Permit Application Status

PRCOM20221744


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20221744
Building Permit - Commercial
Certificate of Occupancy
SUMMIT DEVELOPMENT CO
CHANGE OF TENANT
MEDICAL MARIJUANA DISPENSARY
04/28/2022
05/31/2022
11/07/2022
11/22/2022
Locations
Contacts
SUMMIT DEVELOPMENT CO, Address:4622 PENNSYLVANIA AVE STE 700  
WESTHUES ARCHITECTURE, LLC, Address:9000 N BOATMAN HILL ROAD  
KSJ CONSTRUCTION, Address:6703 HWY JJ, Phone:(209) 585-5868  
DONALDSON MECHANICAL INC, Address:934 SE 7TH TER, Unit B, Phone:(816) 246-9500  
LEE'S SUMMIT ELECTRIC, Address:2100 NE RICE RD, Phone:(816) 554-9382  
RIDEN SERVICE CO INC, Address:11306 W 89TH ST, Phone:(913) 432-8495  
JERRYDJANTZ@GMAIL.COM, Phone:(209) 585-5868  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/20/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
06/20/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Drawings received. Future drawings need to include piping.
Installation acceptance testing
Corrective Action Required
06/20/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the occupancy inspection.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
06/20/2022

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The existing system shall have documentation of a current annual inspection. Verified at inspection.
Licensed Contractors Approved 05/31/2022 05/31/2022
Joe Frogge
LC - General Contractor
Resolved
05/31/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 5/24/22 - Email and phone number for on site contact not provided.
LC - MEP Subs
Resolved
05/31/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 5/24/22: - Riden not licensed with us. - Mechanical (HVAC) contractor required.
Fire Plan Review Approved with Conditions 05/31/2022 05/27/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
05/23/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Fire protection equipment identification
Resolved
05/27/2022

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. Action required- The back exterior door and interior door shall be marked Sprinkler Room and Sprinkler Room Access.
Construction documents - Fire protection systems
Corrective Action Required
05/23/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval of modifications to the sprinkler system.
Misc
Resolved
05/27/2022

[BE] 1010.1.9.10 Door hardware release of electrically locked egress doors. Door hardware release of electric locking systems shall be permitted on doors in the means of egress in any occupancy except Group H where installed and operated in accordance with all of the following: 1. The door hardware that is affixed to the door leaf has an obvious method of operation that is readily operated under all lighting conditions. 2. The door hardware is capable of being operated with one hand and shall comply with Section 1010.1.9.6. 3. Operation of the door hardware directly interrupts the power to the electric lock and unlocks the door immediately. 4. Loss of power to the electric locking system automatically unlocks the door. 5. Where panic or fire exit hardware is required by Section 1010.1.10, operation of the panic or fire exit hardware also releases the electric lock. 6. The locking system units shall be listed in accordance with UL 294. Action required- The electric strike equiped doors shall release from the egress side without key, key card, or special knowledge. Verified at inspection.
Knox box required
Resolved
05/27/2022

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- The sprinkler riser and alarm panel for the entire building are accesed through this space and access is required. If security is a concern, providing an exterior door to the sprinkler room and blocking off the interior door may be warranted, or provide a Knox key box monitored with an intrusion alarm.
Building Plan Review Approved 05/31/2022 05/24/2022
Joe Frogge
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
05/24/2022

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify Patient Toilet 104 to provide minimum 18" clearance at latch side of door.
IPC 403.1 Minimum number of fixtures
Resolved
05/24/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved equivalent. (bottled water, cooler dispenser, etc)
IBC 1209.2 Finish materials
Resolved
05/24/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finishes at toilets and mop sink. If paint is used it must be epoxy based.
IBC 1606.2 Design dead load - structural
Resolved
05/24/2022

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
Building Plan Review Rejected 05/10/2022 05/11/2022
Joe Frogge
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
05/05/2022

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify Patient Toilet 104 to provide minimum 18" clearance at latch side of door.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
05/05/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved equivalent. (bottled water, cooler dispenser, etc)
IBC 1209.2 Finish materials
Corrective Action Required
05/05/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finishes at toilets and mop sink. If paint is used it must be epoxy based.
IBC 1606.2 Design dead load - structural
Corrective Action Required
05/05/2022

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
Fire Plan Review Approved with Conditions 05/10/2022 05/10/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
05/10/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Fire protection equipment identification
Corrective Action Required
05/10/2022

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. Action required- The back exterior door and interior door shall be marked Sprinkler Room and Sprinkler Room Access.
Construction documents - Fire protection systems
Corrective Action Required
05/10/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval of modifications to the sprinkler system.
Misc
Corrective Action Required
05/10/2022

[BE] 1010.1.9.10 Door hardware release of electrically locked egress doors. Door hardware release of electric locking systems shall be permitted on doors in the means of egress in any occupancy except Group H where installed and operated in accordance with all of the following: 1. The door hardware that is affixed to the door leaf has an obvious method of operation that is readily operated under all lighting conditions. 2. The door hardware is capable of being operated with one hand and shall comply with Section 1010.1.9.6. 3. Operation of the door hardware directly interrupts the power to the electric lock and unlocks the door immediately. 4. Loss of power to the electric locking system automatically unlocks the door. 5. Where panic or fire exit hardware is required by Section 1010.1.10, operation of the panic or fire exit hardware also releases the electric lock. 6. The locking system units shall be listed in accordance with UL 294. Action required- The electric strike equiped doors shall release from the egress side without key, key card, or special knowledge. Verified at inspection.
Knox box required
Corrective Action Required
05/10/2022

