Permit Application Status

PRCOM20210082


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20210082
Building Permit - Commercial
Final Completion
BFRE LLC
ALTERATION COMMERCIAL
ROOF MOUNTED SOLAR - 100.0 KW
01/07/2021
01/20/2021
07/07/2021
03/05/2021
Locations
Contacts
ARTISUN SOLAR LLC, Address:5790 W 95TH ST STE 340, Phone:(816) 265-1786  
BFRE LLC, Address:3200 NW SOUTH OUTER RD  
kirk@artisunsolar.com, Address:kirk@artisunsolar.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/19/2021
Joe Frogge
LC - MEP Subs
Resolved
01/19/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Artusun must be licensed and listed on permit prior to issuance.
Building Plan Review Approved 01/26/2021 01/19/2021
Joe Frogge
IBC 1606.2 Design dead load - structural
Resolved
01/19/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Provide the following: - Engineer’s report, sealed and signed, to verify that existing roof structure will support additional load. - Roof connection/anchoring details sealed and signed by engineer.
Misc
Resolved
01/19/2021

Inadequate information to complete review. Action required: Provide cut sheets for all major electrical equipment. Panels, inverters, etc.
Fire Plan Review Approved 01/26/2021 01/19/2021
Joe Frogge
Fire Plan Review Approved 01/12/2021 01/07/2021
Michael Weissenbach
Building Plan Review Rejected 01/12/2021 01/07/2021
Joe Frogge
IBC 1606.2 Design dead load - structural
Corrective Action Required
01/07/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Provide the following: - Engineer’s report, sealed and signed, to verify that existing roof structure will support additional load. - Roof connection/anchoring details sealed and signed by engineer.
Misc
Corrective Action Required
01/07/2021

Inadequate information to complete review. Action required: Provide cut sheets for all major electrical equipment. Panels, inverters, etc.
Licensed Contractors Rejected 01/12/2021 01/07/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/07/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Artusun must be licensed and listed on permit prior to issuance.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $659.60 $659.60 Paid 01/20/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Fire Department Solar Inspection Passed 3/5/2021 03/05/2021
Electrical Service Inspection Passed 3/5/2021 03/05/2021
Final Electrical Inspection - Commercial Passed 3/5/2021 03/05/2021
Documents & Images
Date Uploaded File Type Document Name
01/07/2021 Plans Lee summit honda stamp (1)
01/07/2021 Application Form app for honda
01/07/2021 Letter Fire Building Plan Review
01/08/2021 Letter DS P/R Corrections Document
01/19/2021 APSmart RSD-S-PLC DS
01/19/2021 Boviet Datasheet -365-385W_BVM6612M
01/19/2021 SE_DS_Symo_Advanced_USA_EN
01/19/2021 Engineer Report/Study C1 Ltr StructAssess_LeesSummitHonda
01/19/2021 Approved Plans approved - Lee summit honda stamp (1)
01/20/2021 Receipt Receipt for transaction:2021-000290
01/20/2021 Letter DS Building Permit
03/05/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home