lighting or similar fixtures within the Commercial Core. (4) Window replacement. (5) Signage, new or replacement in the Commercial Core. (6) Awnings, new or replacement in the Commercial Core. (7) New construction or reconstruction of a building addition or any other exterior work, not defined as maintenance herein, on any building located in the Downtown Core Area. (8) An Exterior Renovation shall be required prior to any work on a building listed in the National Register, for which tax credits are being requested and where the Secretary of the Interior's Standards for the Treatment of Historic Properties apply. Action required: Exterior Renovation Permit required. Coordinate requirements with Planning Department. 2/16/23 - Planning dept ERP process is near completion and assumed to be approved. Permit can be issued on at-risk basis
Licensed Contractors Approved 12/02/2022 02/15/2023
Joe Frogge
LC - General Contractor
Resolved
02/15/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 11/23/22 - acknowledged in letter
LC - MEP Subs
Resolved
02/15/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/23/22 - acknowledged in letter
Fire Plan Review Approved with Conditions 12/02/2022 11/28/2022
Ben Hicks
Portable fire extinguishers - conspicuous locations
Resolved
11/28/2022

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Action Required: Show locations of fire extinguishers
Illumination required
Resolved
11/28/2022

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. Action Required: Show emergency lighting to include exterior egress emergency lighting.
Discharge identification
Corrective Action Required
11/28/2022

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. Action Required: Show emergency exterior egress illumination. Acknowledged in letter, verified at inspection.
Building Plan Review Rejected 11/16/2022 11/11/2022
Joe Frogge
IBC 1208.2 Attic spaces
Corrective Action Required
11/11/2022

2018 IBC 1208.2 Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Specify location of access panel (or similar) for newly formed concealed space.
Planning - Exterior renovation permit
Corrective Action Required
11/11/2022

Unified Development Ordinance Section 8.420. Development and Renovation within the Downtown Core Area A) Preliminary and Final Development Plans. Applications for new development or redevelopment of any commercial or mixed use property in the Downtown Core Area shall be reviewed through the preliminary development plan and final development plan application, modification and appeal processes as set forth in Article 5, Applications and Procedures, of this chapter. B) Exterior Renovation Permit. An exterior renovation permit is required for all exterior work in the Downtown Core Area when the design standards of this division apply, but the preliminary and final development plan review processes of Article 5 do not apply, and as otherwise provided herein. The applicability of the design standards is described in detail in Sections 8.440.A. and 8.450.A. of this division. 1) Requirements a) An exterior renovation permit shall be required prior to any: (1) Exterior rehabilitation (returning to an original condition). (2) Exterior remodeling, including façade removal or replacement, window and door replacement. (3) Replacement lighting or similar fixtures within the Commercial Core. (4) Window replacement. (5) Signage, new or replacement in the Commercial Core. (6) Awnings, new or replacement in the Commercial Core. (7) New construction or reconstruction of a building addition or any other exterior work, not defined as maintenance herein, on any building located in the Downtown Core Area. (8) An Exterior Renovation shall be required prior to any work on a building listed in the National Register, for which tax credits are being requested and where the Secretary of the Interior's Standards for the Treatment of Historic Properties apply. Action required: Exterior Renovation Permit required. Coordinate requirements with Planning Department.
Licensed Contractors Rejected 11/16/2022 11/11/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
11/11/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
11/11/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 11/16/2022 11/10/2022
Ben Hicks
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/10/2022

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Action Required: Show locations of fire extinguishers
Illumination required
Corrective Action Required
11/10/2022

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. Action Required: Show emergency lighting to include exterior egress emergency lighting.
Discharge identification
Corrective Action Required
11/10/2022

2018 IFC (B) 1023.8 Discharge identification. An interior exit stairway and ramp shall not continue below its level of exit discharge to prevent persons from unintentionally continuing into levels below. Directional exit signs shall be provided as specified in Section 1011. Action Required: Show emergency exit signage and exterior egress illumination.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $300.00 $300.00 Paid 02/16/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Passed 3/1/2023 (2:00) 3/1/2023 03/01/2023
In-wall Inspection Passed 4/19/2023 4/19/2023 04/19/2023
Rough Electrical Inspection - Commercial Passed 4/19/2023 4/19/2023 04/19/2023
Above Ceiling Inspection Failed 4/19/2023 4/19/2023 04/19/2023
Misc
Corrective Action Required
04/19/2023
Complete electrical for inspection
Above Ceiling Inspection Passed 5/19/2023 5/19/2023 05/19/2023
Misc
Resolved
05/19/2023
Complete electrical for inspection
Final Electrical Inspection - Commercial Passed 06/16/2023
Documents & Images
Date Uploaded File Type Document Name
11/07/2022 Plans AAC EXTERIOR CDs 11-04-2022
11/07/2022 Specifications AAC EXTERIOR Structural Calcs 11-04-2022
11/10/2022 Letter Fire Building Plan Review
11/11/2022 Email email from planning
11/11/2022 Letter DS P/R Corrections Document
11/23/2022 Plans AAC EXTERIOR CDs 11-23-2022
11/23/2022 Letter AAC Exterior City Review Response 11-23-2022
11/28/2022 Letter Fire Building Plan Review
02/10/2023 Application Form AAC EXTERIOR Permit App
02/16/2023 Email email from planning -
02/16/2023 Receipt Receipt for transaction:2023-000911
03/01/2023 Letter INSPECTION SUMMARY
04/18/2023 Approved Plans approved - AAC EXTERIOR CDs 11-23-2022
04/19/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter DS Building Permit
04/19/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
05/19/2023 Letter Fire Building Plan Review
05/19/2023 Letter Fire Building Plan Review
05/19/2023 Letter INSPECTION SUMMARY
06/16/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home