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- The sprinkler riser and alarm panel for the entire building are accesed through this space and access is required. If security is a concern, providing an exterior door to the sprinkler room and blocking off the interior door may be warranted, or provide a Knox key box monitored with an intrusion alarm.
Licensed Contractors Rejected 05/10/2022 05/05/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
05/05/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
05/05/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $560.00 $560.00 Paid 05/27/2022
8331507-Sewer Connection Fee $150.00 $150.00 Paid 05/27/2022
7232302-Commercial License Tax Fee $28,500.00 $28,500.00 Paid 10/26/2022
$17,340.28
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 6/14/2022 6/14/2022 06/14/2022
In-wall Inspection Failed 8/4/2022 8/4/2022 08/04/2022
Miscellaneous Correction
Corrective Action Required
08/04/2022
-Land all mc in boxes or at panel -Remove all existing unused electrical -Relocate existing electrical being used to in wall locations -Complete all electrical
Above Ceiling Inspection Partial 10/10/2022 10/10/2022 08/08/2022
Misc
Informational
08/08/2022
**Areas approved: Hard lids at bathrooms and storage
In-wall Inspection Passed 8/8/2022 8/8/2022 08/08/2022
Above Ceiling Inspection Failed 10/12/2022 10/12/2022 10/12/2022
Misc
Informational
08/08/2022
**Areas approved: Hard lids at bathrooms and storage
Misc
Corrective Action Required
10/12/2022
-INSTALL ALL LIGHT FIXTURES -SUPPORT ALL LIGHTS AT OPPOSITE CORNERS -SECURE MC ABOVE GRID
Above Ceiling Inspection Passed 10/13/2022 10/13/2022 10/13/2022
Misc
Resolved
10/13/2022
**Areas approved: Hard lids at bathrooms and storage
Misc
Resolved
10/13/2022
-INSTALL ALL LIGHT FIXTURES -SUPPORT ALL LIGHTS AT OPPOSITE CORNERS -SECURE MC ABOVE GRID
Occupancy Inspection - Codes Commercial Failed 10/25/2022 10/25/2022 10/25/2022
Miscellaneous Correction
Corrective Action Required
10/25/2022
-Commercial License Tax Fee must be paid before any occupancy can be issued -Complete all corrections for other departments -Correct threshold height greater than 1/2" at entry door -Provide GFCI protection under public sink -Restoom sign at public restroom to be 48"-60" to braille -Sidewall grab bars to extend min 54" in both restrooms -Label electrical panels -Provide non absorbant finish min 48" high in employee restroom -Set sprinkler escutcheon in employee restroom -Provide GFCI protection at receptacle near -Provide roof access to inspect RTU
Occupancy Inspection - Fire Failed 10/25/2022 10/25/2022 10/25/2022
Corrective Action Required
10/25/2022
Label exterior door with sprinkler room. Move Knox box to the rear door. Interior exit door must drop when alarm sounds for water flow in building.
Occupancy Inspection - Codes Commercial Full C of O 11/2/2022 11/2/2022 11/02/2022
Miscellaneous Correction
Resolved
11/02/2022
-Complete all corrections for other departments -Correct threshold height greater than 1/2" at entry door -Provide GFCI protection under public sink -Restoom sign at public restroom to be 48"-60" to braille -Sidewall grab bars to extend min 54" in both restrooms -Label electrical panels -Provide non absorbant finish min 48" high in employee restroom -Set sprinkler escutcheon in employee restroom -Provide GFCI protection at receptacle near -Provide roof access to inspect RTU
Occupancy Inspection - Fire Passed 11/2/2022 11/2/2022 11/02/2022
Corrective Action Required
11/02/2022
All life safety was appropriate. Okay to occupy with approval from codes.
Documents & Images
Date Uploaded File Type Document Name
04/28/2022 Application Form Commercial Building Permit and License tax Form
04/28/2022 Plans GRD-LeesSummit-Permit-FullSet
04/28/2022 Email RE_ planning question - PRCOM20221744
05/11/2022 Letter DS P/R Corrections Document
05/23/2022 Plans GRD KIRKSVILLE - RESPONSE TO COMMENTS - 5-23-2022
05/23/2022 Letter GRD KIRKSVILLE - RESPONSE TO COMMENTS - 5-18-2022
05/27/2022 Approved Plans approved - GRD KIRKSVILLE - RESPONSE TO COMMENTS - 5-23-2022
05/27/2022 Receipt Receipt for transaction:2022-004033
05/31/2022 Letter DS Building Permit
06/14/2022 Letter INSPECTION SUMMARY
06/20/2022 Green Relief FS stpd
06/20/2022 Letter Fire (Sprinkler) Plan Review
08/04/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
10/12/2022 Letter INSPECTION SUMMARY
10/13/2022 Letter INSPECTION SUMMARY
10/26/2022 Receipt Receipt for transaction:2022-008511
10/25/2022 Letter Fire Loss Reduction Form
10/29/2022 Fire Loss Reduction Form-2
11/02/2022 Letter Codes Final Certificate of Occupancy
11/02/2022 Letter Field Certificate of Occupancy
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home