PRCOM20202959
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
NEW OTHER (COMMERCIAL)
THIS PERMIT IS FOR A PARKING LOT EXPANSION, LIGHTING AND GENERATOR INSTALLATION. LOCATED ON THE NE CORNER OF THE PROPERTY Building inspections inspected under building permit 0845
09/14/2020
09/24/2020
06/08/2021
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
Travis Grimes, Address:McCown Gordon Construction, Phone:(816) 960-1111  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 09/28/2020 09/24/2020
Mike Weisenborn
Fire Plan Review Approved with Conditions 09/28/2020 09/24/2020
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
09/24/2020

Provide documentation on the diesel tank for review and approval prior to installation.
Miscellaneous Correction
Corrective Action Required
09/24/2020

Provide documentation on placarding of the diesel tank for review and approval prior to installation.
Licensed Contractors Approved 09/14/2020 09/24/2020
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $0.00 $0.00 Paid 09/24/2020
$594.00
9110068-Storm Fee $0.00 $0.00 Paid 09/24/2020
$2,036.18
9110081-Paved Surface Inspection Fee $0.00 $0.00 Paid 09/24/2020
$3,098.19
9110071-Site Grading Fee $0.00 $0.00 Paid 09/24/2020
$12,467.91
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $40.00 $0.00 $40.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $325.00 $0.00 $325.00 Not Paid


$365.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Pipe Partial 9/30/2020 9/30/2020 09/30/2020
Misc
Informational
09/28/2020
9-28-20 2:58pm Rodrigues is on site setting storm pipe. They have 8 sections of pipe laid and it is on top of the ground. Per plans they should digging out not laying on top. Going forward They will need to have compaction. 9-29-20 9:00am Rodrigues is on hold on installing storm pipe. They need more fill and compaction test will be needed. 9-30-20 10:19am psi is on site to for compaction tests. They have placed 6 sticks of HDPE on storm line 2. They are pouring the collar at the junction box. 2:11pm They have line 2 installed to the curb inlet and are backfilling.
Storm - Pipe Partial 10/1/2020 10/1/2020 10/01/2020
Misc
Informational
09/30/2020
9-28-20 2:58pm Rodrigues is on site setting storm pipe. They have 8 sections of pipe laid and it is on top of the ground. Per plans they should digging out not laying on top. Going forward They will need to have compaction. 9-29-20 9:00am Rodrigues is on hold on installing storm pipe. They need more fill and compaction test will be needed. 9-30-20 10:19am psi is on site to for compaction tests. They have placed 6 sticks of HDPE on storm line 2. They are pouring the collar at the junction box. 2:11pm They have line 2 installed to the curb inlet and are backfilling. 10-1-20 7:45am They are backfilling the storm pipe and will resume installing storm pipe after. 10:38am They have installed 10 sticks of storm pipe at this time. They are using plenty of rock and will have PSI doing compaction testing when they backfill. 11:20am They are pouring the collar for the storm inlet on line 2.
Storm - Pipe Partial 10/5/2020 10/5/2020 10/05/2020
Misc
Informational
10/01/2020
9-28-20 2:58pm Rodrigues is on site setting storm pipe. They have 8 sections of pipe laid and it is on top of the ground. Per plans they should digging out not laying on top. Going forward They will need to have compaction. 9-29-20 9:00am Rodrigues is on hold on installing storm pipe. They need more fill and compaction test will be needed. 9-30-20 10:19am psi is on site to for compaction tests. They have placed 6 sticks of HDPE on storm line 2. They are pouring the collar at the junction box. 2:11pm They have line 2 installed to the curb inlet and are backfilling. 10-1-20 7:45am They are backfilling the storm pipe and will resume installing storm pipe after. 10:38am They have installed 10 sticks of storm pipe at this time. They are using plenty of rock and will have PSI doing compaction testing when they backfill. 11:20am They are pouring the collar for the storm inlet on line 2. 10-5-20 They have placed 9 sticks of storm pipe and set box 3.1. They are backfilling and will pour collars.
