Permit Application Status

PRCOM20220900


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220900
Building Permit - Commercial
Certificate of Occupancy
NEW MULTI-FAMILY
NEW 12 UNIT TOWNHOMES **Approved plans are in PRCOM20214607
03/10/2022
04/29/2022
07/27/2023
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
nwintjen@brinkmannconstructors.com, Address:nwintjen@brinkmannconstructors.com  
ALDEN PLUMBING & MECHANICAL LLC, Address:5600 W 95TH ST STE307, Phone:(816) 666-8662  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
TRI Architects, Address:9812 Manchester rd, Phone:(314) 395-9750  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 04/29/2022
Joe Frogge
Building Plan Review Approved 04/29/2022
Joe Frogge
Licensed Contractors Approved 09/17/2021 03/10/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $16,490.58 $16,490.58 Paid 04/19/2022
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 04/19/2022
7232302-Residential License Tax Fee $7,311.36 $7,311.36 Paid 04/19/2022
8331401-Water Tap Fee $43,860.00 $43,860.00 Paid 04/19/2022
8350015-Water Meter Fee $5,750.88 $5,750.88 Paid 04/19/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/25/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Service Inspection Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/12/2022
-COMPLETE INSTALLATION AT 1033 -PROVIDE 10’ of COPPER FROM METER TO BUILDING
Footing Inspection - Commercial Partial 8/24/2022 (9:15) 8/24/2022 08/24/2022
Misc
Corrective Action Required
08/24/2022
-EAST LINE COMPLETE -NORTH LINE ALL UNITS COMPLETE
Footing Inspection - Commercial Partial 8/25/2022 (10:15) 8/25/2022 08/25/2022
Misc
Corrective Action Required
08/24/2022
-EAST LINE COMPLETE -NORTH LINE ALL UNITS COMPLETE -WEST AND SOUTH UNIT 1055 COMPLETE
Footing Inspection - Commercial Partial 8/31/2022 08/31/2022
Misc
Corrective Action Required
08/25/2022
-EAST LINE COMPLETE -NORTH LINE ALL UNITS COMPLETE -WEST AND SOUTH UNIT 1055-1041 COMPLETE
Footing Inspection - Commercial Passed 9/1/2022 (1:00) 9/1/2022 09/01/2022
Misc
Resolved
09/01/2022
-EAST LINE COMPLETE -NORTH LINE ALL UNITS COMPLETE -WEST AND SOUTH UNIT 1055-1041 COMPLETE
Underslab Plumbing Inspection - Commercial Passed 9/15/2022 9/15/2022 09/15/2022
Sewer Service Inspection Partial 09/16/2022
Misc
Informational
09/16/2022
Tied this buildings northern sanitary connection into line running along with building 11 line using a 6" wye connection and 6" SDR26 to main connection. 9/9/22 ES
Sewer Service Inspection Passed 09/16/2022
Misc
Informational
09/16/2022
Tied this buildings northern sanitary connection into line running along with building 11 line using a 6" wye connection and 6" SDR26 to main connection. 9/9/22 ES Miller plumbing installed the southern sanitary connection for this building. Used 4" SDR26 pipe going into a 4" to 6" expander to make connection at 6" wye connection on main. 9/16/22 ES
Water Service Inspection Partial 09/16/2022
Misc
Corrective Action Required
07/12/2022
-COMPLETE INSTALLATION AT 1033 -PROVIDE 10’ of COPPER FROM METER TO BUILDING The majority of the meter pits for this building will need to be relocated as they will be in the driveway/paved areas. ESS/Brinkmann are researching options and will email for approval if needed. 9/16/22 ES
Underslab Electrical Inspection - Commercial Passed 9/20/2022 9/20/2022 09/20/2022
Misc
Informational
09/20/2022
CONDUIT FOR KITCHEN ISLANDS
Water Service Inspection Partial 10/21/2022
Misc
Corrective Action Required
09/16/2022
-COMPLETE INSTALLATION AT 1033 -PROVIDE 10’ of COPPER FROM METER TO BUILDING The majority of the meter pits for this building will need to be relocated as they will be in the driveway/paved areas. ESS/Brinkmann are researching options and will email for approval if needed. 9/16/22 ES ESS crew onsite working on moving meters. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. 10/21/22 ES
Water Service Inspection Partial 10/21/2022
Misc
Corrective Action Required
10/21/2022
-COMPLETE INSTALLATION AT 1033 -PROVIDE 10’ of COPPER FROM METER TO BUILDING The majority of the meter pits for this building will need to be relocated as they will be in the driveway/paved areas. ESS/Brinkmann are researching options and will email for approval if needed. 9/16/22 ES ESS crew onsite working on moving meters. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. 10/21/22am ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. 10/21/22 ES
Water Service Inspection Partial 10/21/2022
Misc
Corrective Action Required
10/21/2022
