Permit Application Status

PRCOM20224010


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20224010
Building Permit - Commercial
Certificate of Occupancy
NEW TENANT FINISH
New tenant finish for non-ambulatory outpatient clinic that provides exams and immunizations
08/18/2022
10/11/2022
02/27/2023
03/07/2023
Locations
Contacts
TEAM CONSTRUCTION , Address:6920 W 82ND ST, Phone:(913) 469-9990  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
PM CONTRACTING INC, Address:4015 E 143RD ST, Phone:(816) 318-9844  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
STINE-NICHOLS PLUMBING INC, Address:318 E 16TH AVE, Phone:(816) 348-3481  
mason@teamconstruction.com, Address:mason@teamconstruction.com, Phone:(913) 449-8666  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/01/2022 10/11/2022
Joe Frogge
LC - General Contractor
Resolved
10/11/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
10/11/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 09/09/2022 09/01/2022
Joe Frogge
IMC 501.3.1 Location of exhaust outlets
Resolved
09/01/2022

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Relocate restroom exhaust outlet to be minimum 10' away from air intakes.
Fire Plan Review Approved with Conditions 09/09/2022 09/01/2022
Joe Frogge
Posting of occupant load
Corrective Action Required
09/01/2022

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Inspected upon final)
Construction documents for fire alarm systems
Corrective Action Required
09/01/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (For alarm and sprinkler changes submit shop drawings)
Hazardous material identification
Corrective Action Required
09/01/2022

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
Construction documents - Fire protection systems
Corrective Action Required
09/01/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.( Submit shop drawings for any changes or additions to system)
Installation acceptance testing
Corrective Action Required
09/01/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Contact LSFD for acceptance testing)
Alarms connected to automatic sprinkler system
Corrective Action Required
09/01/2022

2018 IFC 903.4.2- Alarms. Approved audible and visual devices shall be connected to every automatic sprinkler system. Such sprinkler water-flow alarm devices shall be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Listed alarm notification devices shall be provided on the exterior and interior of the building in an approved location. Where a fire alarm system is installed, actuation of the automatic sprinkler system shall actuate the building fire alarm system.
Alarm testing.
Corrective Action Required
09/01/2022

2018 IFC 904.4.2- Alarm testing. Notification appliances, connections to fire alarm systems, and connections to approved supervising stations shall be tested in accordance with this section and Section 907 to verify proper operation. ( Conatc LSFD for acceptance testing)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/01/2022

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified upon inspection)
Fire Plan Review Approved with Conditions 08/30/2022 08/30/2022
Ben Hicks
Posting of occupant load
Corrective Action Required
08/30/2022

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Inspected upon final)
Construction documents for fire alarm systems
Corrective Action Required
08/30/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (For alarm and sprinkler changes submit shop drawings)
Hazardous material identification
Corrective Action Required
08/30/2022

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
Construction documents - Fire protection systems
Corrective Action Required
08/30/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.( Submit shop drawings for any changes or additions to system)
Installation acceptance testing
Corrective Action Required
08/30/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Contact LSFD for acceptance testing)
Alarms connected to automatic sprinkler system
Corrective Action Required
08/30/2022

2018 IFC 903.4.2- Alarms. Approved audible and visual devices shall be connected to every automatic sprinkler system. Such sprinkler water-flow alarm devices shall be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Listed alarm notification devices shall be provided on the exterior and interior of the building in an approved location. Where a fire alarm system is installed, actuation of the automatic sprinkler system shall actuate the building fire alarm system.
Alarm testing.
Corrective Action Required
08/30/2022

2018 IFC 904.4.2- Alarm testing. Notification appliances, connections to fire alarm systems, and connections to approved supervising stations shall be tested in accordance with this section and Section 907 to verify proper operation. ( Conatc LSFD for acceptance testing)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/30/2022

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified upon inspection)
Building Plan Review Rejected 08/30/2022 08/23/2022
Joe Frogge
IMC 501.3.1 Location of exhaust outlets
Corrective Action Required
08/23/2022