Storm - Pipe Passed 10/7/2020 10/7/2020 10/07/2020
Misc
Informational
10/05/2020
9-28-20 2:58pm Rodrigues is on site setting storm pipe. They have 8 sections of pipe laid and it is on top of the ground. Per plans they should digging out not laying on top. Going forward They will need to have compaction. 9-29-20 9:00am Rodrigues is on hold on installing storm pipe. They need more fill and compaction test will be needed. 9-30-20 10:19am psi is on site to for compaction tests. They have placed 6 sticks of HDPE on storm line 2. They are pouring the collar at the junction box. 2:11pm They have line 2 installed to the curb inlet and are backfilling. 10-1-20 7:45am They are backfilling the storm pipe and will resume installing storm pipe after. 10:38am They have installed 10 sticks of storm pipe at this time. They are using plenty of rock and will have PSI doing compaction testing when they backfill. 11:20am They are pouring the collar for the storm inlet on line 2. 10-5-20 They have placed 9 sticks of storm pipe and set box 3.1. They are backfilling and will pour collars. 10-7-20 10:40am They are pouring the collars for box 3.1.1:46pm They have poured the invert. They have installed storm line 1 and have backfilled. The rip rap is installed.
Storm - Material Verification Passed 10/12/2020
Grading/Excavation/Fill Inspection Partial 10/12/2020 10/12/2020 10/12/2020
Misc
Informational
10/12/2020
10-12-20 7:40am They are bringing in dirt to get to grade.
Grading/Excavation/Fill Inspection Partial 10/13/2020
Misc
Informational
10/12/2020
10-12-20 7:40am They are bringing in dirt to get to grade. 10-13-20 9:20am They are working on grade at this time.
Grading/Excavation/Fill Inspection Partial 10/14/2020
Misc
Informational
10/13/2020
10-12-20 7:40am They are bringing in dirt to get to grade. 10-13-20 9:20am They are working on grade at this time. 10-14-20 8:50AM The crew are still working on grading the site.
Site Visit Partial 10/15/2020
Misc
Informational
10/15/2020
10-15-20 8:08am There is no work on site at this time.
Grading/Excavation/Fill Inspection Partial 10/15/2020 10/15/2020 10/15/2020
Misc
Informational
10/14/2020
10-12-20 7:40am They are bringing in dirt to get to grade. 10-13-20 9:20am They are working on grade at this time. 10-14-20 8:50AM The crew are still working on grading the site. 10-15-20 2:58PM There is no work on site today.
Grading/Excavation/Fill Inspection Partial 10/16/2020
Misc
Informational
10/15/2020
10-12-20 7:40am They are bringing in dirt to get to grade. 10-13-20 9:20am They are working on grade at this time. 10-14-20 8:50AM The crew are still working on grading the site. 10-15-20 2:58PM There is no work on site today. 10-16-20 8:45AM Rodriguez is on site. They are grading the site and adding fill.
Grading/Excavation/Fill Inspection Partial 10/20/2020 10/20/2020 10/20/2020
Misc
Informational
10/16/2020
10-12-20 7:40am They are bringing in dirt to get to grade. 10-13-20 9:20am They are working on grade at this time. 10-14-20 8:50AM The crew are still working on grading the site. 10-15-20 2:58PM There is no work on site today. 10-16-20 8:45AM Rodriguez is on site. They are grading the site and adding fill. 10-20-20 8:55am There is no work taking place today at this time.
Site Visit Partial 10/22/2020
Misc
Informational
10/15/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today.
Erosion Control Inspection Partial 10/23/2020 10/23/2020 10/23/2020
Misc
Informational
10/23/2020
10-23-20 9:35am Raining. All erosion controls are in place and working at this time.
Site Visit Partial 10/23/2020 10/23/2020 10/23/2020
Misc
Informational
10/22/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today.
