Permit Application Status

PRCOM20210199


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20210199
Building Permit - Commercial
Final Completion
SUMMIT WOODS SPE LLC
ALTERATION COMMERCIAL
CONSTRUCT WHITE BOX FOR FUTURE TENANT THAT SELLS FITNESS EQUIPMENT
01/14/2021
02/23/2021
07/20/2021
04/02/2024
Locations
Contacts
CAMM CONSTRUCTION INC, Address:4006 E 137TH TERR, Phone:(816) 607-3602  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
CADSTONE STUDIO ARCHITECTURE, Address:1213 W 32ND ST, Phone:(816) 550-0130  
SUMMIT WOODS SPE LLC, Address:1 E WASHINGTON ST STE 300  
MIKE@CAMMCONSTRUCTIONINC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 04/20/2021 04/20/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
04/20/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test.
Building Plan Review Approved 02/01/2021 02/22/2021
Joe Frogge
Miscellaneous Correction
Resolved
02/22/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 1/25/21 - acknowledged in letter.
Gen - Plan submittals 2018 codes
Resolved
01/25/2021

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Modify cover sheet to show correct IPC code year.
IPC 403.1 Minimum number of fixtures
Resolved
01/25/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Drinking fountain (or approved alternate) will be required for future tenant. Provide drinking fountain (or approved alternate) or request deferral to tenant finish permit.
Licensed Contractors Approved 01/25/2021 02/22/2021
Joe Frogge
LC - MEP Subs
Resolved
02/22/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/25/21 - acknowledged in letter.
LC - General Contractor
Resolved
02/22/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 1/25/21 - acknowledged in letter.
Fire Plan Review Approved with Conditions 02/01/2021 01/25/2021
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
01/25/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
01/25/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide electronic PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
01/25/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fire Plan Review Approved with Conditions 01/27/2021 01/20/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
01/20/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
01/20/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide electronic PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
01/20/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 01/27/2021 01/20/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
01/20/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Gen - Plan submittals 2018 codes
Corrective Action Required
01/20/2021

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Modify cover sheet to show correct IPC code year.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
01/20/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Drinking fountain (or approved alternate) will be required for future tenant. Provide drinking fountain (or approved alternate) or request deferral to tenant finish permit.
Licensed Contractors Rejected 01/27/2021 01/20/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/20/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
01/20/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $480.00 $480.00 Paid 02/23/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 05/03/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 4/9/2021 4/9/2021 04/09/2021
Misc
Corrective Action Required
04/09/2021
- PROVIDE BOCA PLATES BACKSIDE OF RESTROOMS - - NAIL BOTTOM PLATE AT PLATE BREAK NEAR RESTROOMS -
In-wall Inspection Not Ready 4/12/2021 4/12/2021 04/12/2021
Misc
Corrective Action Required
04/09/2021
- PROVIDE BOCA PLATES BACKSIDE OF RESTROOMS - - NAIL BOTTOM PLATE AT PLATE BREAK NEAR RESTROOMS -
In-wall Inspection Passed 4/14/2021 4/14/2021 04/14/2021
Misc
Resolved
04/14/2021
Above Ceiling Inspection Failed 4/26/2021 4/26/2021 04/26/2021
Miscellaneous Correction
Corrective Action Required
04/26/2021
-Patch holes in existing 1 hour separation walls
Above Ceiling Inspection Passed 4/27/2021 4/27/2021 04/27/2021
Miscellaneous Correction
Resolved
04/27/2021
Final Inspection - Commercial Failed 4/30/2021 4/30/2021 04/30/2021
Misc
Corrective Action Required
04/30/2021
COMPLETE LABELING OF SERVICE PANEL INSULATE DRAIN UNDER SINK WOMENS RESTROOM REMOVE ABANDONED MC CABLE BACK ROOM CEILING ( OR LAND IN A BOX WITH COVER PLATE )
Final Inspection - Commercial Failed 5/3/2021 5/3/2021 05/03/2021
Misc
Corrective Action Required
04/30/2021
PAY FEES FIRE STILL PENDING
Occupancy Inspection - Fire Failed 4/30/2021 05/04/2021
Alarm Test Failed 5/3/2021 05/04/2021
Occupancy Inspection - Fire Passed 5/13/2021 05/13/2021
Alarm Test Passed 5/13/2021 05/13/2021
Documents & Images
Date Uploaded File Type Document Name
01/14/2021 Application Form Commercial Permit Application
01/14/2021 Plans Summitwoods Crossing 1740 white box permit set 011121
01/20/2021 Letter Fire Building Plan Review
01/21/2021 Letter DS P/R Corrections Document
01/25/2021 Letter City Response letter 012521
01/25/2021 Plans Summitwoods Crossing 1740 white box permit set 012521 rev 1
01/25/2021 Approved Plans approved - Summitwoods Crossing 1740 white box permit set 012521 rev 1
02/22/2021 Application Form Camm LT
02/23/2021 Receipt Receipt for transaction:2021-000845
02/23/2021 Letter DS Building Permit
04/09/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
04/20/2021 Letter Fire (Sprinkler) Plan Review
04/26/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
05/03/2021 Letter INSPECTION SUMMARY
05/03/2021 Receipt Receipt for transaction:2021-002403
05/04/2021 Letter Fire Loss Reduction Form
05/04/2021 Letter Fire Loss Reduction Form
05/13/2021 Letter Fire Loss Reduction Form
05/13/2021 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home