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Relocate restroom exhaust outlet to be minimum 10' away from air intakes.
Licensed Contractors Rejected 08/30/2022 08/23/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
08/23/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
08/23/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $1,600.00 $1,600.00 Paid 10/11/2022
$0.00
7232302-Commercial Excise Tax Fee $7,235.25 $7,235.25 Paid 08/19/2022
$7,235.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Electrical Inspection - Commercial Partial 10/24/2022 10/24/2022 10/24/2022
Misc
Corrective Action Required
10/24/2022
FOLLOWING AREAS APPROVED: 10/24/22 - UNDERSLAB CONDUIT AT ELECTRICAL 108
Underslab Plumbing Inspection - Commercial Partial 10/24/2022 10/24/2022 10/24/2022
Misc
Corrective Action Required
10/24/2022
FOLLOWING AREAS APPROVED: 10/24/22 - UNDERSLAB DWV 113,112,111,110,119,118,121,125,122,103,101
In-wall Inspection Failed 11/11/2022 11/11/2022
Misc
Corrective Action Required
11/11/2022
PROVIDE PROTECTION PLATES AT DWV TOP PLATE, SILL PLATE, STUD PENETRATIONS 1 1/4" OR LESS FROM END OF PLATE/STUD - 110,111,113,112,115,119,122,127,128,103, 128,101, DO NOT COVER WITH ROCK ROOMS WITH PLUMBING UNTIL REINSPECTION
Misc
Informational
11/11/2022
ROOMS APPROVED FOR COVER 109,105,106,108, 102,125, 124,123,121,107,126
In-wall Inspection Partial 11/14/2022 11/14/2022
Misc
Resolved
11/14/2022
Misc
Informational
11/11/2022
ROOMS APPROVED FOR COVER 109,105,106,108, 102,125, 124,123,121,107,126,110,111,113,112,115,119,122,127,128,103, 128,101
Above Ceiling Inspection Partial 11/30/2022 11/30/2022 11/30/2022
Misc
Corrective Action Required
11/30/2022
FOLLOWING AREAS ABOVE CEILING APPROVED 11/30/22 HARD LIDS 103,122,119
Above Ceiling Inspection Partial 12/2/2022 12/2/2022 12/02/2022
Misc
Corrective Action Required
11/30/2022
FOLLOWING AREAS ABOVE CEILING APPROVED 11/30/22 HARD LIDS 103,122,119 12/2/22 HARD LID LOBBY 101
Above Ceiling Inspection Failed 1/10/2023 01/10/2023
Misc
Corrective Action Required
12/02/2022
FOLLOWING AREAS ABOVE CEILING APPROVED 11/30/22 HARD LIDS 103,122,119 12/2/22 HARD LID LOBBY 101 1/10/23-MANY OF THE CEILING TIES WERE ALREADY DROPPED. PROVIDE TALL LADDER ON SITE.
Above Ceiling Inspection Failed 1/11/2023 1/11/2023 01/11/2023
Misc
Corrective Action Required
01/10/2023
FOLLOWING AREAS ABOVE CEILING APPROVED 11/30/22 HARD LIDS 103,122,119 12/2/22 HARD LID LOBBY 101 1/11/23: -Fire caulk all penetrations of fire-rated wall -Complete return air from IT room -Secure MC within 12” of box -ZIP tie flexible duct to registers per code
Above Ceiling Inspection Partial 1/17/2023 1/17/2023 01/17/2023
Misc
Corrective Action Required
01/11/2023
FOLLOWING AREAS ABOVE CEILING APPROVED 11/30/22 HARD LIDS 103,122,119 12/2/22 HARD LID LOBBY 101 -Fire caulk penetrations at firewall -Secure MC within 12” of box at corridor walls **OK for tile in other locations
Above Ceiling Inspection Partial 1/17/2023 01/17/2023
Misc
Corrective Action Required
01/17/2023
FOLLOWING AREAS ABOVE CEILING APPROVED 11/30/22 HARD LIDS 103,122,119 12/2/22 HARD LID LOBBY 101 -Fire caulk penetrations at firewall -Secure MC within 12” of box at corridor walls -Knockout cover in corridor **OK for tile in other locations
Above Ceiling Inspection Passed 1/18/2023 1/18/2023 01/18/2023
Misc
Resolved
01/18/2023
FOLLOWING AREAS ABOVE CEILING APPROVED 11/30/22 HARD LIDS 103,122,119 12/2/22 HARD LID LOBBY 101 -Fire caulk penetrations at firewall -Secure MC within 12” of box at corridor walls -Knockout cover in corridor **OK for tile in other locations
In-wall Inspection Passed 3/27/2023 02/27/2023
Misc
Informational
11/14/2022
ROOMS APPROVED FOR COVER 109,105,106,108, 102,125, 124,123,121,107,126,110,111,113,112,115,119,122,127,128,103, 128,101
Underslab Electrical Inspection - Commercial Passed 2/27/2023 02/27/2023
Misc
Corrective Action Required
10/24/2022
FOLLOWING AREAS APPROVED: 10/24/22 - UNDERSLAB CONDUIT AT ELECTRICAL 108
Underslab Plumbing Inspection - Commercial Passed 2/27/2023 02/27/2023
Misc
Corrective Action Required
10/24/2022
FOLLOWING AREAS APPROVED: 10/24/22 - UNDERSLAB DWV 113,112,111,110,119,118,121,125,122,103,101
Occupancy Inspection - Codes Commercial Failed 2/27/2023 2/27/2023 02/27/2023
Misc
Corrective Action Required
02/27/2023
-signage for restrooms -mirror in restrooms -flush handle to be on accessible side in collection bathroom -outlets not working in ds collection area -side emergency exit door to be closing and opening properly -hardware installed on all doors -permanent label on gas meter
Occupancy Inspection - Fire Failed 2/27/2023 02/27/2023
Corrective Action Required
02/27/2023
Exterior emergency, egress lights RTU key test switch needs to be mounted
Occupancy Inspection - Codes Commercial Failed 3/1/2023 3/1/2023 03/01/2023
Misc
Corrective Action Required
02/27/2023
-outlets in ds collection area GFCI protected -permanent label on gas meter -okay to stock, not open to public
Occupancy Inspection - Fire Passed 3/1/2023 03/01/2023
Corrective Action Required
03/01/2023
Exterior emergency, egress lights RTU key test switch needs to be mounted
Occupancy Inspection - Codes Commercial Full C of O 3/7/2023 3/7/2023 03/07/2023
Misc
Corrective Action Required
03/01/2023
-outlets in ds collection area GFCI protected -permanent label on gas meter -okay to stock, not open to public
Documents & Images
Date Uploaded File Type Document Name
08/18/2022 Application Form APPLICATION
08/19/2022 Plans 2022-08-19 CareNow Urgent Care - FINAL Permit Set
08/30/2022 Letter Fire Building Plan Review
08/31/2022 Letter DS P/R Corrections Document
09/01/2022 Letter Response Letter 09012022
09/01/2022 Plans 2022-09-01 CareNow Urgent Care - Resubmittal Permit Set
09/01/2022 Approved Plans approved - 2022-09-01 CareNow Urgent Care - Resubmittal Permit Set
10/11/2022 Receipt Receipt for transaction:2022-008194
10/11/2022 Letter DS Building Permit
10/24/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
11/11/2022 Letter INSPECTION SUMMARY
11/14/2022 Letter INSPECTION SUMMARY
11/30/2022 Letter INSPECTION SUMMARY
12/02/2022 Letter INSPECTION SUMMARY
01/10/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter Fire Loss Reduction Form
03/01/2023 Letter INSPECTION SUMMARY
03/07/2023 Letter Field Certificate of Occupancy
03/01/2023 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home