Permit Application Status

PRCOM20225390


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20225390
Building Permit - Commercial
Final Completion
CHANGE OF TENANT
MAMON LLC - TENANT FINISH FOR SALE OF TOBACCO PRODUCTS
10/27/2022
12/21/2022
05/09/2023
03/17/2025
Locations
Contacts
WATERFORD DESIGN BUILD INC, Address:P O BOX 8150, Phone:(913) 432-7123  
3F30 ARCHITECTS, Address:7501 NW TIFFANY SPRINGS PARKWAY STE 240, Phone:(816) 801-7070  
THE ISLAS FAM, Address:106 S VERMONT, Phone:(816) 835-9753  
BRUCE ROBERTS , Address:P O BOX 8150, Phone:(913) 432-7123  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/22/2022 11/28/2022
Joe Frogge
LC - General Contractor
Resolved
11/28/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 11/15/22 - acknowledged in letter.
LC - MEP Subs
Resolved
11/28/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/15/22 - acknowledged in letter.
Fire Plan Review Approved 11/22/2022 11/18/2022
Ben Hicks
Construction documents for fire alarm systems
Resolved
11/18/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Construction documents - Fire protection systems
Resolved
11/18/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Resolved
11/18/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Misc
Resolved
11/18/2022

Building Plan Review Approved with Conditions 11/22/2022 11/15/2022
Joe Frogge
Code analysis required
Resolved
11/15/2022

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis. (fyi - this building is a fully sprinklered VB)
IBC 2902.3 Employee and public toilet facilities - access to public toilet
Corrective Action Required
11/15/2022

2018 IBC 2902.3 Employee and public toilet facilities. For structures and tenant spaces intended for public utilization, customers, patrons and visitors shall be provided with public toilet facilities. Employees associated with structures and tenant spaces shall be provided with toilet facilities. The number of plumbing fixtures located within the required toilet facilities shall be provided in accordance with Section 2902 for all users. Employee toilet facilities shall be either separate or combined employee and public toilet facilities. Exception: Public toilet facilities shall not be required for: 1. Parking garages where operated without parking attendants. 2. Structures and tenant spaces intended for quick transactions, including takeout, pickup and drop-off, having a public access area less than or equal to 300 square feet. Action required: Comment is for informational purposes. Public access to restroom will be required. 11/15/22 - acknowledged in letter
Misc
Corrective Action Required
11/15/2022

Smoking inside commercial facilities is prohibited by ordinance Sec. 17-305. Action required: Comment is informational. 11/15/22 - not addressed
Fire Plan Review Rejected 11/08/2022 11/10/2022
Ben Hicks
Construction documents for fire alarm systems
Corrective Action Required
11/10/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Construction documents - Fire protection systems
Corrective Action Required
11/10/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Corrective Action Required
11/10/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Misc
Corrective Action Required
11/10/2022

Building Plan Review Rejected 11/08/2022 10/28/2022
Joe Frogge
Code analysis required
Corrective Action Required
10/28/2022

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis. (fyi - this building is a fully sprinklered VB)
IBC 2902.3 Employee and public toilet facilities - access to public toilet
Corrective Action Required
10/28/2022

2018 IBC 2902.3 Employee and public toilet facilities. For structures and tenant spaces intended for public utilization, customers, patrons and visitors shall be provided with public toilet facilities. Employees associated with structures and tenant spaces shall be provided with toilet facilities. The number of plumbing fixtures located within the required toilet facilities shall be provided in accordance with Section 2902 for all users. Employee toilet facilities shall be either separate or combined employee and public toilet facilities. Exception: Public toilet facilities shall not be required for: 1. Parking garages where operated without parking attendants. 2. Structures and tenant spaces intended for quick transactions, including takeout, pickup and drop-off, having a public access area less than or equal to 300 square feet. Action required: Comment is for informational purposes. Public access to restroom will be required.
Misc
Corrective Action Required
10/28/2022

Smoking inside commercial facilities is prohibited by ordinance Sec. 17-305. Action required: Comment is informational.
Licensed Contractors Rejected 10/27/2022 10/28/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
10/28/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
10/28/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $50.00 $50.00 Paid 11/30/2022
$8,167.50
7232302-Commercial License Tax Fee $3,910.50 $3,910.50 Paid 12/21/2022
$2,722.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Commercial Failed 12/27/2022 12/27/2022 12/27/2022
Misc
Corrective Action Required
12/27/2022
-provide grab bars in bathroom per plans -no above ceiling inspection performed, remove ceiling tiles and schedule above ceiling inspection for new lighting added -mark all current breaker locations at service panel, make all breakers operational (breaker covered with tape) -remove all combustible materials and chemicals from mech room -cover plates all outlets and switches -obtain sign permit -make all corrections required for Fire Dept
Occupancy Inspection - Fire Failed 12/27/2022 12/27/2022 12/27/2022
Corrective Action Required
12/27/2022
Alarm notification is needed in the main sails area and restroom. Fire extinguisher needed by the front door.
Above Ceiling Inspection Failed 1/27/2023 1/27/2023 01/27/2023
Misc
Corrective Action Required
01/27/2023
REMOVE CEILING TILES AROUND THE NEW CEILING LIGHTS AND RE-SCHEDULE FOR ABOVE-CEILING INSPECTION. HAVE LADDER AVAILABLE ON SITE
Above Ceiling Inspection Failed 2/1/2023 02/01/2023
Misc
Corrective Action Required
01/27/2023
-Secure all light power supply boxes -Close open electrical box and secure box per code
Above Ceiling Inspection Passed 2/17/2023 2/17/2023 02/17/2023
Misc
Resolved
02/17/2023
-Secure all light power supply boxes -Close open electrical box and secure box per code
Documents & Images
Date Uploaded File Type Document Name
10/27/2022 Application Form APPLICATION
10/27/2022 Plans 3540 SW Market St Plan Set 10_24_22
11/10/2022 Letter Fire Building Plan Review
11/10/2022 Letter DS P/R Corrections Document
11/15/2022 Plans Plan Set 11_15_22
11/15/2022 Letter Response letter 11_15_22
11/18/2022 Letter Fire Building Plan Review
11/28/2022 Letter License Tax Bill
11/28/2022 Approved Plans approved plans
11/30/2022 Receipt Receipt for transaction:2022-009197
12/21/2022 Letter DS Building Permit
12/21/2022 Receipt Receipt for transaction: 2022-009611
12/27/2022 Letter INSPECTION SUMMARY
12/27/2022 Letter Fire Loss Reduction Form
01/27/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter Fire Building Plan Review
01/27/2023 Letter Fire Building Plan Review
01/27/2023 Letter INSPECTION SUMMARY
02/01/2023 Letter INSPECTION SUMMARY
02/17/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home