Permit Application Status

PRCOM20210282


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20210282
Building Permit - Commercial
Closed
REORGANIZED SCHOOL DISTRICT NO 7
ALTERATION COMMERCIAL
DIVIDE ONE LARGE CLASSROOM INTO THREE SMALLER CLASSROOMS- inwall inspection only- No final permit closed
01/20/2021
01/21/2021
07/19/2021
04/02/2024
Locations
Contacts
Nouveau Construction & Technology Services, Address:2441 Lacy Ln  
DONALDSON MECHANICAL INC, Address:934 SE 7TH TER, Unit B, Phone:(816) 246-9500  
ALL PRO ELECTRICAL TECHNOLOGY INC, Address:94 SE 501, Phone:(660) 747-0090  
GOULD EVANS, Address:4041 MILL STREET, Phone:(816) 701-5315  
REORGANIZED SCHOOL DISTRICT NO 7, Address:301 NE TUDOR RD  
smetana@ucmo.edu, Address:smetana@ucmo.edu  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/21/2021 01/21/2021
Joe Frogge
LC - General Contractor
Resolved
01/21/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
Fire Plan Review Approved with Conditions 01/28/2021 01/21/2021
Michael Weissenbach
Miscellaneous Correction
Resolved
01/21/2021

(Action Required) Provide a code analysis for review.
Construction documents for fire alarm systems
Corrective Action Required
01/21/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
01/21/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
01/21/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Approved 01/28/2021 01/21/2021
Joe Frogge
Code analysis required
Resolved
01/21/2021

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis.
Fire Plan Review Rejected 02/01/2021 01/20/2021
Michael Weissenbach
Miscellaneous Correction
Corrective Action Required
01/20/2021

(Action Required) Provide a code analysis for review.
Building Plan Review Rejected 02/01/2021 01/20/2021
Joe Frogge
Code analysis required
Corrective Action Required
01/20/2021

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis.
Licensed Contractors Rejected 01/20/2021 01/20/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
01/20/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
r
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $509.00 $509.00 Paid 01/21/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 2/2/2021 2/2/2021 02/02/2021
Misc
Informational
02/02/2021
- partition walls 2nd floor -
Documents & Images
Date Uploaded File Type Document Name
01/20/2021 Specifications 2020-10-05 MIC Renovation Final Specifications
01/20/2021 Plans 2020-10-23 MIC Renovation Revised Final Bid Set
01/20/2021 Application Form Commercial Permit Application
01/20/2021 Letter License Tax Not Applicable
01/20/2021 Letter Fire Building Plan Review
01/20/2021 Letter DS P/R Corrections Document
01/20/2021 Plans 2021-01-20 MIC Renovation LS Permit Set
01/21/2021 Letter Fire Building Plan Review
01/21/2021 Approved Plans approved - 2021-01-20 MIC Renovation LS Permit Set
01/21/2021 Receipt Receipt for transaction:2021-000353
01/21/2021 Letter DS Building Permit
02/02/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter Codes 180 Day Letter
02/02/2022 Letter Codes 140 Day Letter
03/14/2022 Letter Codes 180 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home