Summary
PRCOM20216060
Building Permit - Commercial
Final Completion
R P FIELDS INVESTMENTS LLC
ALTERATION COMMERCIAL
ROOF MOUNTED SOLAR - 18.9 KW
11/19/2021
12/17/2021
05/22/2022
12/22/2021
Locations
Contacts
THE SOLAR GUYS, Address:6114 MO-9 HWY STE C1, Phone:(913) 424-2112  
support@solarguysusa.com, Address:support@solarguysusa.com  
R P FIELDS INVESTMENTS LLC, Address:1301 TABITHA LN  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 12/22/2021 12/15/2021
Joe Frogge
Gen - Plan submittal documents
Resolved
12/15/2021

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: - Roof structure must be evaluated for new dead load imposed by new equipment. Provide report and/or design sealed and signed by structural engineer. - System design must be sealed and signed by electrical engineer.
Fire Plan Review Approved 12/22/2021 12/15/2021
Joe Frogge
Licensed Contractors Approved 12/15/2021 12/15/2021
Joe Frogge
Building Plan Review Rejected 12/03/2021 11/23/2021
Joe Frogge
Gen - Plan submittal documents
Corrective Action Required
11/23/2021

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: - Roof structure must be evaluated for new dead load imposed by new equipment. Provide report and/or design sealed and signed by structural engineer. - System design must be sealed and signed by electrical engineer.
Fire Plan Review Approved 12/03/2021 11/22/2021
Michael Weissenbach
Licensed Contractors Approved 11/19/2021 11/19/2021
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $77.88 $77.88 Paid 12/15/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Fire Department Solar Inspection Failed 12/20/2021 12/20/2021 12/20/2021
Electrical Service Inspection Failed 12/20/2021 12/20/2021 12/20/2021
Misc
Corrective Action Required
12/20/2021
-Provide required fire clearance at south side of building -Provide ground rods and conductor to main disconnect
Final Electrical Inspection - Commercial Failed 12/20/2021 12/20/2021 12/20/2021
Misc
Corrective Action Required
12/20/2021
-Provide required fire clearance at south side of building -Provide ground rods and conductor to main disconnect
Fire Department Solar Inspection Passed 12/21/2021 12/21/2021 12/21/2021
Electrical Service Inspection Passed 12/21/2021 12/21/2021 12/21/2021
Misc
Resolved
12/21/2021
-Provide required fire clearance at south side of building -Provide ground rods and conductor to main disconnect
Final Electrical Inspection - Commercial Passed 12/21/2021 12/21/2021 12/21/2021
Misc
Resolved
12/21/2021
-Provide required fire clearance at south side of building -Provide ground rods and conductor to main disconnect
Documents & Images
Date Uploaded File Type Document Name
11/19/2021 Application Form MOMFG Lee's Summt, MO(Commercial) Permit Application
11/19/2021 Plans Randy Fields(MOMFG)_UNSTAMPEDplanset 11.11.2021
11/22/2021 Letter Fire Building Plan Review
11/23/2021 Letter DS P/R Corrections Document
12/14/2021 Engineer Report/Study Fields (MOMFG)-StructuralCalculations11_24_2021
12/14/2021 Letter Fields (MOMFG)-SEStampedReviewLetter11_24_2021
12/14/2021 Plans Fields (MOMFG)-STAMPEDPermit 12_14_2021
12/15/2021 Approved Plans approved - Fields (MOMFG)-STAMPEDPermit 12_14_2021
12/15/2021 Receipt Receipt for transaction: 2021-009324
12/20/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home