Permit Application Status

PRCOM20214970


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20214970
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW TENANT FINISH
NEW TENANT FINISH FOR RESTAURANT
09/22/2021
11/23/2021
04/02/2022
04/28/2022
Locations
Contacts
VALENCIA CONST LLC, Address:4729 SW GULL POINT DR, Phone:(816) 537-7482  
greg@valencia-construction.com  
DONALDSON MECHANICAL INC, Address:934 SE 7TH TER, Unit B, Phone:(816) 246-9500  
ROZIER ELECTRIC, Address:1608 SW JEFFERSON ST, Phone:(816) 246-9000  
HEARTLAND PLUMBING INC, Address:800 S CREEKSIDE DR, Phone:(913) 856-5846  
New Line Stuio Architecture + Interiors, Address:3965 W. 83rd St, Phone:(913) 318-5030  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Roots Seasonal Cuisine, Address:940 NW Pryor Rd, suite M, Phone:(816) 918-1856  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/27/2021 12/27/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
12/27/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 12/27/2021 12/27/2021
Michael Weissenbach
Sprinkler Plan Review Released for Construction 12/15/2021 12/15/2021
Michael Weissenbach
Licensed Contractors Approved 10/13/2021 11/22/2021
Joe Frogge
LC - MEP Subs
Resolved
11/22/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 10/13/2021 10/07/2021
Michael Weissenbach
Posting of occupant load
Corrective Action Required
10/06/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 282.
Construction documents for fire alarm systems
Corrective Action Required
10/06/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
10/06/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/06/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 for testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
10/06/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide two 2A10BC Fire Extinguishers.
Miscellaneous Correction
Resolved
10/07/2021

(Action Required) 2018 IFC 5307.3 Provide specs on CO2 tank. If over 100 pounds gas detection will be required.
Duct smoke detectors
Resolved
10/07/2021

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Provide duct detection with CFM over 2000. (If not Existing)
Building Plan Review Approved with Conditions 10/13/2021 10/06/2021
Joe Frogge
Health Dept Inspection
Corrective Action Required
10/06/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 10/6/21 - acknowledged in letter
IBC 602.1 Type of Construction - general
Resolved
10/06/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Show how 1hr protection will be maintained at structural components. (this is 5A construction - re: columns at Serv 1 & Private Dining)
IMC 506.5.3 Grease fan mounting hinge
Resolved
10/06/2021

2018 IMC 506.5.3 Exhaust fan mounting. Up-blast fans serving Type I hoods and installed in a vertical or horizontal position shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning and shall be equipped with a means of restraint to limit the swing of the fan on its hinge. The ductwork shall extend not less than 18 inches above the roof surface. Action required: Provide hinged connection at type I hood fan for cleaning. 10/6/21 - per architect - "Fan is not upblast, it is a utility set and has Easily Accessible Clean Out Door and Motor Access from 3 Sides"
Health Department Review Approved 10/04/2021
Joe Frogge
Building Plan Review Rejected 10/04/2021 09/30/2021
Joe Frogge
Health Dept Review
Resolved
10/04/2021

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
09/30/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
IBC 602.1 Type of Construction - general
Corrective Action Required
09/30/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Show how 1hr protection will be maintained at structural components. (this is 5A construction - re: columns at Serv 1 & Private Dining)
IMC 506.5.3 Grease fan mounting hinge
Corrective Action Required
09/30/2021

2018 IMC 506.5.3 Exhaust fan mounting. Up-blast fans serving Type I hoods and installed in a vertical or horizontal position shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning and shall be equipped with a means of restraint to limit the swing of the fan on its hinge. The ductwork shall extend not less than 18 inches above the roof surface. Action required: Provide hinged connection at type I hood fan for cleaning.
Fire Plan Review Rejected 10/04/2021 09/30/2021
Joe Frogge
Posting of occupant load
Corrective Action Required
09/30/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 282.
Construction documents for fire alarm systems
Corrective Action Required
09/30/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
09/30/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
09/30/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 for testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/30/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide two 2A10BC Fire Extinguishers.
Miscellaneous Correction
Corrective Action Required
09/30/2021