Site Visit Partial 10/27/2020
Misc
Informational
10/23/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today.
Site Visit Partial 10/28/2020
Misc
Informational
10/27/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today.
Water Line - Construction Inspection Partial 11/04/2020
Misc
Informational
11/04/2020
11-4-20 10:45am Rodriguez is on site moving the irrigation valve.
Site Visit Partial 10/30/2020 10/30/2020 11/04/2020
Misc
Informational
10/28/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today.
Site Visit Partial 11/05/2020
Misc
Informational
11/04/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site.
Site Visit Partial 11/06/2020
Misc
Informational
11/05/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time.
Site Visit Partial 11/09/2020
Misc
Informational
11/06/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today.
Erosion Control Inspection Partial 11/10/2020 11/10/2020 11/10/2020
Misc
Informational
10/23/2020
10-23-20 9:35am Raining. All erosion controls are in place and working at this time. 11-10-20 2:41pm All erosion controls are in place and working at this time.
Site Visit Partial 11/11/2020
Misc
Informational
11/09/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation.
Site Visit Partial 11/12/2020
Misc
Informational
11/11/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time.
Site Visit Partial 11/13/2020
Misc
Informational
11/12/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time.
Site Visit Partial 11/16/2020
Misc
Informational
11/13/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site.
Site Visit Partial 11/17/2020 11/17/2020 11/17/2020
Misc
Informational
11/16/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site.
Site Visit Partial 11/18/2020 11/18/2020 11/18/2020
Misc
Informational
11/17/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side.
Site Visit Partial 11/19/2020
Misc
Informational
11/18/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time.
Site Visit Partial 11/19/2020
Misc
Informational
11/19/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner.
Site Visit Partial 11/20/2020 11/20/2020 11/20/2020
Misc
Informational
11/19/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot.
Site Visit Partial 11/23/2020 11/23/2020 11/23/2020
Misc
Informational
11/20/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading.
Erosion Control Inspection Partial 11/23/2020 11/23/2020 11/23/2020
Misc
Informational
11/10/2020
10-23-20 9:35am Raining. All erosion controls are in place and working at this time. 11-10-20 2:41pm All erosion controls are in place and working at this time. 11-23-20 1:36pm All of the erosion controls are in place and working at this time.
Site Visit Partial 11/24/2020 11/24/2020 11/24/2020
Misc
Informational
11/23/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather.
Erosion Control Inspection Partial 11/25/2020
Misc
Informational
11/23/2020
10-23-20 9:35am Raining. All erosion controls are in place and working at this time. 11-10-20 2:41pm All erosion controls are in place and working at this time. 11-23-20 1:36pm All of the erosion controls are in place and working at this time. 11-25-20 9:38am The rain has stopped and the erosion controls are in place and working at this time.
Site Visit Partial 11/30/2020 11/30/2020 11/30/2020
Misc
Informational
11/24/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line.
Pavement-Aggregate Base Partial 12/4/2020 12/4/2020 12/04/2020
Misc
Informational
12/04/2020
12-4-20 11:07am They have the Geo-grid in place and are laying the base rock.
Pavement-Proof Roll Partial 12/7/2020 12/7/2020 12/07/2020
Misc
Informational
12/07/2020
12-7-20 8:25am The temperature outside is 33 degrees and the ground is shooting 29 to 30 with the temp gun. We can not proof roll at this time.
Pavement-Proof Roll Partial 12/07/2020
Misc
Informational
12/07/2020
12-7-20 8:25am The temperature outside is 33 degrees and the ground is shooting 29 to 30 with the temp gun. 12-7-20 We can not proof roll at this time. 2:40pm We proof rolled the parking lot for curb and parking. It has passed everywhere with one correction that needs to be made at the north east corner at the storm box. Approximately 30’ will need reworked.
Pavement-Curb Construction Partial 12/8/2020 12/8/2020 12/08/2020
Misc
Informational
12/08/2020
12-8-20 11:24am They are pouring the curb with KCMMB4K mix and are using white cure. 1:23pm All of the machine curb is poured. They will start working on setting up hand pours.
Pavement-Curb Construction Partial 12/9/2020 12/9/2020 12/09/2020
Misc
Informational
12/08/2020
12-8-20 11:24am They are pouring the curb with KCMMB4K mix and are using white cure. 1:23pm All of the machine curb is poured. They will start working on setting up hand pours. 12-9-20 8:59AM They are setting up more hand pours and will be pouring at approximately 9:30am. They are using white cure. 11:11am George Shaw Have poured the curb at the west side of the site and are now pouring at the east side of the site. They are working on the radius and storm box throat.
Pavement-Curb Construction Partial 12/09/2020
Misc
Informational
12/09/2020
12-8-20 11:24am They are pouring the curb with KCMMB4K mix and are using white cure. 1:23pm All of the machine curb is poured. They will start working on setting up hand pours. 12-9-20 8:59AM They are setting up more hand pours and will be pouring at approximately 9:30am. They are using white cure. 11:11am George Shaw Have poured the curb at the west side of the site and are now pouring at the east side of the site. They are working on the radius and storm box throat. 2:20pm They are finishing up on the curb at the west side. They will cure and curb will be complete.
Site Visit Partial 12/10/2020 12/10/2020 12/10/2020
Misc
Informational
11/30/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs.
Erosion Control Inspection Partial 12/11/2020
Misc
Informational
11/25/2020
10-23-20 9:35am Raining. All erosion controls are in place and working at this time. 11-10-20 2:41pm All erosion controls are in place and working at this time. 11-23-20 1:36pm All of the erosion controls are in place and working at this time. 11-25-20 9:38am The rain has stopped and the erosion controls are in place and working at this time. 12-11-20 7:53am Light rain. All erosion controls are in place and working at this time.
Site Visit Partial 12/14/2020
Misc
Informational
12/10/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time.
Site Visit Partial 12/15/2020 12/15/2020 12/15/2020
Misc
Informational
12/14/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place.
Site Visit Partial 12/16/2020
Misc
Informational
12/15/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base.
Site Visit Partial 12/17/2020
Misc
Informational
12/16/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20.
Street - Wedge Lift Partial 12/19/2020 12/19/2020 12/19/2020
Misc
Informational
12/19/2020
12-19-20 8:50am The first truck has arrived. Seal-O-Matic is laying the 4” base for the parking lot. The air temperature is 34 degrees and the base is 35. They have tac coated the curb and are starting on the far west side. Temperature out of the truck are 270 degrees. 300 on the ground. I took a picture of one of the base tickets Seal- O-Matic going to email copies of all of them. PSI is on site for testing. 11:39am They have worked there way around to the south east side of the site and all temps are good. 1:33pm They have completed the parking lot and are moving to the south of St. Luke’s for a patch.
Site Visit Partial 12/19/2020 12/19/2020 12/21/2020
Misc
Informational
12/17/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Pavement-Surface Partial 12/22/2020 12/22/2020 12/22/2020
Misc
Informational
12/22/2020
12-22-20 2:03pm The first truck has arrived. They will be laying the 2” surface. Seal-O-Matic has started at the north west end of the site. 4:49pm The surface is type 3. They have just pulled off the parking lot and are moving to the south side of the building for the patch.
Street - Wedge Lift Passed 12/23/2020
Misc
Informational
12/19/2020
12-19-20 8:50am The first truck has arrived. Seal-O-Matic is laying the 4” base for the parking lot. The air temperature is 34 degrees and the base is 35. They have tac coated the curb and are starting on the far west side. Temperature out of the truck are 270 degrees. 300 on the ground. I took a picture of one of the base tickets Seal- O-Matic going to email copies of all of them. PSI is on site for testing. 11:39am They have worked there way around to the south east side of the site and all temps are good. 1:33pm They have completed the parking lot and are moving to the south of St. Luke’s for a patch.
Pavement-Proof Roll Passed 12/23/2020
Misc
Informational
12/07/2020
12-7-20 8:25am The temperature outside is 33 degrees and the ground is shooting 29 to 30 with the temp gun. 12-7-20 We can not proof roll at this time. 2:40pm We proof rolled the parking lot for curb and parking. It has passed everywhere with one correction that needs to be made at the north east corner at the storm box. Approximately 30’ will need reworked.
Pavement-Curb Construction Passed 12/23/2020
Misc
Informational
12/09/2020
12-8-20 11:24am They are pouring the curb with KCMMB4K mix and are using white cure. 1:23pm All of the machine curb is poured. They will start working on setting up hand pours. 12-9-20 8:59AM They are setting up more hand pours and will be pouring at approximately 9:30am. They are using white cure. 11:11am George Shaw Have poured the curb at the west side of the site and are now pouring at the east side of the site. They are working on the radius and storm box throat. 2:20pm They are finishing up on the curb at the west side. They will cure and curb will be complete.
Pavement-Aggregate Base Passed 12/23/2020
Misc
Informational
12/04/2020
12-4-20 11:07am They have the Geo-grid in place and are laying the base rock.
Water Line - Construction Inspection Passed 12/23/2020
Misc
Informational
11/04/2020
11-4-20 10:45am Rodriguez is on site moving the irrigation valve.
Pavement-Surface Passed 12/23/2020
Site Visit Partial 12/28/2020
Misc
Informational
12/21/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
12/28/2020
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces.
Site Visit Partial 12/29/2020 12/29/2020 12/29/2020
Misc
Informational
12/28/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
12/28/2020
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather.
Site Visit Partial 12/30/2020
Misc
Informational
12/29/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
12/29/2020
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled.
Site Visit Partial 01/05/2021
Misc
Informational
12/30/2020
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
12/30/2020
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place.
Site Visit Partial 1/14/2021 1/14/2021 01/14/2021
Misc
Informational
01/05/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
01/05/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights.
Sidewalk Inspection Partial 01/20/2021
Misc
Informational
01/20/2021
1-20-21 10:087am Rodriguez is on site laying base for the sidewalk on the south side of the site. They are using a compactor on the base and have no forms set.
Erosion Control Inspection Partial 1/20/2021 1/20/2021 01/20/2021
Misc
Informational
12/11/2020
10-23-20 9:35am Raining. All erosion controls are in place and working at this time. 11-10-20 2:41pm All erosion controls are in place and working at this time. 11-23-20 1:36pm All of the erosion controls are in place and working at this time. 11-25-20 9:38am The rain has stopped and the erosion controls are in place and working at this time. 12-11-20 7:53am Light rain. All erosion controls are in place and working at this time. 1-20-21 10:12am All erosion controls are in place and working at this time. There is some debris around a storm inlet that I will have them clean.
Sidewalk Inspection Partial 1/22/2021 1/22/2021 01/22/2021
Misc
Informational
01/20/2021
1-20-21 10:087am Rodriguez is on site laying base for the sidewalk on the south side of the site. They are using a compactor on the base and have no forms set. 1-22-21 8:12am They are forming up the sidewalk and will be pouring at approximately 11:30am. 11:11AM The forms are set. 1:56pm The sidewalk is being poured. They will cover with blankets due to temps.
Sidewalk Inspection Partial 01/25/2021
Misc
Informational
01/22/2021
1-20-21 10:087am Rodriguez is on site laying base for the sidewalk on the south side of the site. They are using a compactor on the base and have no forms set. 1-22-21 8:12am They are forming up the sidewalk and will be pouring at approximately 11:30am. 11:11AM The forms are set. 1:56pm The sidewalk is being poured. They will cover with blankets due to temps. 1-25-21 8:10am The sidewalk is covered with blankets. I will check for ADA compliant at a later date.
Site Visit Partial 01/29/2021
Misc
Informational
01/14/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
01/14/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights. 1-29-21 9:14am There is no work taking place.
Site Visit Partial 02/02/2021
Misc
Informational
01/29/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
01/29/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights. 1-29-21 9:14am There is no work taking place. 2-2-21 9:15am There no work taking place. There is grading that needs to take place and vegetation.
Site Visit Partial 02/09/2021
Misc
Informational
02/02/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
02/02/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights. 1-29-21 9:14am There is no work taking place. 2-2-21 9:15am There no work taking place. There is grading that needs to take place and vegetation. 2-9-21 7:28am Snow. There is no work taking place. There is no erosion control issues.
Site Visit Partial 02/10/2021
Misc
Informational
02/09/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
02/09/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights. 1-29-21 9:14am There is no work taking place. 2-2-21 9:15am There no work taking place. There is grading that needs to take place and vegetation. 2-9-21 7:28am Snow. There is no work taking place. There is no erosion control issues. 2-10-21 11:37am There is no work being done today.
Site Visit Partial 02/18/2021
Misc
Informational
02/10/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
02/10/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights. 1-29-21 9:14am There is no work taking place. 2-2-21 9:15am There no work taking place. There is grading that needs to take place and vegetation. 2-9-21 7:28am Snow. There is no work taking place. There is no erosion control issues. 2-10-21 11:37am There is no work being done today. 2-18-21 7:57am The site is covered in snow.
Site Visit Partial 3/1/2021 3/1/2021 03/01/2021
Misc
Informational
02/18/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
02/18/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights. 1-29-21 9:14am There is no work taking place. 2-2-21 9:15am There no work taking place. There is grading that needs to take place and vegetation. 2-9-21 7:28am Snow. There is no work taking place. There is no erosion control issues. 2-10-21 11:37am There is no work being done today. 2-18-21 7:57am The site is covered in snow. 3-1-21 8:25am There is no activity on site.
Site Visit Partial 3/9/2021 3/9/2021 03/09/2021
Misc
Informational
03/01/2021
10-15-20 8:08am There is no work on site at this time. 10-22-20 8:19am There is no work taking place today. 10-23-20 9:39am Raining. There is no work on site today. 10-27-20 10:16am There is no work on site today. 10-28-20 10:27am no work on site today. 11-5-20 2:28pm Blue Cedar Landscape is on site. 11-6-20 10:41am There is no work taking place at this time. 11-9-20 11:10am There is no work taking place on site today. 11-11-20 10:10am There is a crew of two on site hooking up irrigation. 11-12-20 7:39am There is no work taking place at this time. 11-13-20 7:59am No work on site at this time. 11-16-20 10:16am There is a crew grading on the site. 11-17-20 2:42pm Rodriguez is grading the Noth side of the site. 11-18-20 8:48am They are bringing in dirt in for fill on the North West side. 11-19-20 9:19am There is no work on site at this time. 11-19-20 9:24am They are adding fill on the north west corner. 11-20-20 9:36am Rodriguez is grading out the lot. 11-23-20 9:27am Rodriguez is installling string line rods for grading. 11-24-20 8:11am There is no work on site due to weather. 11-30-20 8:03am There is a crew on site setting up string line. 12-10-20 7:32am George Shaw is on site wrecking forms and starting to backfill behind the curbs. 12-14-20 7:28am There is no work on site at this time. 12-15-20 8:03am There is no work taking place. 12-16-20 1:49pm A few forms were wrecked and no other work is taking place. When the weather is warmer they want to lay asphalt base. 12-17-20 1:26PM The site is ready for asphalt. They will be laying the base on Sat. 12-19-20. 12-21-20 7:34am The base asphalt is down and looks good. They will be laying the surface on Tuesday.12-22-20.
Misc
Informational
03/01/2021
12-28-20 10:29am K&G Striping is on site laying out for the parking spaces. 12-29-20 No work do to weather. 12-30-20 They have striped the parking lot and have not back filled. 1-5-21 9:25am There is a crew on site piking upo string line rods. No other work is taking place. 1-14-21 8:09am They are working on grading behind the curbs and wiring for parking lot lights. 1-29-21 9:14am There is no work taking place. 2-2-21 9:15am There no work taking place. There is grading that needs to take place and vegetation. 2-9-21 7:28am Snow. There is no work taking place. There is no erosion control issues. 2-10-21 11:37am There is no work being done today. 2-18-21 7:57am The site is covered in snow. 3-1-21 8:25am There is no activity on site. 3-9-21 11:31am They have trees planted but no ground coverage.
Sidewalk Inspection Passed 03/15/2021
Misc
Informational
01/25/2021
1-20-21 10:087am Rodriguez is on site laying base for the sidewalk on the south side of the site. They are using a compactor on the base and have no forms set. 1-22-21 8:12am They are forming up the sidewalk and will be pouring at approximately 11:30am. 11:11AM The forms are set. 1:56pm The sidewalk is being poured. They will cover with blankets due to temps. 1-25-21 8:10am The sidewalk is covered with blankets. I will check for ADA compliant at a later date.
Erosion Control Inspection Partial 03/15/2021
Misc
Informational
01/20/2021
10-23-20 9:35am Raining. All erosion controls are in place and working at this time. 11-10-20 2:41pm All erosion controls are in place and working at this time. 11-23-20 1:36pm All of the erosion controls are in place and working at this time. 11-25-20 9:38am The rain has stopped and the erosion controls are in place and working at this time. 12-11-20 7:53am Light rain. All erosion controls are in place and working at this time. 1-20-21 10:12am All erosion controls are in place and working at this time. There is some debris around a storm inlet that I will have them clean. 3-15-21 9:23am They have laid sod and put down erosion control mats.
ESC - (Vegetation/Ground Cover) Passed 4/20/2021 04/20/2021
Occupancy Inspection - Engineering Passed 4/27/2021 04/27/2021
Misc
Informational
04/27/2021
All the parking lot has been completed. There is no items for a punch list. Full occupancy can be given.
Final Inspection - Commercial Passed 6/8/2021 06/08/2021
Documents & Images
Date Uploaded File Type Document Name
09/24/2020 Specifications St Lukes East Campus Submittal (Gen only) PRT
09/24/2020 Letter License Tax Not Applicable
09/24/2020 Approved Plans Approved -St Luke's North Parking-2020-08-25--Civil, Landscape & Lighting
09/24/2020 Letter DS Building Permit
09/30/2020 Letter INSPECTION SUMMARY
10/01/2020 Storm pipe.jpg
10/01/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/12/2020 Letter INSPECTION SUMMARY
10/12/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/20/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/27/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
10/30/2020 Letter Codes Plan Review Conditions
11/04/2020 Letter INSPECTION SUMMARY
11/04/2020 Letter INSPECTION SUMMARY
11/05/2020 Letter INSPECTION SUMMARY
11/06/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/19/2020 Letter INSPECTION SUMMARY
11/19/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/30/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/09/2020 Letter INSPECTION SUMMARY
12/09/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/14/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter INSPECTION SUMMARY
12/19/2020 Base ticket.jpg
12/19/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/22/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/23/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/29/2020 Letter INSPECTION SUMMARY
12/30/2020 Letter INSPECTION SUMMARY
01/05/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter INSPECTION SUMMARY
01/29/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/09/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
03/01/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
04/20/2021 Letter DE-Certificate of Final Acceptance (Commercial)
04/20/2021 Saint Luke's East - NE Parking Lot Expansion and Generator Final Acceptance
04/27/2021 Letter Field Certificate of Occupancy
06/08/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: