Permit Application Status

PRCOM20215286


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215286
Building Permit - Commercial
Certificate of Occupancy
CHAPEL RIDGE TOWNHOMES LLC
NEW MULTI-FAMILY
NEW 3PLEX
10/08/2021
08/25/2022
06/23/2023
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
CHAPEL RIDGE TOWNHOMES LLC, Address:3701 NE AKIN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/07/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
8331506-EFHB Maybrook, Full $1,406.13 $1,406.13 Paid 08/24/2022
8331507-Sewer Connection Fee $990.00 $990.00 Paid 08/24/2022
7232302-Residential Excise Tax Fee $1,827.84 $1,827.84 Paid 08/24/2022
9110078-Valuation Fee for New 3 or 4 Family $1,731.67 $1,731.67 Paid 08/24/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/02/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rated Assembly Inspection Partial 9/6/2022 9/6/2022 09/06/2022
Misc
Corrective Action Required
09/06/2022
Attic separation wall-1st layer OK
All Rough Inspection - Commercial Failed 10/21/2022 10/21/2022 10/21/2022
Misc
Corrective Action Required
10/21/2022
Plumber still working inside. Inspection canceled
Electrical Service Inspection Passed 10/21/2022 10/21/2022 10/21/2022
Gas Service Inspection - Commercial Failed 10/21/2022 10/21/2022
Misc
Corrective Action Required
10/21/2022
Not ready
Gas Service Inspection - Commercial Passed 10/24/2022 10/24/2022 10/24/2022
Misc
Resolved
10/24/2022
Not ready
All Rough Inspection - Commercial Failed 10/24/2022 10/24/2022 10/24/2022
Misc
Corrective Action Required
10/21/2022
UNIT A: -Anchor short sill plate at front of garage -Protect water lines at laundry wall -Protect wiring located within six ft of attic access -Fb all wall plate penetrations by low voltage cables -Fully nail girder truss per plan -Strap master shower wall top plates lapped less than two ft UNIT B: -Protect 3” waste stack at half bathroom -Support plumbing above kitchen UNIT C: -Remove bonding screw from panel enclosure -Protect 3” waste stack and secure pex water line in half bathroom -Bored hole cannot be within 2” of bottom of joist -Nail dining area corner studs per code -Move the gas line away from attic access -At rear bedroom closet, strap wall top plate notched more than 50% and Fb as required -Provide b-vent shield up to insulation level -Protect water lines with BOCA plate at bottom wall plate -Fully nail girder truss per plan **OK TO INSULATE
Rated Assembly Inspection Partial 10/24/2022 10/24/2022 10/24/2022
Misc
Corrective Action Required
09/06/2022
Attic separation wall-2nd layer OK
All Rough Inspection - Commercial Failed 10/27/2022 10/27/2022 10/27/2022
Misc
Corrective Action Required
10/24/2022
UNIT A: -Strap master shower wall top plates lapped less than two ft UNIT B: UNIT C: -Move the gas line away from attic access -At rear bedroom closet, strap wall top plate notched more than 50% and Fb as required -Protect water lines with BOCA plate at bottom wall plate **OK TO INSULATE
All Rough Inspection - Commercial Failed 11/4/2022 11/4/2022 11/04/2022
Misc
Corrective Action Required
10/27/2022
UNIT A: UNIT B: UNIT C: -Move the gas line away from attic access **OK TO INSULATE
Rated Assembly Inspection Partial 11/4/2022 11/4/2022 11/04/2022
Misc
Corrective Action Required
10/24/2022
Attic separation wall-2nd layer OK Unit separation walls-1st layer OK
All Rough Inspection - Commercial Passed 11/9/2022 11/9/2022 11/09/2022
Misc
Resolved
11/09/2022
UNIT A: UNIT B: UNIT C: -Move the gas line away from attic access **OK TO INSULATE
Rated Assembly Inspection Passed 11/9/2022 11/9/2022 11/09/2022
Misc
Resolved
11/09/2022
Attic separation wall-2nd layer OK Unit separation walls-1st layer OK
Gas Service Inspection - Commercial Failed 11/10/2022 11/10/2022 11/10/2022
Misc
Corrective Action Required
11/10/2022
Unit B gas piping not holding pressure
Gas Service Inspection - Commercial Passed 11/15/2022 11/15/2022 11/15/2022
Misc
Resolved
11/15/2022
Unit B gas piping not holding pressure
Occupancy Inspection - Codes Commercial Failed 4/6/2023 4/6/2023 04/06/2023
Misc
Corrective Action Required
04/06/2023
EXTERIOR: -Seal wall penetrations, above lights -Provide tamper proof caps at AC valves -Provide flashing above wall protrusion behind service equipment -Install splash blocks -Paint gas service piping UNIT A: -Remove tape from b-vent -Install water heater P&T discharge pipe UNIT B: -Provide peep hole at front door -Route water heater P&T discharge pipe to pan UNIT C:-OK
Occupancy Inspection - Codes Commercial Ready for Temp CO 4/11/2023 4/11/2023 04/11/2023
Misc
Corrective Action Required
04/06/2023
EXTERIOR: -Seal wall penetrations, above lights -Provide flashing above wall protrusion behind service equipment -Install splash blocks -Paint gas service piping **TCO approved for all units
Occupancy Inspection - Codes Commercial Full C of O 6/23/2023 06/23/2023
Misc
Resolved
06/23/2023
EXTERIOR: -Seal wall penetrations, above lights -Provide flashing above wall protrusion behind service equipment -Install splash blocks -Paint gas service piping **TCO approved for all units
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home