(Action Required) 2018 IFC 5307.3 Provide specs on CO2 tank. If over 100 pounds gas detection will be required.
Duct smoke detectors
Corrective Action Required
09/30/2021

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Provide duct detection with CFM over 2000. (If not Existing)
Licensed Contractors Rejected 09/22/2021 09/30/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/30/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 10/04/2021 09/24/2021
Michael Weissenbach
Posting of occupant load
Corrective Action Required
09/24/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 282.
Construction documents for fire alarm systems
Corrective Action Required
09/24/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
09/24/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
09/24/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 for testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/24/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide two 2A10BC Fire Extinguishers.
Miscellaneous Correction
Corrective Action Required
09/24/2021

(Action Required) 2018 IFC 5307.3 Provide specs on CO2 tank. If over 100 pounds gas detection will be required.
Duct smoke detectors
Corrective Action Required
09/24/2021

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Provide duct detection with CFM over 2000. (If not Existing)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $4,980.00 $4,980.00 Paid 11/23/2021
8331507-Sewer Connection Fee $570.00 $570.00 Paid 11/23/2021
7232302-Commercial License Tax Fee $14,857.50 $14,857.50 Paid 04/26/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 12/22/2021 12/22/2021 12/22/2021
Misc
Informational
12/22/2021
- TOP OUT SHEETROCK WALL BETWEEN DINING & KITCHEN -
In-wall Inspection Failed 1/24/2022 1/24/2022 01/24/2022
Misc
Informational
01/24/2022
- TOP OUT SHEETROCK WALL BETWEEN DINING & KITCHEN -
Miscellaneous Correction
Corrective Action Required
01/24/2022
Provide mid point support vertical DWV 2" & smaller Provide boca plates mens restroom
Hood/Duct Inspection Partial 1/24/2022 1/24/2022 01/24/2022
Misc
Informational
01/24/2022
PARTIAL GREASE DUCT FROM CHASE TO ROOF TO BACKORDERED HOOD WELDS APPROVED FOR 1ST LAYER WRAP
In-wall Inspection Passed 1/26/2022 1/26/2022 01/26/2022
Misc
Informational
01/24/2022
- TOP OUT SHEETROCK WALL BETWEEN DINING & KITCHEN -
Miscellaneous Correction
Resolved
01/26/2022
Gas Piping Inspection - Commercial Passed 1/26/2022 01/26/2022
Gas Service Inspection - Commercial Passed 1/26/2022 01/26/2022
Above Ceiling Inspection Partial 2/1/2022 02/01/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/01/2022
HARD LID AREAS OK TO COVER
Hood/Duct Inspection Partial 2/23/2022 02/23/2022
Misc
Informational
01/24/2022
PARTIAL GREASE DUCT FROM CHASE TO ROOF TO BACKORDERED HOOD WELDS APPROVED FOR 1ST LAYER WRAP - WELDS APPROVED FOR 1ST LAYER WRAP ABOVE HOOD, 1ST LAYER WRAP APPROVED FROM HOOD TO CHASE TO ROOF -
Hood/Duct Inspection Partial 2/24/2022 2/24/2022 02/24/2022
Misc
Informational
02/23/2022
PARTIAL GREASE DUCT FROM CHASE TO ROOF TO BACKORDERED HOOD WELDS APPROVED FOR 1ST LAYER WRAP - WELDS APPROVED FOR 1ST LAYER WRAP ABOVE HOOD, 1ST LAYER WRAP APPROVED FROM HOOD TO CHASE TO ROOF - - 1ST LAYER WRAP COMPLETE OK FOR 2ND LAYER -
Hood/Duct Inspection Passed 3/17/2022 03/17/2022
Misc
Informational
02/24/2022
PARTIAL GREASE DUCT FROM CHASE TO ROOF TO BACKORDERED HOOD WELDS APPROVED FOR 1ST LAYER WRAP - WELDS APPROVED FOR 1ST LAYER WRAP ABOVE HOOD, 1ST LAYER WRAP APPROVED FROM HOOD TO CHASE TO ROOF - - 1ST LAYER WRAP COMPLETE OK FOR 2ND LAYER - - 2nd layer wrap & banding approved -
Above Ceiling Inspection Partial 3/17/2022 3/17/2022 03/17/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/01/2022
HARD LID AREAS OK TO COVER KITCHEN AREA & MECHANICAL ROOM OK FOR CEILING TILE
Above Ceiling Inspection Passed 3/22/2022 3/22/2022 03/22/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/17/2022
HARD LID AREAS OK TO COVER KITCHEN AREA & MECHANICAL ROOM OK FOR CEILING TILE - BAR,DINING,RESTROOMS -
Alarm Test Passed 4/26/2022 04/26/2022
Alternate Protection Systems Inspection Passed 4/26/2022 04/26/2022
Corrective Action Required
06/21/2022
All life safety was appropriate. Okay to occupy with approval form codes.
Occupancy Inspection - Codes Commercial Failed 4/27/2022 4/27/2022 04/27/2022
Miscellaneous Correction
Corrective Action Required
04/27/2022
Insulate under sink plumbing in restrooms Provide safety chain deep fryers, range, cooktop,grill Upload health dept inspection to permit OK TO STOCK & TRAIN
Occupancy Inspection - Fire Passed 4/27/2022 4/27/2022 04/27/2022
Occupancy Inspection - Codes Commercial Full C of O 4/28/2022 4/28/2022 04/28/2022
Miscellaneous Correction
Resolved
04/28/2022
Documents & Images
Date Uploaded File Type Document Name
09/22/2021 Application Form Root Permit App
09/22/2021 Application Form Roots License tax app
09/23/2021 Plans ROOTS PERMIT COMPLETE SET 09172021
09/24/2021 Letter Fire Building Plan Review
09/30/2021 Letter License Tax Bill
09/30/2021 Letter DS P/R Corrections Document
10/04/2021 Email New Food Establishment Plan Review - Approved FTG_0001600
10/06/2021 CarboMizer550
10/06/2021 Plans ROOTS PERMIT SET REVISION 01 - 10062021
10/06/2021 Letter DS P_R Corrections Document NLS
10/06/2021 CO2 Meter Data Sheet
10/07/2021 Letter Fire Building Plan Review
11/03/2021 Plans ROOTS PERMIT SET REVISION 01 - 10062021 Complete R
11/03/2021 Approved Plans approved - ROOTS PERMIT SET REVISION 01 - 10062021 Complete R
11/23/2021 Receipt Receipt for transaction:2021-008907
11/23/2021 Receipt Receipt for transaction:2021-008915
11/23/2021 Letter DS Building Permit
12/15/2021 Letter Fire (Sprinkler) Plan Review
12/22/2021 Letter INSPECTION SUMMARY
12/27/2021 15815 Roots Seasonal Cuisine FP PE Stamp
12/27/2021 Letter Fire (Sprinkler) Plan Review
12/27/2021 Roots Restaurant FA 12 15 21 PE Stamp
12/27/2021 Roots Restaurant FA Calcs PE Stamp
12/27/2021 Letter Fire (Alarm) Plan Review Notice
01/24/2022 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
02/01/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter Fire Loss Reduction Form
04/26/2022 Letter Fire Loss Reduction Form
04/26/2022 Receipt Receipt for transaction:2022-002427
04/26/2022 Letter License Tax Bill
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Roots Seasonal Cuisine Jackson county health Dept_
04/28/2022 Letter Field Certificate of Occupancy
04/28/2022 Letter Codes Final Certificate of Occupancy
06/21/2022 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home