-COMPLETE INSTALLATION AT 1033 -PROVIDE 10’ of COPPER FROM METER TO BUILDING The majority of the meter pits for this building will need to be relocated as they will be in the driveway/paved areas. ESS/Brinkmann are researching options and will email for approval if needed. 9/16/22 ES ESS crew onsite working on moving meters. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. 10/21/22am ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. 10/21/22 ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. ESS crew got fire hydrant moved(tee remained in same place, but hydrant 90's to the SE and then goes into green space. They also moved/fixed and backfilled meter pits for 1039 and 1041. 10/21/22 ES
Footing Inspection - Commercial Passed 2/2/2023 (9:45) 2/2/2023 02/02/2023
All Rough Inspection - Commercial Failed 2/21/2023 2/21/2023 02/21/2023
Misc
Corrective Action Required
02/21/2023
Partial inspection of units 1055-not ready 1053- secure nm at panel, Connect bath exhaust nm, anchor bolts at sgd, 1051- secure nm at panel, protect nm at top plate guest bed, 1049-secure nm at panel, fireblock top of hvac chase 1047-Secure nm at panel, protect nm at kitchen fur out wall, h2.5 at guest bath, 1045-secure nm at panel, 1043-secure nm at panel, strap top plate at sgd, H2.5 at master closet, protect dryer duct 1041-1033 not inspected
All Rough Inspection - Commercial Partial 2/22/2023 2/22/2023 02/22/2023
Misc
Corrective Action Required
02/21/2023
Partial inspection of units 1055-not ready 1053-ok 1051-ok 1049-ok 1047-h2.5 at guest bath, 1045-ok 1043-H2.5 at master closet 1041-ok 1039-ok 1037-ok 1035-ok 1033 not inspected
All Rough Inspection - Commercial Partial 2/23/2023 2/23/2023 02/23/2023
Misc
Corrective Action Required
02/22/2023
Partial inspection of units 1055-not ready 1053-ok 1051-ok 1049-ok 1047-ok 1045-ok 1043-ok 1041-ok 1039-ok 1037-ok 1035-ok 1033 not inspected
Electrical Service Inspection Passed 2/24/2023 2/24/2023 02/24/2023
Misc
Informational
02/24/2023
Service 1 of 2: Units 1033, 1035, 1037, 1039, 1041, 1043, 1045, 1047, and House Panel Service 2 of 2: Units 1049, 1051, 1053, 1055
All Rough Inspection - Commercial Passed 2/24/2023 2/24/2023 02/24/2023
Misc
Resolved
02/24/2023
Partial inspection of units 1055-not ready 1053-ok 1051-ok 1049-ok 1047-ok 1045-ok 1043-ok 1041-ok 1039-ok 1037-ok 1035-ok 1033 not inspected
Above Ceiling Inspection Passed 02/24/2023
Rated Assembly Inspection Passed 02/24/2023
Rated Assembly Inspection Passed 02/24/2023
Occupancy Inspection - Codes Commercial Failed 5/23/2023 5/23/2023 05/23/2023
Misc
Corrective Action Required
05/23/2023
1033-Secure receptacles at garage 1035-exterior gfci at back not working, secure rec. at master bath, gap at gaurdrail over 4" 1037-Hammer arrestor at dishwasher 1041-Hammer arrestor at dishwasher, exterior gfci at back, secure receptacle at master bath 1043-Hammer arrestor at dishwasher 1047-Secure receptacle at master 1049-Secure handrail at stairs
Occupancy Inspection - Codes Commercial Ready for Temp CO 5/25/2023 5/25/2023 05/25/2023
Misc
Resolved
05/25/2023
1033-Secure receptacles at garage 1035-exterior gfci at back not working, secure rec. at master bath, gap at gaurdrail over 4" 1037-Hammer arrestor at dishwasher 1041-Hammer arrestor at dishwasher, exterior gfci at back, secure receptacle at master bath 1043-Hammer arrestor at dishwasher 1047-Secure receptacle at master 1049-Secure handrail at stairs
Occupancy Inspection - Codes Commercial Full C of O 6/24/2023 07/27/2023
Documents & Images
Date Uploaded File Type Document Name
04/19/2022 Receipt Receipt for transaction:2022-002189
04/29/2022 Letter DS Building Permit
07/12/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
09/01/2022 Letter INSPECTION SUMMARY
09/15/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
09/20/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
02/02/2023 Letter INSPECTION SUMMARY
02/21/2023 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
02/23/2023 Letter INSPECTION SUMMARY
02/24/2023 Letter INSPECTION SUMMARY
02/24/2023 Letter INSPECTION SUMMARY
02/24/2023 Letter INSPECTION SUMMARY
02/24/2023 Letter INSPECTION SUMMARY
02/24/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/25/2023 Certificate/License Codes Temporary Certificate of Occupancy
05/25/2023 Receipt Receipt for transaction:2023-003678
06/23/2023 Substantial Completion and TCO Extension Request_prcom20220900_6_23_23
07/27/2023 Letter Codes Final Certificate of Occupancy
01/18/2024 Codes Temporary Certificate of Occupancy204
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: